Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20023D484 + (ML20023D484)
- ML20023D486 + (ML20023D486)
- ML20023D488 + (ML20023D488)
- 0CAN048321, Forwards Revised Schedule for Completion of Licensing Procedures Upgrade,Per Regulatory Response & Commitment Control Program.Delay Due to Continuing Support Requirements for Unit 1 Outage.Upgrade to Be Completed by 830527 + (ML20023D489)
- ML20023D490 + (ML20023D490)
- ML20023D492 + (ML20023D492)
- 05000289/LER-1983-012, Forwards LER 83-012/03L-0 + (ML20023D496)
- ML20023D497 + (ML20023D497)
- ML20023D498 + (ML20023D498)
- ML20023D499 + (ML20023D499)
- 05000289/LER-1983-012-03, /03L-0:on 830406,while Performing Functional Testing of Hydraulic Snubbers,Snubber MS-209 Failed to Lock in Tension Direction.Caused by Damaged Piston Seal Ring. Snubber Overhauled & Tested Satisfactorily + (ML20023D501)
- ML20023D502 + (ML20023D502)
- ML20023D503 + (ML20023D503)
- ML20023D504 + (ML20023D504)
- 05000387/LER-1983-063, Forwards LER 83-063/03L-0 + (ML20023D505)
- ML20023D506 + (ML20023D506)
- ML20023D507 + (ML20023D507)
- ML20023D510 + (ML20023D510)
- ML20023D511 + (ML20023D511)
- 05000387/LER-1983-063-03, /03L-0:on 830411,main Steam Line Drain Valve Leakage Exceeded Tech Spec Limit.Cause Not Stated.Seal Ring Replaced,Outboard Valve Lapped & Valves Reassembled + (ML20023D512)
- ML20023D514 + (ML20023D514)
- ML20023D515 + (ML20023D515)
- ML20023D516 + (ML20023D516)
- IR 05000369/1983018 + (ML20023D517)
- ML20023D520 + (ML20023D520)
- LD-83-046, Forwards Amended Table 3-1 of Section II.F.2,App B Reflecting Clarification of Addressing TMI Action Item II.F.2 Re Inadequate Core Cooling Detection Instrumentation, Open Item 4 of CESSAR-F SER + (ML20023D521)
- ML20023D522 + (ML20023D522)
- 2CAN048304, Submits Third Monthly Status Rept Re Regulatory Response & Commitment Control Program.Info Consists of Progress Made in Areas of Verification of Implementation of Commitments Since 790101 & Procedure Rev Tracking + (ML20023D525)
- 05000338/LER-1983-022, Forwards LER 83-022/03L-0 + (ML20023D526)
- ML20023D527 + (ML20023D527)
- ML20023D528 + (ML20023D528)
- ML20023D529 + (ML20023D529)
- 05000327/LER-1983-055, Forwards LER 83-055/03L-0 + (ML20023D530)
- ML20023D531 + (ML20023D531)
- ML20023D532 + (ML20023D532)
- ML20023D533 + (ML20023D533)
- 2CAN048308, Forwards List of Addl Procedures Controlling QA Measures for Threaded Fastener Lubricants to Minimize Fastener Susceptibility to Stress Corrosion Cracking + (ML20023D534)
- 05000327/LER-1983-055-03, /03L-0:on 830415,bank D Movable Control Assembly Declared Inoperable Due to Failure to Move Rods After Receiving Rod Control Sys Urgent Alarm.Caused by Blown Phase C Ref Voltage Fuse FU-10.Fuse Replaced + (ML20023D535)
- ML20023D536 + (ML20023D536)
- ML20023D538 + (ML20023D538)
- ML20023D539 + (ML20023D539)
- ML20023D541 + (ML20023D541)
- B01781, Requests Info Re NRC Contingencies Built Into Current OL Application Review Schedule to Support Fuel Load Date,Per 830412 Meeting + (ML20023D542)
- PNO-II-83-039, two Intergranular Stress Corrosion Cracks Found on Recirculation Line End Cap Weld.Cracks Found During Ultrasonic Insp Per IE Bulletin 83-02.Further Weld Insps Planned + (ML20023D543)
- ML20023D544 + (ML20023D544)
- ML20023D546 + (ML20023D546)
- ML20023D548 + (ML20023D548)
- ML20023D550 + (ML20023D550)
- ML20023D551 + (ML20023D551)
- ML20023D552 + (ML20023D552)
- ML20023D553 + (ML20023D553)