ML20042G385

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 900326-30.Violation Noted: on 900330,inspector Determined That Security Personnel Not Being Tested for Glaucoma
ML20042G385
Person / Time
Site: Peach Bottom  
Issue date: 05/03/1990
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20042G384 List:
References
50-277-90-08, 50-277-90-8, 50-278-90-08, 50-278-90-8, NUDOCS 9005140180
Download: ML20042G385 (1)


Text

"

[? g

' ~

p ;m w

v.

G h

l T

APPENDIX A 3

"2 NOTICE OF VIOLATION Philadelphia Electric Company License No. OPR-44

. c l'

Peach Bottom Atomic 1 Power Station, Units 2 and:3 DPR-56

}

l t

As a result of theLinspection conducted on March 26 to March 30, 1990, and in' accordance with the NRC Enforcement Policy, (10 CFR Part:2,- Appendix! C),,the

.following violation was identified:

j T

The-Peach Bottom Atomic Power Station Guard. Training and-Qualification Plan,

- dated Juns,1986,' Section 1.2.1. (1) states, in part, that glaucoma: shall be.

r

. disqualifying, unless controlled-by acceptable medical.or surgicalmeans.

.j Contrary to the above, on March 29, 1990,- the inspector determined'that security personnel;were not being tested foriglaucoma.

This:is a Severity Level V Violation (Supplement III)'.

I e

' Pursuant.to the provisions of 10 CFR 2.201, Philadelphia Electric' Company is hereby required'to submit to this office within thirty days of the date of the

-letter which transmitted this Notice, a written statement or explanation.in

reply, including:

(1) the corrective steps which have been.take'n and the results achieved;-(2) corrective steps which will be taken-to avoid.further violations; and (3) the date when full; compliance will be-achieved. Where good-cause is shown, consideration will be given to extending this response: time.

y

~

f i

Lj i

t i

1 i

[

]

(

. l l

0FFICIAL RECORD COPY SG CIR.PB 90-08/08 - 0004.0.0 e

05/03/90 9005140180 900503 PDR ADOCK0500g7 o

e

,