ML20023D548

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-263/83-06 on 830302-0401.No Noncompliance Noted
ML20023D548
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/02/1983
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Larson C
NORTHERN STATES POWER CO.
Shared Package
ML20023D549 List:
References
NUDOCS 8305200591
Download: ML20023D548 (2)


See also: IR 05000263/1983006

Text

.

_ _ _ .

p/n B

. ' .

pa neeuq

y

UNITED STATES

,.,

!

NUCLEAR REGULATORY COMMISSION

..

,

l

3

REGION lil

7ee noosEVELT ROAD

kg...e*/

GLEN ELLYN,ILUNOIS Gem

May 2, 1983

Docket No. 50-263

Northern States Power Company

ATTN: Mr. C. E. Larson

Director of Nuclear

Generation

414 Nicollet Mall

Minneapolis, MN 55401

Gentlemen:

This refers to the routine safety inspection conducted by Mr. C. H. Brown of

this office on March 2 through April 1, 1983, of activities at the Monticello

Nuclear Generating Station authorized by NRC Operating License No. DPR-22 and

to the discussion of our findings with Mr. W. A. Shamla at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thitty days of

the date of this letter.

Such application must be consistent with the re-

quirements of 2.790(b)(1).

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

.

e

4

/E 0/

8305200591 830502

PDR ADOCK 05000263

O

PDR

_.

.

2

Northern States Power Company

May 2, 1983

,

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

0rlsfaelefeud.byV.D.shfer

8

n

W. D. Shafer, Chief

Projects Branch 2

Enclosure:

Inspection Report

No. 50-263/83-06(DPRP)

cc w/ encl:

W. A. Shamla, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Monticello

Resident Inspector, RIII Prairie

Island

John W. Ferman, Ph.D.,

Nuclear Engineer, MPCA

's

f'

I

^) P

RIII

RIII

RIII

RIII

Broy/sv

Jorj

s

s

04/26/83

fl1rlgy

'f/28k3

Shafer[@l

kal

/O

y