April 14, 1993 i
Docket No.52-004 Mr. Patrick W. Marriott, Manager Licensing & Consulting Services GE Nuclear Energy 175 Curtner Avenue San Jose, California 95125
Dear Mr. Marriott:
SUBJECT:
QUESTIONS FOR SOCIETA INFORMAZIONI ESPERIENZE TERM 0IDRAULICHE (SIET)
LABORATORIES ON GE NUCLEAR ENERGY'S PANTHERS TEST PROGRAM FOR THE SIMPLIFIED BOILING WATER REACTOR (SBWR)
Enclosed for your information are additional questions that are being for-warded under separate cover by the Nuclear Regulatory Commission (NRC) to SIET Laboratories on the passive containment cooling (PCC) and isolation condenser (IC) tests for the SBWR design. These questions supplement the questions provided in my letter to you dated April 13, 1993, and are likewise meant to l
be focal points for discussion during the NRC and Advisory Committee on Reactor Safeguards staff visit to the PANTHERS test facility in Piacenza, Italy on April 23, 1993. The questions should not be considered NRC staff l
requests for additional information; therefore, written responses from GE are l
not necessary.
Should you have any questions concerning this matter, please contact one of the project managers assigned to the SBWR review, Son Ninh at (301) 504-1125 or me at (301) 504-1178.
Sincerely, Odginal Stens N.
Melinda Malloy, Pr'oject Manager
~
Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
Enclosure:
Additional Questions for SIET on PANTHERS cc w/ enclosure:
See next page DISTRIBUTION (w/ enclosure):
Docket File PDST R/F DCrutchfield 1
PDR RBorchardt JNWilson WTravers MMalloy SNinh l
CPoslusny RHasselberg AThadani/GHolahan, BE23 l
RBarrett, 8H2 RElliott, 8H2 RJones, 8E23 l
Alevin, 8E23 MCullingford, 12G18 BSheron/JMurphy, NLS007 JMoore, 15B18 ACRS (11)
PShea f,M1W6ST:ADAR PDST:ADAR 0FC:
LA:PDST:ADt
\\
NAME: PShea of MMalloy:tz JNWil son DATE: 04/
91 04/d/93 04f /93 0FFICIAL RECORD COPY: SBWR93-9.MM x,C l
..c o l
y '. ' 4 g f)
I 9304190284 930414 7
8 PDR ADOCK 05200004 1 -
i A
PDR cf8
i 4
Mr. Patrick W. Marriott Docket No.52-004 General Electric Company cc:
Mr. Laurence S. Gifford GE Nuclear Energy 12300 Twinbrook Parkway Suite 315 Rockville, Maryland 20852 Director, Criteria & Standards Division Office of Radiation Programs U. S. Environmental Protection Agency 401 M Street, S.W.
Washington, D.C.
20460 Mr. Sterling Franks U. S. Department of Energy NE-42 Washington, D.C.
20585 Mr. Jeffrey C. Baechler GE Nuclear Energy 175 Curtner Avenue, MC-782 San Jose, California 95125 Mr. Frank A. Ross Program Manager, ALWR Office of LWR Safety & Technology U.S. Department of Energy NE-42 19901 Germantown Road Germantown, Maryland 20874
=
i
[
4 i
Additional Questions for SIET on PANTHERS Dr. Ivan Catton of the Advisory Committee on Reactor Safeguards will be i'
accompanying Dr. Murley on the trip, and has requested that the following questions be addressed, in addition to those already provided.
i 1.
Please describe in detail the instrumentation for the PCC and IC heat exchangers and the test loop, and discuss why you believe that the instrumentation will be sufficient to acquire the necessary performance data.
l 2.
For both the PCC and 1C tests, please discuss how the range of non-condensible gas fractions was chosen, and why that range is l
representative of operating conditions in the SBWR. We note that both air and helium (simulating hydrogen) will be used in these tests.
l However, while the air mass flows are shown explicitly on the PCCS test matrix, neither the helium PCC fractions nor the non-condensible (air l
and/or helium) IC fractions are shown on the respective test matrices.
l l
t I
i I
?
l S
9 e
Enclosure
.. -