ML20057A264
| ML20057A264 | |
| Person / Time | |
|---|---|
| Issue date: | 08/31/1984 |
| From: | Cunningham R NRC |
| To: | Jennifer Davis, Mausshardt D NRC |
| Shared Package | |
| ML20057A246 | List: |
| References | |
| NUDOCS 9309130296 | |
| Download: ML20057A264 (2) | |
Text
.__
1
[. r..
i UN:TED sTI TEs
[.
NUCLEAR REGULATORY CO!/JJ.1SSION
.ee.ssmotovc:: us T,'f i
S...... /
I,c3 : ; 334
- te :: ;;hn G. Oavis
- nald 5. Maussnero SUS;ECT: STEEL C;NTAMINATICN WITH CDEALT-50 IMPORTED FROM TAIWAN:
PRELIMINARY NOTES ON FOLLOW-UP 'CTIONS i
i A PN fr:m Region V is to address what is presently known about very icw.
level c: tait-60 c:ntamination in plumoing fixtures imported frem Taiwan.
l On August 31 a c:nference call was held with participants fr:m fM55. IE.
j Regien V, IP, SP, PA ano EDO.
The following acticns were agreed upon.
1.
Regien V t: prepare the FN whicn in addition to re:crting the j
l facts will c:mpare the level of ::ntamination in the steel a
products to NRC dec ntamination criteria for facilities and equipment.
PN to be sent to the C =ission on August 31.
J 2.
17 to notify the Taiwanese of the centamination with two objectives:
i 4
Point out that they might have a more severe radiological a.
hazard in their manufacturing plants, ano b.
To begin looking for the sour:e of contaminatien and the se:pe of c:ntamination preblem.
Taiwanese contact to be made by August 31.
3.
Regien V to participate with the State of California in analysis t
cf samples to, assure timely results and acprepriate analysis, If the California efforts are not sufficient, Re t
an independent analysis (perhaps at Livermore). gion V to obtain 4
Regien Y to join the State of California in determining from the l
importer the secpe of distributien of products that are potentially
~
contaminated.
5.
- M55 to notify Custems at Washincton office of what has transpired.
l 6.
IE. throu h emercency response system, to notify DOE, FEMA, EPA, i
HHS, and C:=issioners' assistants of what has happened, J
9309130296 041130 PDR DRG NOMA
~ - - " ~ ~ ~ '
~ ~ ~ ~ ' ' '
"~
t
.'::nn 2.
avis t
- r.zid S. Mausshar:: AUG 31 ~534 i
7.
!? :: notify State Ce ar:=ent.
5.
To care, no ;ress release by California has been issuec, nor to our knowle:;e any inquiry from the press.
Obtair.e agreement fr:m all parties that inquiries from the press will be referred to PA wne would res::nd and seek assistance frem te:nnical staff, as necessary.
9.
Bill Thomosen to be designated Project Manager for 'N55 to compile records of the incident.
NMSS volunteered to prepare the report, bewever, IE apparently has some problem with that. He issue has yet to be settled.
However. FC is proceecing :n :ne assumotion na we will repare ne report.
~
~
Richard E. Cunningnam c::
R.,G.
Page LL T. Thompson R. Wilde i
O l
i I
_ - - _ _ - _ _ _