n Fort Calhoun Station Unit Ho. 1 Reacter Shutde n OP-8 SHE" SU?V.

.W OATE/ TIME INI'IAL I.

General This procedure describes the steps to be taken to shutdevn the reactor frc= a het standby condition to a hot shutdevn condition.

II.

Initial Canditions Reactor and steam plant conditions are stabilized at the hot standby condition in accordance with OP-5

/

III.

Precautiens 1.

The reacter =ust never be =aintained critical below the power dependent insertion li=its.

2.

Eoren DILUTICH =ust never be perfe:=ed while shutting down the reactor. Make-up to the RC system vill be at a boren concentration that is equal to or greater than the boren concentration in the RC system.

3.

The shutdevn CEA groups must never be inserted b::M:-

below their exercise limit until all regulating CEA's are inserted.

h.

After a substantial change in reactor coolant boren concentration (6 eater than 50 pp=) the pressurizer spray valves should be operated at mn-* u= spray, consistant with pressure require-

=ents, until the bcron concentration differential t

between the pressurizer water and the locp water is less than 10 pp=.

5 Maintain T constant throughout this procedure avg by use of the stea= du=p and bypass system.

l I7.

Precedure 1.

Shutdown the reactor by inserting the regulating CIA groups in the =anual sequential =cde in accordance with OI.RR-1.

/

HOTE:

If the ec=puter is unavailable, use the

=anual peup =ede of control vnile = sin-taining proper group everlap by use of

}.9919{.y the red gcup everlap curve.

\\.

,a U

1 I w N' ' #m M J

. 3 r,T o9107Q

~. -

8205250102 820517

' ~

PDR ADDCK 05000285

- m --

c

-w P

PDR.

m

.=, A, m. -- -

OP-3-2 e

e

  1. v 8s C MM- - -

L?~~

IV.

Precedure (Continued).

DATI/Tr4E I'iTTIAL 2.

Observe the following during insertion of the h

regulating CIA's:

a.

Monitor all vide range log nuclear instru=ents.

b.

At 10 h'" power ensure that the high power rate of change trip is bypassed auto-

=atically.

When the r-a ctor.,*cver has been reduced c.

to the 10-g/10-8 d range (belov 10 cys) turn off the RFS 3-10 detector cutout switches (light off) and ensure that high voltag: has been aute=atically 10 applied to the B detectors of the vide range log channels.

d.

Activate the audible count rate system.

e.

Each inserted CEA reaches its lover electrical limit.

/

3.

Fully vithdraw the partial length CEA's in accordance with OI-RR-1.

/

e,.

C UOTE:

Partial length CEA's =ay be "ully inserted at this ti=e if a cecidown is planned.

h.

Insert Shutdown groups A and B in accordance with OI-RR-1.

/

5 Ecrate (if required) to obtain a new RCS bcron i

concentraticn which meets the shutdown =arS n requirements cf Tech. Spec. 2.10.2.

Use the hot shutdown baron concentration curve in the Technical Data Scok to dete. ine the required bcron concentration.

/

6.

'4 hen all shutdown and regulating CEA's have been verified to be at the icver electrical limit, place the Red Control Mode Selecter Switch to the "0FF" pcsition.

/

NOTE:

"41th all shutdevn and re5ulati 5

? ? ' -.... s CIA's in the core, reactivity is

..E'[M.

adjusted by adjusting the beren E

- ~e concentration in the RC syste=.

w 5

e

  • % 1 *. '_

(,

v : v _ -. w v

-12 s;

- - n -.~. L :-

w

_ _ w. -

2.

w-j

CP-8-3 e

' i.

SEIF" SUFV 17.

Procedu e (Ccntinued)

DATI/ TEE EC AL Psea 7-

""*== "'" "

'7"'*= '" ="" ' " * " ' ' * -

(532 F.).

/

HOTI:

If a short duration shutdovn is planned, all RC pu=ps should be left running.

The starting of RC punps with the RC syste= at operating te=perature introduces a significant te=perature transient on the RC pt.p seals and therefore such operation should be minimized.

8.

If a ecoldcyn is required, cooldown in accord-ance with OP-6 after borating the RCS (if required) to obtain the cold shutdown boren concentration (as determined frc= the cold shutdown boron concentration curre in the Technical Data Bock) or the refueling concen-

/

tration.