Text
"
.
.
.
MAY 101982
Docket No. 50-305
Wisconsin Public Service
Corporation
NITN:
Mr. E. R. Mathews
Senior Vice President
Power Supply and
Engineering
Post Office Box 1200
Green Bay, WI 54305
Gentlemen:
This refers to the routine safety inspection conducted by Mr. B. E. Fitzpatrick
of this office on February 1-28 and March 1-31, 1982, of activities at Kewaunee
Nuclear Power Plant authorized by NRC Operating License No. DPR-43 and to the
discussion of our findings with Mr. D. C. Hintz at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
torviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
,
{
days from the date of this letter of your intention to file a request for
l
withholding; and (b) submit within twenty-five (25) days from the date of this
'
letter a written application to this office to withhold such information.
If
l
your receipt of this letter has been delayed such that less than seven (7)
i
days are available for your review, please notify this office promptly so that
a new duc date may be established. Consistent with Section 2.790(b)(1), any
such application must be accompanied by an affidavit executed by the owner of
,
the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons which are the bases for the
i
l
t
t
l
8205250077 820510
l
l
PDR ADOCK 05000305
I
I
G
$II I
- . - - . .
. - -
-
- - . -
SEo/
e
e
.
Wisconsin Public Service
2
Corporation
claim that the information should be withheld frcm public disclosure. This
section further requires the statement to address with specificity the con-
siderations listed in 10 CFR 2.790(b)(4).
The information sought to be
withheld shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the specified
periods noted above, a copy of this letter and the enclosed inspection report
will be placed in the Public Document Room.
We will gladif discuss any questions you have concerning this inspection.
Sincerely,
" Original signed by R.L. Spessard"
R. L. Spessard, Director
Division of Project and
Resident Programs
Enclosure:
Inspection Report
No. 50-305/82-04(DPRP)
cc w/ enc 1:
D. C. liintz, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief