ML20052E247
| ML20052E247 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 04/26/1982 |
| From: | Morisi A BOSTON EDISON CO. |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| References | |
| 82-112, NUDOCS 8205100233 | |
| Download: ML20052E247 (3) | |
Text
__
soeton esseow coweauv e... = a m... ese w.-....,
c..
... - -. m oai.
L
- a. v. me g,
p Acril 26, 1982 mee6saa mesmus es ** *m s.,
7 g
BEco. Lti. 882 !!'
44Yr L
E
(,'*
lb. Domenic S. Vassallo, Chief therating Reactors Branch 82 i
/
Division of Licensing l.
Office of Nuclear Reactor Regulation T+-
5.5. Nuclear Regulatory Come ssion f'
Washington, D. C.'
20555 go License No. OPR-35 Docket No. 50-293
.[, '
1 Cogletion Dates of Fire Protection flodifications a
References:
(a) IWit Letter dated 2/24/82, Thorus T. Martin (s-to W. D. Harrington (b) IWIC Safety Evaluation Reoort Dated 12/15/M.
/
t
. T. A. Ippolito to A. V. Morisi I
(c) MCo Letter *82-;1. Dated 1/18/82. A. V.
Morisi t'o T. A. Ipoolito (d) SER Dated Deceder 1978 a
(e) NCo Letter 978-135 Dated 2/27/78. G. C.
- J Andegnini to D. L. Ziemann ECo Letter #W-38 Dated 2/29/80. G. C.
(f) Andegnini to T. A. Ippolito l
Seer Ste:'
fj'1histletterprovi yes with a sta tus of the foll owin g fi re pro tec t i on rod i f i c a t ' on s et Pilgris Nuclear Station:
- 1., Fire Protection Deluse System for the $taney Eas Treatment Systr e
e
-la Besten Edison Caugssy's (SECo.'s) January 13, 1982 l ette r f rom A. v. $'a ri s t to E's E. J. Brunner, SEco requested an entension for completion of the ~od-
~., '
ificattens to the Stan6y Gas Treatment Fire Protection Deluge Syster.
This L
entenstee sees ge: 3ted via the IWtC's letter. Reference (a) for cowletior it.
l April 19N. SEtx v.es completed the modifications testing, operator troninc and applicable oev edure changes by the Ancil 1982 estension date orante' 4
i by the IRC.
?
2.
Pgaggregion Jgals. Itas J.119 of SER Dated DeLeaber 21, 1978 t
la Reference'(b) the E stated that Boston Edison's prooosed a mdtnr
- r. '
i tretion seets is response to the requirements of Itee 3.1.1'.i of tre 9
g s g'i~ r'" g',,
w na taher 31. 1978 SER umuld meet the requirement < d e
Appendix R to N C N N.
g
i Enemose coneemssv nic S. Vassalle, Chief
[-
April 26, 1982
-Page 2 l
l l
All penetration seals that were recomended for upgrading have beer co ;'ete l
as of March 19, 1982.
(7
-3.
Cable Spf3.ading Appa 92 System In Reference (c) *5pecial Reprt - CSR CO2 System Corrective Actions",
.. SECe previded the NRC with its engineering evaluations of the CO2 Dumo
. A. 5. - -. Test that was conducted for the CSR on October 26, 1981. At the time of K {.#,
the Reference (c);"$pecial Report", BECo could not recor..end an alternate I
' suppression system to replace the CO2 system because the enaineering evalu-yJ.l.E ' ' ' etions accessary'tB choose an alternate system were in progress, fif (. ' -Sosten.fdison has completed these essluations and has chosen a total ggf floddine Halon121-tem for the CSR.
The schedule for comoletion gQ tof the installation' >
t' this system will be addressed in the inteorated te sur etter to D. G. Eise+ut dated Aroll 16,14R2.
The P
h".T, Jtes dis 4ussed,3
! e existingt
$Wtten has been made inocerable and a continuous fire watch is jg:,yunintal
- f>the requirements of Section 3.12.D of Technical Soecification.
,g;g n '
a
,.d4.;yesefGeneraterteam
- Isl RefItrence.N) $ pecific Plant Arees". Its 5.19.6 "$1odifications" bales
- s 6
tseet G.
,r" protect the generator, controls and air intakes from 7
s. 4teridler
'ef.
rge. This mo:ification is not applicable to W5 for X ' M flBI i
a Y,.
. g.,5 e <
+
~'
in; f;' D. :
1hF tem in each of the Diesel Generator Rooms is a preaction etygg tea.
g
& R:j., J;QW, y
/.f E M k
@fesel Gemeester %eas "A" and "S" are' served by separate f;,
6tten of 'these proposed systers could affect the Se;peute system; however, the redundant units and 18 h J P.
. ;;1:. :
?
'esW3engted tysbarriers. This separation will prevent
'hs t. < Caf asCthe deter suppression system in either area
.,f T y % : %
- t. @ y u 199 both units.
' f,.,p
.y
- N 3 3. r r.:3+ Cy 9
te n.
- .5%..
3 a:
v.-
s 8 ~.hb
,,,,,M'h Mtect' ten Review" letter of 197,8, SECo comitted to 4
- l. ' t
' deleg,tiset:la' sis-(6) control room panels. idhen the SER, 4.dl M ies 3 sues WC stated in Section'5.15.6 that fire detection i
f;%?
gnBI tSEE 4e ' installed in seven control room panels. Th e k l. f..
g
,Sig (8) panels as originall stated in' Reference (e)
C.
es'stSted in the SER, Reference (y).
d This information has g9 est
- glM, prIDetous;ly' hep tt 18tR in 8ECo's letter of February 29, 19 80 Reference
.. f).
2
.t f..- 3' '.
[l s' s-
% 4.
k */:
_Y J.,.c g;.
gs:
z n...z-g.
9.
,.,M y
~
i l
emoven soieon cessem l
Mr. Comenic 8. Vassallo Chief i
April 26,1982 h9e 3 We trust the above information is rTsponsive to your needs; however, snould you require any additional information olease do not hesitate to contact us.
I Very truly yours,
6 Y
r i
i l
h I
P; r
I I
l
--ns---
-...