Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20044A986 + (ML20044A986)
- 05000454/LER-1989-005-01, :on 890501,diesel Generator 1A Failed to Load to 5,500 Kw within 60 as Required.Caused by Max Fuel Setting on Fuel Control Sys Being Set Too Low.Vendor Instructions Added to Maint Procedures + (ML20044A987)
- ML20044A988 + (ML20044A988)
- ML20044A990 + (ML20044A990)
- ML20044A992 + (ML20044A992)
- IR 05000254/1990008 + (ML20044A993)
- ML20044A994 + (ML20044A994)
- ML20044A995 + (ML20044A995)
- ML20044A996 + (ML20044A996)
- IR 05000282/1990011 + (ML20044A998)
- W3P90-1159, Monthly Operating Rept for June 1990 for Waterford 3.W/ + (ML20044A999)
- ML20044B000 + (ML20044B000)
- ML20044B001 + (ML20044B001)
- ML20044B002 + (ML20044B002)
- ML20044B003 + (ML20044B003)
- ML20044B004 + (ML20044B004)
- IR 05000440/1990010 + (ML20044B006)
- ML20044B007 + (ML20044B007)
- ML20044B008 + (ML20044B008)
- 05000254/LER-1990-011, :on 900611,diesel Fire Pump 1/2 a Out of Svc for Period Exceeding 7 Days Reporting Criteria,To Install New Suction Line.Caused by Required Maint Work.Repairs Completed & Pump Tested & Returned to Svc + (ML20044B009)
- PNO-III-90-047, on 900711,problem Experienced W/Flow Control Valve in Reactor Circulation Sys B & When Pump Shifted to Fast Speed,Loose Parts Alarm Received.Degrading Seal on Pump Will Be Replaced.State Notified + (ML20044B010)
- ML20044B011 + (ML20044B011)
- ML20044B012 + (ML20044B012)
- 05000285/LER-1990-018, :on 900612,reactor Protective Sys (RPS) Trip Units for Axial Power Distribution Determined to Be Inoperable.Caused by Procedural Deficiencies.Procedure Revised & RPS Surveillance Tests Reviewed + (ML20044B013)
- 05000409/LER-1990-003, :on 900608,five Required Fire Protection QA Audits Missed.Caused by Scheduling Error Since 890101.Util Reverted to Original QA Audit Schedule + (ML20044B014)
- ML20044B015 + (ML20044B015)
- ML20044B016 + (ML20044B016)
- ML20044B018 + (ML20044B018)
- ML20044B019 + (ML20044B019)
- ML20044B020 + (ML20044B020)
- ML20044B022 + (ML20044B022)
- ML20044B024 + (ML20044B024)
- ML20044B025 + (ML20044B025)
- ML20044B028 + (ML20044B028)
- ML20044B029 + (ML20044B029)
- ML20044B031 + (ML20044B031)
- IR 05000338/1990011 + (ML20044B033)
- ML20044B034 + (ML20044B034)
- ML20044B036 + (ML20044B036)
- ML20044B037 + (ML20044B037)
- ML20044B039 + (ML20044B039)
- ML20044B040 + (ML20044B040)
- ML20044B042 + (ML20044B042)
- 05000336/LER-1990-007-02, :on 900611,discovered That Surveillance Procedure 2609E Re Encl Bldg Filtration Sys Testing - Refueling Not Performed Prior to Entering Mode 4.Caused by Personnel Error.Missed Surveillance Performed + (ML20044B044)
- ML20044B045 + (ML20044B045)
- ML20044B048 + (ML20044B048)
- ML20044B050 + (ML20044B050)
- ML20044B051 + (ML20044B051)
- ML20044B052 + (ML20044B052)
- 05000295/LER-1990-013, :on 900612,discovered That Both Primary Water Makeup Isolation Valve & Emergency Makeup Isolation Valve to Isolation Valve Seal Water Tank Closed.Caused by Procedural Deficiency.Scope of Instruction SOI-7 Expanded + (ML20044B054)
- ML20044B055 + (ML20044B055)