i f
Southem Noclear Operating Company Post Offce Box 1295 '.
Birmingham Alabama 35201
)
Triephone 205 868-5086 j
SOuthem Nudear Operating Company J. D. woociard ce Ps gent
~ hesouthemelechicsystem t
l q
April 13,1993 j
l Docket Nos. 50-348
[
l 50-364 U. S. Nuclear Regulatory Commission i
ATTN: Document Control Desk I
Washington, D. C.
20555 Joseph M. Farley Nuclear Plant l
Unit I and 2 Monthly Operatina Data Reports Gentlemen:
Attached are the March 1993 Monthly Ope,ating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the-
)
Technical Specifications.
If you have any questions, please advise.
I Respectfully submitted, l
1 b
dM J.
. Woodard l
AEJ:edb3014 Attachrrents cc:
.Pr. S. D. Ebneter Mr. G. F. Maxwell Mr. G. F. L'under i
k I
s 1
/.
\\
I-930411PO269 930331
-PDR ADOCK 05000348 R
PDR h
i
i i
l i
1 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS I
March 1993 l
At 0524 on 3-6-93, the unit was taken off line for a forced outage. The primary focus of the outage was to replace the #4 governor valve to the main turbine. The unit returned to 100 percent power at 1609 on 3-17-93.
There were no other unit shutdowns or major power reductions during the month
[
l of March.
The following major safety related maintenance was performed during the month:
j l
l 1.
Performed miscellaneous corrective and preventive maintenance on j
the diesel generators.
l l
2.
Replaced the #4 governor valve to the main turbine during the
[
outage.
3.
Replaced the rotor in the #1 river water pump motor.
4.
Repaired the #2 Conoseal on the reactor head during the outage.
l 5.
Repaired the IB main steam atmospheric relief valvt during the outage.
}
i i
I t
t i
4 i
i
OPERATING DATA REPORT 4
00CKET NO.
50-3A8 DATE April 5. 1993 COMPLETED BY R. D. Hill TELEPHONE (205) 899-5156 OPERATING STATUS
- 1. Unit Name:
Joseph M. Farley - Unit 1 Notes
- 2. Reporting Period:
March 1993
- 1) Cumulative data since
- 3. Licensed Thermal Power (MWt):
2.652 12-1-77, date of
- 4. Nameplate Rating (Gross MWe):
860 commercial operation.
- 5. Design Electrical Rating (Net MWe):
829
- 6. Maximum Dependable Capacity (Gross MWe):
855.7 7 Maximum Dependable Capacity (Net MWe):
812.0
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Power level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 744.0 2.160.0 134.400.0
- 12. Number Of Hours Reactor Was Critical 526.6 1.942.6 105.063.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3.650.0
- 14. Hours Generator On-Line 506.9 1.922.9 103.306.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1.293.223.7 4.997.395.7 264.998.471.5
- 17. Gross Electrical Energy Generated (MWH) 415.638,0 1.620.712.0 85.387.514.0
- 18. Net Electrical Energy Generated (MWH) 387.604.0 1.531.336.0 80.597.586.0
- 19. Unit Service Factor 68.1 89.0 76.9
- 20. Unit Availability Factor 68.1 89.0 76.9
- 21. Unit Capacity Factor (Using MDC Net) 64.2 87.3 73.6
- 22. Unit Capacity Factor (Using DER Net) 62.8 85.5 72.3
- 23. Unit Forced Outage Rate 31.9 11.0 6.. P
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CP.ITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 _ 12/01/77 DATARPT.01
DOCKET NO.
50-348 UNIT 1
DATE April 5. 1993 COMPLETED BY R. D. Hill TELEPHONE (205) 899-5156 MONTH March DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 823 17 595 2
820 18 809 3
792 19 813 4
819 20 818 5
819 21 816 6
92 22 815 7
0 23 813 8
0 24 816 9
0 25 817 10 0
26 825 11 0
27 818 12 0
28 817 13 0
29 816 14 0
30 815 15 0
31 810 16 224 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
AVGDLY.PWR
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-348 UNIT NAME J M. F*rity - Unit 1 DATE April 5.1993 _
COMPLETED BY R. D Hill REPORT MONTH: April TELEPHONE (205) 899-5156 ME%D OF UCENSEE CAUSE & CORRECTIVE DURATION
'dUTTif0 EVENT SYSTEM COMPONENT ACTION TO NO.
DATE TYPE' (HOURS)
REASON' 'DOWN REACTOR' REPORT #
CODE
- CODE
- PREVENT RECURRENCE 002 930306 F
237.1 A
1 N/A N/A N/A At 0524 on 3/6/93, the unit was taken off line for a forced outage.
The primary focus of the outage was to replace the #4 governor valve to the main turbine. The unit returned to 100 per:ent power on 3/17/93 at 1600.
1:
2:
3:
4; 5:
F: Forced Reason:
Method:
Exhibit G-Instructions for Exhibit I-Same Source S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations for Data Entry 8 - Maintenance or Test 2 - Manual Scram.
