Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035D310 + (ML20035D310)
- ML20035D312 + (ML20035D312)
- ML20035D314 + (ML20035D314)
- ML20035D316 + (ML20035D316)
- ML20035D319 + (ML20035D319)
- ML20035D324 + (ML20035D324)
- ML20035D328 + (ML20035D328)
- ML20035D331 + (ML20035D331)
- 05000321/LER-1993-001-04, :on 930316,discovered Loss of Vacuum Resulting in Unplanned Scram & Group 2 Primary Containment Isolation. Caused by Component Failure.Valve 1G11-F019 Will Be Repacked & Actuator Will Be Rebuilt + (ML20035D333)
- ML20035D336 + (ML20035D336)
- ML20035D338 + (ML20035D338)
- ML20035D340 + (ML20035D340)
- ML20035D341 + (ML20035D341)
- ML20035D342 + (ML20035D342)
- ML20035D343 + (ML20035D343)
- ML20035D345 + (ML20035D345)
- IR 05000324/1993010 + (ML20035D346)
- ML20035D347 + (ML20035D347)
- ML20035D349 + (ML20035D349)
- ML20035D351 + (ML20035D351)
- 05000277/LER-1993-006, :on 930314,personnel May Have Been Unable to Respond to Site in Event of Emergency Due to Severe Snowstorm from 930312-13.Roads Impassable Until 930314. Temporary Sleeping Facilities Provided + (ML20035D352)
- ML20035D353 + (ML20035D353)
- ML20035D355 + (ML20035D355)
- ML20035D356 + (ML20035D356)
- ML20035D357 + (ML20035D357)
- ML20035D358 + (ML20035D358)
- ML20035D360 + (ML20035D360)
- ML20035D361 + (ML20035D361)
- ELV-03614, Application for Amends to Licenses NPF-68 & NPF-81,changing Value of Calculated Peak Containment Pressure Re DBA from 45 Psig to 37 Psig + (ML20035D363)
- IR 05000324/1993013 + (ML20035D366)
- ML20035D367 + (ML20035D367)
- ML20035D370 + (ML20035D370)
- ML20035D371 + (ML20035D371)
- ELV-05378, Special Rept:On 930313,mechanical Governor Response to DG 1B Indicated Higher than Actual Speed of Engine.Caused by DG Trip on Low Oil Pressure.On 930324,noticed Water Spraying from Area Near Exhaust Piping.Caused by Crack in Shroud + (ML20035D374)
- LIC-93-0101, Forwards Public Version & Central Files Version of Revised Epips,Including Rev 22 to EPIP-OSC-1,Rev 12 to EPIP-OSC-15 & Rev 13 to EPIP-RR-22.Central Files Version Withheld + (ML20035D377)
- ML20035D378 + (ML20035D378)
- 05000278/LER-1993-003-03, :on 930310,discovered That Reactor Vessel Head Vents Closed & pressure-temp Data Not Obtained.Caused by Operator Not Fully Moving Control Switches to Auto Position. Head Vents Restored to Proper Position + (ML20035D380)
- 05000338/LER-1993-010, :on 930323,SWP Started Unexpectedly During Performance of Reactor Protection & ESF Response Time Testing.Caused by Inadequate Procedures.Procedures Will Be Revised Prior to Next Refueling Outage + (ML20035D386)
- ML20035D387 + (ML20035D387)
- ML20035D389 + (ML20035D389)
- ML20035D390 + (ML20035D390)
- ML20035D391 + (ML20035D391)
- ML20035D392 + (ML20035D392)
- ML20035D395 + (ML20035D395)
- ML20035D397 + (ML20035D397)
- ML20035D398 + (ML20035D398)
- ML20035D399 + (ML20035D399)
- ML20035D400 + (ML20035D400)
- ML20035D403 + (ML20035D403)
- ML20035D405 + (ML20035D405)
- ML20035D406 + (ML20035D406)