' Electnc PONER COMPANY 231 w McNp.no Box 2046 Ma.we. wi 53201 Mi4) 221-2345 VPNPD-93-086 i
l April 16, 1993 l
Document Control Desk i
U.S. NUCLEAR REGULATORY COMMISSION Mail Station F1-137 l
Washington, DC 20555 Gentlemen:
DOCKETS 50-266 AND 50-301 RESPONSE TO NRC GENERIC LETTER 92-08 THERMO-LAG 330-1 FIRE BARRIERS l
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers,"
l dated December 17, 1992, requires each licensee to provide a l
written report within 120 days regarding the installation of l
Thermo-Lag.330-1 fire barriers in their plants.
As stated in our July 21, 1992 response to NRC Bulletin 92-01,
" Failure of Thermo-Lag 330-1 Fire Barrier System to Maintain Cabling in Wide Cable Trays and Small Conduits Free from Fire Damage," Wisconsin Electric does not use Thermo-Lag 330 fire barrier systems at its Point Beach Nuclear Plant (PBNP).
INTERAM, a fire-rated barrier system manufactured by the 3M Corporation, has been installed at PBNP on selected raceways to provide separation between redundant shutdown trains to meet i
the requirements of 10 CFR 50, Appendix R, Section III.G.2,
" Fire Protection of Safe Shutdown capability."
Based on the manufacturer's technical information and our preliminary review of the issues identified in Generic Letter 92-08, the INTERAM fire barrier system is capable of performing its intended function at l
PBNP.
l l
Wisconsin Electric is continuing to review and evaluate the information and issues resulting from the Thermo-Lag investigation.
If any future problems with the INTERAM fire barrier system are identified as a result of these evaluations, Wisconsin Electric will promptly inform you of such problems and our-corrective action (s).
190148 g
l
. \\hl\\ lf C L
9304190326 930416 l
PDR ADOCK 05000266 I
f PDR AsubsWmrof11zurnswDayneimrasw
l s
=
Document Control Desk April 15, 1993 1
Page 2 I
If there are any questions regarding this matter, please do not hesitate to contact us.
l t
Sincerely, 7
, g&
a w
+
Bob ink Vice resident Nuclear Power CAK/jg I