p, a'.,,
++ L L'
"E Portland General Electric Company
, Trojan Nuclear Plant-1.71760 Columbia River llwy Rainier, OreFon 97048 (503) 5564713 July 6, 1990 WRR-022-90 US Nuclear Regulatory Commission-Document Control Desk if Washington, DC 20555 n:
. Gentlemen:
Monthly Operating Report d-In accordance with the Trojan. Nuclear Plant Technical Specifications reporting requirements,.the Monthly Operating Data Report is submitted for June, 1990.
Sincerely, L
Lk u&
W..R. Robinson Plant General Manager W
. RR:sp Attachment et Mr. John B. Martin Regional' Administrator, Region V US Nuclear Regulatory Commission Mr. David. Stewart-Smith Department of. Energy c, n W.
. State of. Oregon
-Resident Inspector
'MOR Distribution 9007170137 900630 PDR ADOC); 0500gg4 r6M iy
4-
._t i'J ' 7.
.c
+
TROJAN NUCLEAR PLANT
-Trojan Operating Report June, 1990 4
f OPERATIONS-n The plant begsn the month in Mode 5 with the Reactor Coolant System filled.
The Integrated Leak Rate Test, which started May 29th, was
"", ! I successfully completed'on June 3rd.
?-
The RCS was vented and bubble established in the pressurizer on-June lith.
W. R. Robinson assumed ~ the duties of the Plant. General Manager on June 15th. Major plat.t secondary systems were filled and vented by June 18th.
Necessary surveillances were completed and the plant entered mode 4 on.
- June 25th for crevice flushing of the steam generators. -The plant returned.to mode 5 on June 26th, at the completion of crevice' flushing..After drain and refill of the steam generators, the startup
'from the11990 refueling outage commenced. Mode 3.was reached on June
' 28th but; returned to mode 4 when a problem with the seismic mounting of the auxiliary feedwater pump controis was identified. This was
- resolved and the plant returned to mode 3 on June 29th.-
o-MAJOR MAINTENANCE COMPLETED:
-Significant Maintenance completed during the month:
Flush of the main turbine oil system.
Replaced bad cells in the "B" trsin 125V DC battery.
Reworked Ray Chem splices in electrical penetration assemblies.
Inspection of control board and electrical / instrument cabinet t,
wiring terminations.
Inspection of RCP fly wheels.
Approved AL/
) Adhe N.._ )
Plant General Manager 5'
-fa
i c,
OPERATING DATA REPORT 4
50-344-DOCKET NO.
DATE Aly.1990 COMPLETED gY F.
J.
Ulmer 1
TELEPHONE 503-556-3713 Ext.4495 OPERATING STATUS Trojan Nuclear Plant NMe8 1.~ Unit Name:
June,-1990
. 2. Reporting Period:
3411
+
- 3. Licensed Thermal Power (MWt):
1216 4, Narneplete Rating (Gross MWe):
11 "
- 5. Design Electrical Rating (Not MWe):
1133
- 6. Maximum Dependable Capecity (Gross MWe):
1095
' 7. Maximum Dependable Capacity (Net MWe):
- g. If Changes Occur in Capacity Ratings (iteens Number 3 Through 7) Since Last Report, Give Reasons:
N/A' N/A
- 9. Power Level To Whleh Restricted,lf Any (Not MWe):
- 10. Reasons For Restrictions.lf Any:
N/A
~ This Month YrAo Date Commandve 720 4343 121223
- 11. Hours la Reporting Pm6ed 0
1870 s 76g7n y
- 13. Number Of Homes Rosetor was Critical 0
0 3,a7
- 13. Rosetor Reserve Shandows Hours o
I870.5 73244.7
- 14. Hours Generator On Line 0
0 3249 IS. Unit Reserve Shutdown Homes 0
6340999 83251850
- 16. Geous Thermal Eaevsy Generated (MWM).
0 2126910-77497749
- 17. Gross Electrical Energy Generated (MWH)
-8703 2016842 73413069
- 18. Not Ilestrieel Energy Generated (WWM; O
43.I 60.4
- 19. Unit Service Factor 0
43.I 63.I'
- 20. Unit Availability Facto,
-1.1 42.4 56.5
- 21. Unit Capacity Factor (Using MDC Not) -
-1.1 41.I 53.6
- 22. Unit Capacity Fe.:t ('l.;i s CER Net) 0 1.3 12.9
- 23. Unli rceswd Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Montha ; Tyre. Dete,and Durat6on of Eacht:
3 Jub,
0
- 25. If Shut Down At End Of Report Period Estimated Date of Startsp:
- 26. Unit:In Test Status irrior io Commercial Operation):
Forecast Achieved N^
"^
INITIAL CRITICALITY N/A M/A INITIAL ELECTrtCITY N/A N/A COMMERCIAL Of ERATION (o/77)
-r AVERAGE DAILY UNIT POWER LEVEL-l I
DOCKET NO: 50-344 UNIT: Trojan DATE: J uly, 1990 COMPLETED BY:_F.
J. U1mer TELEPHONE m y 6.T711' ext 4495
]
MONTH ' June, 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i
-(MWe-Net)
(MWe-Net) 1
-4 17
-14 2
-4 18
-15 3 19
-11 4
-4 20
-10
-i 5
-5 21
-11 6
-4 22
-11 7
~4 23
-14 d--
8
-4 24
-31
-5 9
25
-25 10
-4
.26
-20 11
-9 27
-25 12
' -5 28
-32 1
13-
-5 29
-32 14
-5 30
-34 15
-6 31 r
-7 16
,.w INSTRUCTIONS i
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to.the nearest whole megawatt.
(9/77)
~
..r-
=-
a DOCKET NO.'. 5 0- 34 4 UNIT SIRJTDOWNS AND POWER REDUCTIONS
- UNIT NASSE Trnjan
- DATE. Julv _ 1990 N.HD W ' E -
1-In -
'REFORT MONTH 3"=. 1990 TER.EF980NE 503-556-3713 ext 4495 d
"L I 8c888t' g*L 43 e
c.
s Cause A Consective.
-2E E
g5g W.
Danc
.33 g
,, g,
- wne my E_.3 w,,,
3 j4g Rep==t
- A0 ju w he
- el
.6 900321 S
720' C
N/A N/A N/A Annua 1' Refueling Outage i
l l
t l
l t
l i
l.'
t i
?
?
4
?
3 Exhible G-Indea I
2 Meshod:
1-Manuel
. for Pteperselon eif Dess F: FovceJ Reason:
S: Scheduled A Eqelpinent Faltese(Explain) 244sneelScrosa.
Ensey Sheets for tJeessee
. 8 Maineenence of Test Ewsw Repart (t.ER) FWe tNUREG-
= J-Ameasusste Se:ess.'
(
. D Regelseory ReserIction.
4-Osher(Emplois) ~
0868).
C. Refueling -
l ~-
E-Openstor Training & IJcense Exasuinselon
- 5
~ F-Adninisstative
~
E.sidple t -Szenc Sooke G-Operational Essieg tEmplain).
~~
t Il Othes (Emplaies)
's 17 71
.. ~ _ _ _ _... _ _ _ _ _ _ _ _,.