OPU Nuclear P.O. Box 480
')
g g{
Middletown, Pennsylvan.ia 17057 717-944-7621 Writer's Direct Dial Number:
May 4, 1982 5211-82-097 l\\.
t t
REC 5ygn
_9 Director of Nuclear Reactor Regulation M47 7 y b
( N atte k 7 0 Actn: John F. Stolz Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission 4
Washington, D.C.
20555 TG
Dear Sir:
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. D?R-50 Docket No. 50-289 Control of Heavy Loads Enclosed please find our revised response to Item 2 of our letter of February 17, 1981 (TLL 474) concerning procedures to be written by June 30, 1982. The date of June 30, 1982 was originally selected as a refueling date based on an assumed Restart date of June 30, 1981 which had previously been used for plan-ning purposes. The need for these procedures has been reevaluated as documented in the enclosure to this letter.
Sincerely,
- 1. D. Hakill Director, TMI-l HDH:CWS:vj f Enclosure k
8205100242 820504 k
PDRADOCK05000g P
GPU Nuclear is a part of the General Public Utilities System
Table 3.1-1 Item Controlling procedure or status A.
PWR - Refueling Building 1.
. Spent Fuel Shipping Cask No procedure is required at;this time, since a Spent Fuel Shipping Cask is not permitted in the TMI-l Fuel Handling Building (See Teca Spec 3.11.7).
2.
Pool Divider Cates
.No procedure is required at this time, since the pool divider gate has been moved from its functional location to its storage location per. Tech. Spec. 3.11.8 in 1979. Further. moves
'are prohibited by Tech Spec 3.11.6.
3.
Fuel Transfer Canal Maintenance Procedure 1505-4 and 1506-8.
Door 4.
Irradiated Specimen No procedure is required.at this time, since Shipping Cask no irradiated specimens are currently at TMI-1 and the specimen tubes have been removed (the last specimens were removed in 1974).
5.
Plant Equipment Maintenance Procedure 1507-2 (greater than one ton) 6.
Spend Resin, Filter Or.
Maintenance Procedure 1507-2 Other Shipping Container 7.
New Fuel Shipping Maintenance Procedure 1505-3 Container 8.
Failed Fuel Container No procedure is required since the containers do not meet the requirements of a heavy load-(460 lbs.).
9.
Fuel Transfer Canal Maintenance Procedure 1505-3 B.
PWR Containment Building 1.
Reactor Vessel Head Maintenance Procedures 1504-7 and 1506-7 2.
Upper Internals Maintenance 1594-5 and 1506-1 3.
In Service Inspection Not applicable.
Tool-
t t
No procedure has been issued nor is one 4.
Reactor Coolant Pumps-contemplated for the near future.
Because this represents a major plant' evolution such a procedure.need only be developed when the 4
evolution is-being planned and will require considerable consultation with the equipment vendor.
5.-
Missile Shields' The procedure for handling missile shields
' s expected to be issued by June 30, 1982.