Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000339/LER-1993-001-02, :on 930322,discovered That power-range Nuclear Instrument Inoperable for More than 1 H W/O Being Placed in Trip.Caused by Inadequate self-check & Personnel Error.Channel Placed in Trip Condition + (ML20035E793)
- ML20035E794 + (ML20035E794)
- ML20035E795 + (ML20035E795)
- PY-CEI-NRR-1638, Forwards Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers. Util 930724 & 0930 Responses to NRC Bulletin 92-001 Outlined Compensatory Measures Initiated in Late 1991 for All Plant Areas Protected by Subj Fire Barrier Sys + (ML20035E796)
- ML20035E797 + (ML20035E797)
- ML20035E799 + (ML20035E799)
- 05000440/LER-1993-008, :on 930317,fire Detection Malfunctioning Resulted in Fire Protection Program Violation.Caused by Equipment Malfunctioning & Design.Administrative Controls Implemented to Update Alarm State Changes + (ML20035E800)
- 05000213/LER-1992-020, :on 920727,wide Range SG Level Channel Declared Inoperable.Caused by Implementation of Std Instrumentation Action Statement W/O Associated Hardware. Channel Restored to Operability + (ML20035E801)
- ML20035E802 + (ML20035E802)
- ML20035E803 + (ML20035E803)
- ML20035E805 + (ML20035E805)
- ST-HL-AE-4389, Forwards Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers. Thermo-Lag Being Treated as Inoperable & Compensatory Measures Established,Per NRC Bulletin 92-001 & Suppl 1 to Bulletin + (ML20035E807)
- ML20035E808 + (ML20035E808)
- ML20035E811 + (ML20035E811)
- ML20035E813 + (ML20035E813)
- ML20035E814 + (ML20035E814)
- ML20035E815 + (ML20035E815)
- ML20035E816 + (ML20035E816)
- ML20035E817 + (ML20035E817)
- ML20035E818 + (ML20035E818)
- ML20035E819 + (ML20035E819)
- ML20035E820 + (ML20035E820)
- ML20035E821 + (ML20035E821)
- ML20035E822 + (ML20035E822)
- ML20035E826 + (ML20035E826)
- ML20035E830 + (ML20035E830)
- PY-CEI-NRR-1636, Forwards Response to 930319 Info Request Re Concern W/Access Authorization Activities.Encl Withheld (Ref 10CFR2.790) + (ML20035E838)
- ML20035E842 + (ML20035E842)
- ML20035E844 + (ML20035E844)
- HL-3250, Forwards Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers + (ML20035E846)
- ML20035E847 + (ML20035E847)
- ML20035E850 + (ML20035E850)
- ML20035E851 + (ML20035E851)
- ML20035E852 + (ML20035E852)
- ML20035E853 + (ML20035E853)
- ML20035E854 + (ML20035E854)
- ML20035E855 + (ML20035E855)
- ML20035E856 + (ML20035E856)
- ML20035E857 + (ML20035E857)
- PY-CEI-NRR-1637, Monthly Operating Rept for March 1993 for Perry-1 + (ML20035E858)
- 3F0493-01, Monthly Operating Rept for March 1993 for Crystal River Unit-3 + (ML20035E859)
- ML20035E861 + (ML20035E861)
- ML20035E862 + (ML20035E862)
- ML20035E863 + (ML20035E863)
- ML20035E864 + (ML20035E864)
- ML20035E865 + (ML20035E865)
- ML20035E867 + (ML20035E867)
- ST-HL-AE-4409, Monthly Operating Repts for Mar 1993 for South Texas Project Units 1 & 2 + (ML20035E868)
- ML20035E870 + (ML20035E870)
- IR 05000309/1993006 + (ML20035E872)
- ML20035E873 + (ML20035E873)