OP-2-1 Fort Calhoun Station Unit No. 1 C.y&

Plant Startup from Cold Shutdevn to Hot Standby OP-2 I.

General This procedure describes the star *,up of the reactor plant from a refueling condition or cold shutdown condition to hot standby with the reactor critical at less and 2% power.

SHIFf DATE SUPV.

II.

Initial Conditions TIME INITIAL

~

1.

Plant Master Check List OP-1 has been co=pleted w

to ensure all associated syste=s are ready for reactor start-up.

2.

RC loop filling, venting, and leak testing operations (if required) have been completed in accordance with OI-RC-2.

3.

All the Prerequisites of OI-RC-3 (RC system start-up) have been met.

III.

Precautions 1.

Criticality must be anticipated whenever a g,g t-heat-up is in progress.

2.

Decay heat re= oval capability =ust be =aintained in accordance with the Tech. Specs. 2.1.1.

3 During heat-up JLQ boron DILUTION is permitted.

h.

Do not operate :: ore than three RC pu=ps when the RC system temperature is belov 500 F.

5 Note all Precautions listed in OI-RC-3 IV.

Irocedure h#@

1.

Perform plant start-up in accordance with OI-RC-3 2.

Take the reactor critical in accordance with OP-7

.:~

.(}

JULg733,3 1

8205250070 020517 R3 7-21-73 PDR ADOCK 05000285 P

PDR