ML20052E269
| ML20052E269 | |
| Person / Time | |
|---|---|
| Site: | 07000025 |
| Issue date: | 05/03/1982 |
| From: | Mcqueen A, Schuster, Schwan C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML20052E261 | List: |
| References | |
| 70-0025-82-04, 70-25-82-4, NUDOCS 8205100262 | |
| Download: ML20052E269 (2) | |
Text
.
The information on this page is considered to be appropriabe for public disclosure pursuant to 10 CFR 2.790.
U.S. flUCLEAR REGULATORY COMMISSION Region V Report flo. 70-25/82-04 (IE-V-497)
Docket flo. 70-25 License fio. SNM-21 Safeguards Group Licensee: Energy Systems Group - Rockwell Internatioiial 8900 De Soto Avenue Canoga Park, California 91304 Facility flame: De Soto Facility Inspection at: Canoga Park, California Inspection Conducted:
April 19-23, 1982 Date of Last Physical Security Inspection Visit:
February 16-19, 1932 Type of Inspection: Routine,Unannoupced Physical Protection Inspectors:
A$
[gg/1/[d t,
K.'scnwan, Fnysicai Protection speciaiisc
.D' ate Signed h
U00m _
1} di lW2-A.
- v. McQueen, FDysical ProbecElon speclal15L
(/Date'$igned Date Signed Approved by: /)7)h dw s-/g/gy M. D. Schuster, Chief, Physical Security Section Date Signed Inspection Summary:
Areas Inspected: Security Plan and Procedures; Security Organization -
Management; Security Organization - Response; Records and Reports; Physical Barriers-PA; Physical Barriers-VA, f1AA; Security System Power Supply; Lighting; Assessment / Surveillance Aids; Access Control - Personnel; Access Control -
Packages; Access Control - Vehicles; Detection Aids - PA; Detection Aids -
VA, MAA; Alarm Stations; Communications; Follow-up on Outstanding Items; Follow-up on Noncompliance; and Independent Effort.
The inspection involved a total of 64 inspector hours onsite by two NRC inspectors.
The inspection began during the day shift period; 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> were conducted during non-regular hours.
Results:
The licensee was found to be in compliance with NRC requirements within the areas examined during the~ inspection.
DOh oh$25 PDR
_.