Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000320/LER-1982-012-03, /03L-0:on 820416,fuel Handling Bldg Exhaust Flowrate Indicated Below Tech Spec Ref Level.Cause Not Determined.Exhaust & Supply Fans Restarted.Investigation Continuing + (ML20053A185)
- ML20053A186 + (ML20053A186)
- ML20053A187 + (ML20053A187)
- ML20053A188 + (ML20053A188)
- ML20053A189 + (ML20053A189)
- 05000373/LER-1982-009, Forwards LER 82-009/03L-0 + (ML20053A190)
- ML20053A192 + (ML20053A192)
- ML20053A193 + (ML20053A193)
- 05000336/LER-1982-013, Forwards LER 82-013/03L-0 + (ML20053A194)
- ML20053A196 + (ML20053A196)
- ML20053A198 + (ML20053A198)
- 05000373/LER-1982-006, Forwards LER 82-006/03L-0 + (ML20053A200)
- ML20053A202 + (ML20053A202)
- ML20053A203 + (ML20053A203)
- 05000373/LER-1982-009-03, /03L-0:on 820505,during Surveillance,Level Scram Switch 1B21-NO24D Had Excessive Hysterisis.Caused by Switch Cam Rubbing Against Switch Plate Spacer.Work Request Initiated 820506 & Level Switch Declared Operable + (ML20053A205)
- ML20053A206 + (ML20053A206)
- ML20053A207 + (ML20053A207)
- ML20053A208 + (ML20053A208)
- ML20053A209 + (ML20053A209)
- ML20053A210 + (ML20053A210)
- ML20053A211 + (ML20053A211)
- ML20053A212 + (ML20053A212)
- ML20053A213 + (ML20053A213)
- ML20053A214 + (ML20053A214)
- ML20053A215 + (ML20053A215)
- 05000336/LER-1982-013-03, /03L-0:on 820417,while at 100% Steady State Operation,Grounded Bus Traced to 2-CH-514 (Boric Acid Emergency Supply Charging Pump Suction).Plant Trip Occurred. Caused by Ground on Motor Valve Operator Overheating + (ML20053A216)
- IR 05000305/1982004 + (ML20053A217)
- IR 05000277/1981028 + (ML20053A218)
- ML20053A220 + (ML20053A220)
- ML20053A221 + (ML20053A221)
- 05000373/LER-1982-006-03, /03L-0:on 820419,one Shift Channel Was Missed During Reactor Bldg in Fuel Pool Vent Exhaust Radiation Channel Check.Caused by Misinterpretation of Tech Specs. Personnel Reinstructed + (ML20053A223)
- ML20053A224 + (ML20053A224)
- ML20053A225 + (ML20053A225)
- ML20053A226 + (ML20053A226)
- ML20053A227 + (ML20053A227)
- ML20053A228 + (ML20053A228)
- ML20053A229 + (ML20053A229)
- ML20053A230 + (ML20053A230)
- RBG-12-642, Final Deficiency Rept Re Pump Seal Cooling Water Piping Supplied by Byron Jackson Pump Div,Initially Reported 771202.Pump Returned for Hydrotesting of Subassembly. Deficiency Determined Not Reportable Per 10CFR50.55(e) + (ML20053A231)
- ML20053A232 + (ML20053A232)
- ML20053A234 + (ML20053A234)
- ML20053A235 + (ML20053A235)
- PNO-IV-82-017, on 820518,dosimetry Vendor Informed That Finger Badge from Reactor Operator Read 180 Rem (Gamma).Work Performed by Operator in Late Apr 1982 Involved Handling of Activation Products in Reactor Bldg + (ML20053A236)
- ML20053A237 + (ML20053A237)
- ML20053A238 + (ML20053A238)
- ML20053A239 + (ML20053A239)
- RBG-12-644, Deficiency Rept Re Insufficient End Gap of Beam Between Drywell Wall & Primary Shield Wall,Initially Reported 820302.Util Continuing Evaluation.Next Rept by 820709 + (ML20053A240)
- ML20053A241 + (ML20053A241)
- ML20053A242 + (ML20053A242)
- ML20053A243 + (ML20053A243)
- ML20053A244 + (ML20053A244)