Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20024B693 + (ML20024B693)
- ML20024B694 + (ML20024B694)
- ML20024B695 + (ML20024B695)
- 05000389/LER-1983-021-03, /03L-0:on 830602,waste Gas Decay Tank Oxygen Level Found Out of Tech Specs.Possibly Caused by in-leakage.Leaks Corrected + (ML20024B696)
- ML20024B698 + (ML20024B698)
- ML20024B699 + (ML20024B699)
- PNO-II-83-053, on 830705,workers Removed Concrete Block Shielding to Perform Maint on Valve,Leaving Unguarded Access Path to Reactor Containment.Guard Observed Sleeping at Torus Post.Security Evaluated Incidents During 830706 & 07 Insps + (ML20024B701)
- ML20024B702 + (ML20024B702)
- ML20024B703 + (ML20024B703)
- ML20024B705 + (ML20024B705)
- ML20024B706 + (ML20024B706)
- ML20024B708 + (ML20024B708)
- 05000220/LER-1983-011-03, /03L-0:on 830604,electromatic Relief Valve 121 Failed to Open.Caused by Dirty Pilot Due to Oxide Buildup During Extended Outage.Pilot Cleaned & Retested & Normal Shutdown Initiated + (ML20024B710)
- ML20024B711 + (ML20024B711)
- IR 05000309/1983011 + (ML20024B712)
- IR 05000220/1983013 + (ML20024B713)
- ML20024B714 + (ML20024B714)
- 05000309/LER-1983-021, Updated LER 83-021/01T-0,re Control Rod Drop Analysis. Procedure Deficiency Specified in Determined Not Reportable.Procedure Changes Will Remain in Effect + (ML20024B716)
- ML20024B717 + (ML20024B717)
- ML20024B718 + (ML20024B718)
- ML20024B719 + (ML20024B719)
- PNO-I-83-075, on 830705,reactor Tripped from 95% Power When MSIV Closed.Caused by Steam Line Isolation Spike Due to Increase in Condensate Demineralizer Resin.Water Sample Sent to Peach Bottom for Analysis.Rcic Being Reevaluated + (ML20024B720)
- IR 05000461/1983008 + (ML20024B721)
- 05000305/LER-1983-015-03, /03L-0:on 830606,during Valve Timing Test for Td Auxiliary Feedwater Pump,Valve Failed to Electrically Open. Caused by Faulty Torque Switch & Maladjusted Tripper Cam. Valve Operator Rebuilt & Cam Reset + (ML20024B722)
- ML20024B723 + (ML20024B723)
- ML20024B724 + (ML20024B724)
- 05000245/LER-1983-022-03, /03L-0:on 830603,time Delay Relay 590-125D Tripped During Turbine Control Valve Fast Closure Function & Calibr Test.Caused by Low Tolerance.Tolerance Bank Increased & Setpoints Decreased + (ML20024B726)
- TXX-3666, Submits Responses to 811112-14 Requests at ACRS 259th Meeting Re Containment Hydrogen Purge Sys Filters & Control Room Occupancy Vs Containment Leakage Rate + (ML20024B727)
- 05000305/LER-1983-014-03, /03L-0:on 830603,while Performing Monthly RHR Pump & Valve Surveillance Test,Containment Sump B Isolation Valve SI-350B Would Not Cycle Closed.Caused by Mechanical Interlock Sticking in Open Position + (ML20024B729)
- IR 05000412/1983004 + (ML20024B730)
- IR 05000322/1983019 + (ML20024B732)
- ML20024B733 + (ML20024B733)
- ML20024B734 + (ML20024B734)
- ML20024B735 + (ML20024B735)
- ML20024B736 + (ML20024B736)
- 05000261/LER-1983-011-03, /03L-0:on 830605,circuit Breaker for Boron Injection Tank Heater Channel B Tripped.Caused by Component Failure Due to Normal End of Life.Failed Heater Replaced + (ML20024B737)
- ML20024B738 + (ML20024B738)
- ML20024B739 + (ML20024B739)
- 05000309/LER-1983-020, Updated LER 83-020/01T-1:on 830607,HPCI Line Boron Concentration Not Verified.Caused by Inadequate Startup Procedures.Procedures Will Be Revised by 830715 + (ML20024B740)
- ML20024B741 + (ML20024B741)
- ML20024B742 + (ML20024B742)
- ML20024B743 + (ML20024B743)
- ML20024B745 + (ML20024B745)
- ML20024B746 + (ML20024B746)
- PNO-II-83-052, during Insps Per IE Bulletin 83-02,cracks Identified in 33 of 91 Pipe Welds in Recirculation Sys & 14 of 32 Pipe Welds in RHR Sys.Caused by Igscc.Evaluation Ongoing + (ML20024B747)
- ML20024B748 + (ML20024B748)
- ML20024B749 + (ML20024B749)
- ML20024B750 + (ML20024B750)
- ML20024B751 + (ML20024B751)
- ML20024B752 + (ML20024B752)
- ML20024B753 + (ML20024B753)