Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20042G363 + (ML20042G363)
- ML20042G366 + (ML20042G366)
- ML20042G369 + (ML20042G369)
- ML20042G373 + (ML20042G373)
- ML20042G375 + (ML20042G375)
- ML20042G377 + (ML20042G377)
- ML20042G379 + (ML20042G379)
- ML20042G382 + (ML20042G382)
- ML20042G383 + (ML20042G383)
- ML20042G385 + (ML20042G385)
- ML20042G387 + (ML20042G387)
- ML20042G390 + (ML20042G390)
- ML20042G393 + (ML20042G393)
- ML20042G394 + (ML20042G394)
- ML20042G395 + (ML20042G395)
- ML20042G396 + (ML20042G396)
- ML20042G397 + (ML20042G397)
- IR 05000352/1990013 + (ML20042G399)
- ML20042G400 + (ML20042G400)
- ML20042G401 + (ML20042G401)
- ML20042G403 + (ML20042G403)
- IR 05000219/1990008 + (ML20042G405)
- ML20042G407 + (ML20042G407)
- ML20042G409 + (ML20042G409)
- ML20042G411 + (ML20042G411)
- ML20042G415 + (ML20042G415)
- ML20042G417 + (ML20042G417)
- ML20042G419 + (ML20042G419)
- 05000267/LER-1990-001, :on 900410,non-essential Bus 5,4160/480-volt Transformer N-9215 Experienced Fault.Caused by Breakdown of Insulation on Secondary Coils of Transformer.Coils of Transformer Rewound + (ML20042G421)
- ML20042G428 + (ML20042G428)
- ML20042G429 + (ML20042G429)
- ML20042G431 + (ML20042G431)
- ML20042G437 + (ML20042G437)
- ML20042G442 + (ML20042G442)
- ML20042G444 + (ML20042G444)
- ML20042G445 + (ML20042G445)
- ML20042G446 + (ML20042G446)
- ML20042G447 + (ML20042G447)
- ML20042G448 + (ML20042G448)
- 05000458/LER-1990-013, :on 900405,discovered That Control Bldg Chiller Motor Current Limiter C Set Incorrectly at 56% Instead of 100%.Caused by Incorrect Setting & Maint Activities.Loop Calibr Data Sheet Revised + (ML20042G450)
- ML20042G451 + (ML20042G451)
- 05000317/LER-1990-015, :on 900407,discovered That Relay Contact Which Actuates Reactor Trip Breaker Shunt Trip Not Adequately Functionally Tested.Caused by Failure to Examine Circuit in Detail When Test Developed + (ML20042G452)
- 05000458/LER-1990-014, :on 900407,reactor Scram Occurred While Testing Main Turbine Combined Intermediate Valves.Caused by Low Pressure Signal from Emergency Trip Sys of Electrohydraulic Control Sys.Two Solenoid Valves Replaced + (ML20042G453)
- ML20042G454 + (ML20042G454)
- 05000259/LER-1990-005-01, :on 900404,discovered That Compensatory Sample for Raw Cooling Water Sys Inadequately Taken.Caused by Personnel Error.Individual Counseled on Importance of Procedural Compliance.Required Sample Taken + (ML20042G456)
- PNO-III-90-030, on 900508,shutdown Occurred After Two Diesel Generators Declared Inoperable.Damaged Supports for Svc Water Piping Identified & Thermal Expansion Bellows Found Missing.Safety Significance Analyzed.State of Il Notified + (ML20042G457)
- ML20042G458 + (ML20042G458)
- ML20042G464 + (ML20042G464)
- ML20042G465 + (ML20042G465)
- LIC-90-0419, Forwards Application for Amend to License DPR-40,changing Chemical & Vol Control Sys + (ML20042G467)
- ML20042G470 + (ML20042G470)