Provides Status of Fire Protection Mods,Including Deluge Sys for Standby Gas Treatment Sys,Penetration Seals,Cable Spreading Room Carbon Dioxide Sys Diesel Generator Room & Control Room
ML20052E247
Person / Time
Site: Pilgrim
Issue date: 04/26/1982
From: Morisi A
BOSTON EDISON CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
References
82-112, NUDOCS 8205100233
Download: ML20052E247 (3)


Text

__

soeton esseow coweauv e... = a m... ese w.-....,

c..

... - -. m oai.

L

a. v. me g,

p Acril 26, 1982 mee6saa mesmus es ** *m s.,

7 g

BEco. Lti. 882 !!'

44Yr L

E

(,'*

lb. Domenic S. Vassallo, Chief therating Reactors Branch 82 i

/

Division of Licensing l.

Office of Nuclear Reactor Regulation T+-

5.5. Nuclear Regulatory Come ssion f'

Washington, D. C.'

20555 go License No. OPR-35 Docket No. 50-293

.[, '

1 Cogletion Dates of Fire Protection flodifications a

References:

(a) IWit Letter dated 2/24/82, Thorus T. Martin (s-to W. D. Harrington (b) IWIC Safety Evaluation Reoort Dated 12/15/M.

/

t

. T. A. Ippolito to A. V. Morisi I

(c) MCo Letter *82-;1. Dated 1/18/82. A. V.

Morisi t'o T. A. Ipoolito (d) SER Dated Deceder 1978 a

(e) NCo Letter 978-135 Dated 2/27/78. G. C.

J Andegnini to D. L. Ziemann ECo Letter #W-38 Dated 2/29/80. G. C.

(f) Andegnini to T. A. Ippolito l

Seer Ste:'

fj'1histletterprovi yes with a sta tus of the foll owin g fi re pro tec t i on rod i f i c a t ' on s et Pilgris Nuclear Station:

1., Fire Protection Deluse System for the $taney Eas Treatment Systr e

e

-la Besten Edison Caugssy's (SECo.'s) January 13, 1982 l ette r f rom A. v. $'a ri s t to E's E. J. Brunner, SEco requested an entension for completion of the ~od-

~., '

ificattens to the Stan6y Gas Treatment Fire Protection Deluge Syster.

This L

entenstee sees ge: 3ted via the IWtC's letter. Reference (a) for cowletior it.

l April 19N. SEtx v.es completed the modifications testing, operator troninc and applicable oev edure changes by the Ancil 1982 estension date orante' 4

i by the IRC.

?

2.

Pgaggregion Jgals. Itas J.119 of SER Dated DeLeaber 21, 1978 t

la Reference'(b) the E stated that Boston Edison's prooosed a mdtnr

r. '

i tretion seets is response to the requirements of Itee 3.1.1'.i of tre 9

g s g'i~ r'" g',,

w na taher 31. 1978 SER umuld meet the requirement < d e

Appendix R to N C N N.

g

i Enemose coneemssv nic S. Vassalle, Chief

[-

April 26, 1982

-Page 2 l

l l

All penetration seals that were recomended for upgrading have beer co ;'ete l

as of March 19, 1982.

(7

-3.

Cable Spf3.ading Appa 92 System In Reference (c) *5pecial Reprt - CSR CO2 System Corrective Actions",

.. SECe previded the NRC with its engineering evaluations of the CO2 Dumo

. A. 5. - -. Test that was conducted for the CSR on October 26, 1981. At the time of K {.#,

the Reference (c);"$pecial Report", BECo could not recor..end an alternate I

' suppression system to replace the CO2 system because the enaineering evalu-yJ.l.E ' ' ' etions accessary'tB choose an alternate system were in progress, fif (. ' -Sosten.fdison has completed these essluations and has chosen a total ggf floddine Halon121-tem for the CSR.

The schedule for comoletion gQ tof the installation' >

t' this system will be addressed in the inteorated te sur etter to D. G. Eise+ut dated Aroll 16,14R2.

The P

h".T, Jtes dis 4ussed,3

! e existingt

$Wtten has been made inocerable and a continuous fire watch is jg:,yunintal

- f>the requirements of Section 3.12.D of Technical Soecification.

,g;g n '

a

,.d4.;yesefGeneraterteam

Isl RefItrence.N) $ pecific Plant Arees". Its 5.19.6 "$1odifications" bales
  • s 6

tseet G.

,r" protect the generator, controls and air intakes from 7

s. 4teridler

'ef.

rge. This mo:ification is not applicable to W5 for X ' M flBI i

a Y,.

. g.,5 e <

+

~'

in; f;' D. :

1hF tem in each of the Diesel Generator Rooms is a preaction etygg tea.

g

& R:j., J;QW, y

/.f E M k

@fesel Gemeester %eas "A" and "S" are' served by separate f;,

6tten of 'these proposed systers could affect the Se;peute system; however, the redundant units and 18 h J P.

. ;;1:. :

?

'esW3engted tysbarriers. This separation will prevent

'hs t. < Caf asCthe deter suppression system in either area

.,f T y % : %

t. @ y u 199 both units.

' f,.,p

.y

  1. N 3 3. r r.:3+ Cy 9

te n.

.5%..

3 a:

v.-

s 8 ~.hb

,,,,,M'h Mtect' ten Review" letter of 197,8, SECo comitted to 4

l. ' t

' deleg,tiset:la' sis-(6) control room panels. idhen the SER, 4.dl M ies 3 sues WC stated in Section'5.15.6 that fire detection i

f;%?

gnBI tSEE 4e ' installed in seven control room panels. Th e k l. f..

g

,Sig (8) panels as originall stated in' Reference (e)

C.

es'stSted in the SER, Reference (y).

d This information has g9 est

glM, prIDetous;ly' hep tt 18tR in 8ECo's letter of February 29, 19 80 Reference

.. f).

2

.t f..- 3' '.

[l s' s-

% 4.

k */:

_Y J.,.c g;.

gs:

z n...z-g.

9.

,.,M y

~

i l

emoven soieon cessem l

Mr. Comenic 8. Vassallo Chief i

April 26,1982 h9e 3 We trust the above information is rTsponsive to your needs; however, snould you require any additional information olease do not hesitate to contact us.