Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20052E247 + (ML20052E247)
- ML20052E248 + (ML20052E248)
- PLA-1073, Final Deficiency Rept Re Design of Emergency Core Cooling Pump Circuit Breakers,Initially Reported 810921.Mod to Eliminate Sneak Circuits Issued by Bechtel.Also Reportable Per Part 21 + (ML20052E249)
- ML20052E252 + (ML20052E252)
- ML20052E255 + (ML20052E255)
- ML20052E256 + (ML20052E256)
- ML20052E257 + (ML20052E257)
- ML20052E259 + (ML20052E259)
- ML20052E260 + (ML20052E260)
- B10490, Final Significant Deficiency Rept Re Potential for Loss of All Auxiliary Feedwater Following Small Steam Line Rupture Referenced in .Evaluation Determined That Deficiency Does Not Exist + (ML20052E262)
- ML20052E263 + (ML20052E263)
- ML20052E264 + (ML20052E264)
- ML20052E266 + (ML20052E266)
- ML20052E267 + (ML20052E267)
- ML20052E268 + (ML20052E268)
- ML20052E269 + (ML20052E269)
- 05000344/LER-1982-005, Forwards LER 82-005/03L-0.Detailed Event Analysis Encl + (ML20052E270)
- 05000318/LER-1982-016, Forwards LER 82-016/03L-0 + (ML20052E272)
- 05000344/LER-1982-005-03, /03L-0:on 820331,failure to Perform Component Cooling Water Valve Cycling at Required Frequency Discovered.Caused by Personnel Error.Schedule Corrected + (ML20052E274)
- ML20052E275 + (ML20052E275)
- 05000318/LER-1982-016-03, /03L-0:on 820402,during Normal Power Operation, Plant Computer Failed,Resulting in Loss of CEA Pulse Counting Sys & Incore Detection Sys.Apparently Caused by Intermittent Signal.Computer Restarted by Bootstrapping + (ML20052E276)
- ML20052E277 + (ML20052E277)
- 05000333/LER-1982-017, Forwards LER 82-017/03L-0 + (ML20052E278)
- ML20052E280 + (ML20052E280)
- 05000333/LER-1982-017-03, /03L-0:on 820402,MSIV 10% Closure Position Switches on Two Valves Did Not Trip When Tested.Caused by Mechanical Drift of Valve Position Switch Operating Cams. Adjustment Made + (ML20052E281)
- ML20052E283 + (ML20052E283)
- ML20052E284 + (ML20052E284)
- ML20052E285 + (ML20052E285)
- ML20052E286 + (ML20052E286)
- ML20052E292 + (ML20052E292)
- ML20052E296 + (ML20052E296)
- ML20052E298 + (ML20052E298)
- ML20052E299 + (ML20052E299)
- ML20052E300 + (ML20052E300)
- ML20052E301 + (ML20052E301)
- ML20052E312 + (ML20052E312)
- ML20052E313 + (ML20052E313)
- ML20052E314 + (ML20052E314)
- ML20052E316 + (ML20052E316)
- ML20052E317 + (ML20052E317)
- ML20052E318 + (ML20052E318)
- ML20052E319 + (ML20052E319)
- ML20052E320 + (ML20052E320)
- W3P82-1074, Forwards Public Version of Clarification of D Perrotti 820410 Testimony,Question 10 on Page 11 Re Facility Emergency Plan.Plan Will Be Revised to Reflect That Operational Hotline Will Be Primary Communication W/La + (ML20052E322)
- ML20052E323 + (ML20052E323)
- ML20052E325 + (ML20052E325)
- ML20052E327 + (ML20052E327)
- ML20052E329 + (ML20052E329)
- ML20052E330 + (ML20052E330)
- ML20052E331 + (ML20052E331)
- ML20052E332 + (ML20052E332)