Forwards IE Insp Rept 50-305/82-04 on 820201-28 & 0301-31. No Noncompliance Noted
ML20053A203
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/10/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mathews E
WISCONSIN PUBLIC SERVICE CORP.
Shared Package
ML20053A204 List:
References
NUDOCS 8205250077
Download: ML20053A203 (2)


See also: IR 05000305/1982004

Text

"

.

.

.

MAY 101982

Docket No. 50-305

Wisconsin Public Service

Corporation

NITN:

Mr. E. R. Mathews

Senior Vice President

Power Supply and

Engineering

Post Office Box 1200

Green Bay, WI 54305

Gentlemen:

This refers to the routine safety inspection conducted by Mr. B. E. Fitzpatrick

of this office on February 1-28 and March 1-31, 1982, of activities at Kewaunee

Nuclear Power Plant authorized by NRC Operating License No. DPR-43 and to the

discussion of our findings with Mr. D. C. Hintz at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

torviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

,

{

days from the date of this letter of your intention to file a request for

l

withholding; and (b) submit within twenty-five (25) days from the date of this

'

letter a written application to this office to withhold such information.

If

l

your receipt of this letter has been delayed such that less than seven (7)

i

days are available for your review, please notify this office promptly so that

a new duc date may be established. Consistent with Section 2.790(b)(1), any

such application must be accompanied by an affidavit executed by the owner of

,

the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons which are the bases for the

i

l

t

t

l

8205250077 820510

l

l

PDR ADOCK 05000305

I

I

G

$II I

PDR

- . - - . .

. - -

-

- - . -

SEo/

e

e

.

Wisconsin Public Service

2

Corporation

claim that the information should be withheld frcm public disclosure. This

section further requires the statement to address with specificity the con-

siderations listed in 10 CFR 2.790(b)(4).

The information sought to be

withheld shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear from you in this regard within the specified

periods noted above, a copy of this letter and the enclosed inspection report

will be placed in the Public Document Room.

We will gladif discuss any questions you have concerning this inspection.

Sincerely,

" Original signed by R.L. Spessard"

R. L. Spessard, Director

Division of Project and

Resident Programs

Enclosure:

Inspection Report

No. 50-305/82-04(DPRP)

cc w/ enc 1:

D. C. liintz, Plant

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Inspector

Stanley York, Chairman

Public Service Commission

/

{y'1