ML20053A206
| ML20053A206 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 12/12/1972 |
| From: | OMAHA PUBLIC POWER DISTRICT |
| To: | |
| Shared Package | |
| ML20053A183 | List: |
| References | |
| NUDOCS 8205250079 | |
| Download: ML20053A206 (1) | |
Text
{{#Wiki_filter:OP-6-1 Fort Calhoun Station Unit No. 1 .Q Hot Standby to Cold Condtion OP-6 I. General ,h This procedure describes the nor=al shutdcvn of the plant from a hot standb condition with the reactor critical at low power ( ) 10-{,5 and ( 25) to a refueling or cold shutdown condition. SHIFT DATE SUPV. II. Initial Conditions TIyE INITIAL 1. Reactor and steam plant conditions are stabilized at the hot standby condition in accordance with OP-5. 2. All the Prerequisites of OI-RC-h (RC system nor=al shutdown) have been met. III. Precautions All the Precautions of CI-RC k have been noted. IV. Proceduie hx 1. Shutdevn the reactor in accordance with OP-8 yy 2. Ccolicvn the plant in accordance with OI-RC h. Th ',~) p }.; n ~, '.,',A.,-A. ; ' 'a - :; 8205250079 820517 .'l di i'.-) DEC 12132 P PDR ^ R2 11~.20~72 PDR ADOCK 05000285 w _., _ _ a _. -.
== -a _}}