Submits Proposed Schedule for Completing Tech Spec Review & Issuance.Issuance of Tech Spec Sections 1-5 Expected Prior to Fuel Load Date of 840402
ML20024B705
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/30/1983
From: Schnell D
UNION ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0452, RTR-NUREG-452 ULNRC-642, NUDOCS 8307110257
Download: ML20024B705 (2)


Text

.0 -

o.

UNION ELECTRIC COM PANY lect GRATIOT STREET ST. Louis MISSOURI June 30, 1983

... u.. o o.....

DON ALO P..CHN.Lb P. O..OX 84.

.r. Louis,ui..ou.....

Mr. Harold R.

Denton, Director Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

ULNRC-642 DOCKET NUMBER 50-483 CALLAWAY PLANT, UNIT 1 TECHNICAL SPECIFICATION REVIEW SCHEDULE Union Electric transmitted the Callaway Plant, Unit 1 Technical Specification to NRC for review by ULNRC-564 dated June 29, 1982.

The review of Sections 1.0 through 5.0 of the Technical Specifications has progressed during this past year as a standard review for both Callaway and Wolf Creek.

A meeting was held with NRC reviewers on February 3 and 4, 1983 in which these were reviewed.

As a result of that meeting, it was agreed that SNUPPS, acting for Union Electric and Kansas Gas and Electric, would provide justifications for changes from Westinghouse Standard Technical Specifications (NUREG-0452).

It is anticipated that this submittal will be made by July ll, 1983.

The purpose of this letter is to propose a schedule for completing the Technical Specification review and issuance prior to the Callaway fuel load date of April 2, 1984.

The administrative controls, Section 6.0 is the subject of a separate letter, ULNRC-641 dated June 30, 1983.

We have developed the following schedule for review of Technical Specification Sections 1.0 through 5.0:

7/11/83 -

SNUPPS utilities submit changes to WSTS with justification for the changes.- (We anticipate approximately 6 specification subsections will require an additional submittal.

This second submittal is scheduled by August 15, 1983.)

10/1/83 -

NRC provide comments to SNUPPS utilities on changes provided in 7/11/83 and 8/15/83 submittals.

This is required to integrate surveillance activities into Callaway Hot Functional Test scheduled for 11/15/83.

A meeting with NRC tech spec coordinator may be appropriate at this time.

[ 88 AD 0

3 A-PDR i

C Mr. H2rold R. Denton Juna 30, 1983 Page 2 10/15/83 to 11/15/83 - Series of meetings.between NRC technical reviewers and SNUPPS utilities on specific areas of disagreement.

11/15/83 -

Site visit for NRC reviewers to meet with utility personnel and review open items.

12/1/83 -

Proof and Review copy of Technical Specifications issued by NRC ( 3-4 months prior to OL) ( 4 weeks for review).

1/15/84 -

Utility /NRC meeting following Proof and Review completion.

2/15/84 -

Final Technical Specification ready to send to Union Electric.

4/2/84 -

Callaway Fuel Load - Technical Specifications issued as Appendix A to the Operating License.

Please review this schedule and let us know of any concerns or changes that you might foresee.

Unless told otherwise, we will assume this is a mutually agreeable schedule and trust that NRC will strive to support this schedule based on the callaway fuel load date.

Very truly yours, Donald F.

Schnell DS/mc I

l t