Sheets for Licensee Event C Refueling 3 Automatic Scram.
Report (LER) File (NUREG4161)
D - Regulatory Restriction 4 Other (Explain)
E Operator Training & Ucensing Examination 5
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
a, JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS March 1993 1
1 1
i At 1000 on 3-20-93, the unit was rauped down to 55 percent reactor power to perform maintenance on the 2B steam generator feedwater pump. The unit i
returned to 100 percent power at 0510 on 3-21-93.
There were no other unit shutdowns or major power reductions during the month of March.
The following major safety-related maintenance was performed during the month:
l 1.
Miscellaneous corrective and preventive maintenance was performed l
on the diesel generators.
2.
Eighteen tubes in the 2C component cooling water heat exchanger were plugged.
f i
f f
1 i
I 4
6 i
i I
)
OPERATING DATA REPORT DOCKET NO.
50-364 DATE April 5.1993 L
0 (b5 8 5156 i
l OPERATING STATUS j
- 1. Unit Name:
Joseoh M. Farley - Unit 2
'.htes
- 2. Reporting Period:
March 1993 1)Cualative data since
- 3. Licensed Thermal Power (MWt):
2.652 7-30-81, hte of j
- 4. Nameplate Rating (Gross MWe):
860 commercial operation i
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe):
863.6 l
4 1
7 Maximum Dependable Capacity (Net MWe):
822.0 t
5
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, 2 -
Give Reasons:
N/A
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A l
[
i This Month Yr-to-Date Cumulative i
- 11. Hours In Reporting Period 744.0 2.160.0 102.313.0 i
- 12. Number Of Hours Reactor Was Critical 744.0 2.101.0 88.122.9 i
i
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 li. Hours Generator On-Line 744.0 1.906.0 86.822.7 i
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
- 16. Gross Thermal Energy Generated (MWH) 1.936.119.4 4.929.693.5 221.460.641.3 l
- 17. Gross Electrical Energy Generated (MWH) 637.301.0 1.621.494.,0 72.633.672.0
- 18. Net Electrical Energy Generated (MWH) 606.995.0 1.536.918.0 68.876.116.0
- 19. Unit Service Factor 100.0 88.2 84.9 i
- 20. Unit Availability Factor 100.0 88.2 84.9
[
- 21. Unit Capacity Factor (Using MDC Net) 99.3 86.6 82.1
~
- 22. Unit Capacity Factor (Using DER Net) 98.4 85.8 81.2
- 23. Unit Forced Outage Rate 0.0 11.8 4.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refuelino/ Maintenance Outaae September 24. 1993 Approximately 60 days
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 DATARPT.U2
i DOCKET NO.
50-364
.j UNIT.
2 i
DATE April 5. 1993 i
COMPLETED 8Y R. D. Hill TELEPHONE 1205)'899-5156
'i i
I MONTH March DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 827 17 824 l
t 2
824 18 827 i
3 823 19 828 4
824 20 622 i
5 826 21 776 i
6 827 22 818 7
827 23 817 8
825 24 821 9
823 25 822 10 823 26 820-l 11 827 27 824 12 827 28 822 i
l 13 827 29 823
(
14 826 30 824 15 826 31 816 f
i 16 82t.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
t i
AVGDLY.PWR
<-r y.-
-w.
,--..-.,,x r-m..
.m-
-.,w.-.
y
,,,r-,3 r
r--
r-,.,%.e
UNIT SHUTDOWNS AND POWER REDUCTIONS
^
DOCKET NO.
50-364 UNIT NAME J M Fartov - Unit 2 DATE Aoni5.1993 COMPLETED BY R. D Hill REPORT MONTH: kiril TELEPHONE (205) 899-5156 METHOD OF LICENSEE
. CAUSE & CORRECTrn DURATION SHUTTING EVENT SYSTEM COMPONENT ACTION TO NO.
DATE TYPE' (HOURS)
REASON' DOWN REACTOR' REPORT #
CODE
- CODE
- PREVENT RECURRENCE 002 930320 F
19.2 A
N/A
.N/A N/A N/A At 1000 on 3-20 93, the unit was ramped down to $5 percent reactor power to perform maintenance on the 28 steam generator feedwater pump. The j
unit returned to 100 percent power at 0510 on 3-21-93.
6 9:
2.
3.
4:
5:
F: Forced Reason:
Metnod:
Exhibit G-Instructions for Exhibit 1 Same Source S. Scheduled A Equipment Faiiure (Explain) 1 - Manual Preparations for Data Entry B - Maintenance or Test 2 Manual Scram.
Sheets for Ucensee Event C Refueling 3 - Automatic Scram.
Repcrt (LER) File (NUREG4161)
D - Raoulatory Restriction 4 - Other (Explain)
E Ope.o or Training & Ucer: sing Examination F Administrative G - Operational Error (Exp;a.n)
H - O her (Explain)
,---.,.-r-
-