IE Safeguards Insp Rept 70-0025/82-04 on 820419-23.No Noncompliance Noted.Major Areas Inspected:Security Plan & Procedures,Records & Repts,Security Sys Power Supply & Personnel Access Control.Details Withheld (Ref 10CFR2.790)
ML20052E269
Person / Time
Site: 07000025
Issue date: 05/03/1982
From: Mcqueen A, Schuster, Schwan C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20052E261 List:
References
70-0025-82-04, 70-25-82-4, NUDOCS 8205100262
Download: ML20052E269 (2)


Text

.

The information on this page is considered to be appropriabe for public disclosure pursuant to 10 CFR 2.790.

U.S. flUCLEAR REGULATORY COMMISSION Region V Report flo. 70-25/82-04 (IE-V-497)

Docket flo. 70-25 License fio. SNM-21 Safeguards Group Licensee: Energy Systems Group - Rockwell Internatioiial 8900 De Soto Avenue Canoga Park, California 91304 Facility flame: De Soto Facility Inspection at: Canoga Park, California Inspection Conducted:

April 19-23, 1982 Date of Last Physical Security Inspection Visit:

February 16-19, 1932 Type of Inspection: Routine,Unannoupced Physical Protection Inspectors:

A$

[gg/1/[d t,

K.'scnwan, Fnysicai Protection speciaiisc

.D' ate Signed h

U00m _

1} di lW2-A.

v. McQueen, FDysical ProbecElon speclal15L

(/Date'$igned Date Signed Approved by: /)7)h dw s-/g/gy M. D. Schuster, Chief, Physical Security Section Date Signed Inspection Summary:

Areas Inspected: Security Plan and Procedures; Security Organization -

Management; Security Organization - Response; Records and Reports; Physical Barriers-PA; Physical Barriers-VA, f1AA; Security System Power Supply; Lighting; Assessment / Surveillance Aids; Access Control - Personnel; Access Control -

Packages; Access Control - Vehicles; Detection Aids - PA; Detection Aids -

VA, MAA; Alarm Stations; Communications; Follow-up on Outstanding Items; Follow-up on Noncompliance; and Independent Effort.

The inspection involved a total of 64 inspector hours onsite by two NRC inspectors.

The inspection began during the day shift period; 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> were conducted during non-regular hours.

Results:

The licensee was found to be in compliance with NRC requirements within the areas examined during the~ inspection.