ML20042G385
| ML20042G385 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 05/03/1990 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20042G384 | List: |
| References | |
| 50-277-90-08, 50-277-90-8, 50-278-90-08, 50-278-90-8, NUDOCS 9005140180 | |
| Download: ML20042G385 (1) | |
Text
"
[? g
' ~
p ;m w
v.
G h
l T
APPENDIX A 3
"2 NOTICE OF VIOLATION Philadelphia Electric Company License No. OPR-44
. c l'
Peach Bottom Atomic 1 Power Station, Units 2 and:3 DPR-56
}
l t
As a result of theLinspection conducted on March 26 to March 30, 1990, and in' accordance with the NRC Enforcement Policy, (10 CFR Part:2,- Appendix! C),,the
.following violation was identified:
j T
The-Peach Bottom Atomic Power Station Guard. Training and-Qualification Plan,
- dated Juns,1986,' Section 1.2.1. (1) states, in part, that glaucoma: shall be.
r
. disqualifying, unless controlled-by acceptable medical.or surgicalmeans.
.j Contrary to the above, on March 29, 1990,- the inspector determined'that security personnel;were not being tested foriglaucoma.
This:is a Severity Level V Violation (Supplement III)'.
I e
' Pursuant.to the provisions of 10 CFR 2.201, Philadelphia Electric' Company is hereby required'to submit to this office within thirty days of the date of the
-letter which transmitted this Notice, a written statement or explanation.in
- reply, including:
(1) the corrective steps which have been.take'n and the results achieved;-(2) corrective steps which will be taken-to avoid.further violations; and (3) the date when full; compliance will be-achieved. Where good-cause is shown, consideration will be given to extending this response: time.
y
~
f i
Lj i
t i
1 i
[
]
(
. l l
0FFICIAL RECORD COPY SG CIR.PB 90-08/08 - 0004.0.0 e
05/03/90 9005140180 900503 PDR ADOCK0500g7 o
e
,