ML20023D548
| ML20023D548 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 05/02/1983 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Larson C NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20023D549 | List: |
| References | |
| NUDOCS 8305200591 | |
| Download: ML20023D548 (2) | |
See also: IR 05000263/1983006
Text
.
_ _ _ .
p/n B
. ' .
pa neeuq
y
UNITED STATES
,.,
!
NUCLEAR REGULATORY COMMISSION
..
,
l
3
REGION lil
7ee noosEVELT ROAD
kg...e*/
GLEN ELLYN,ILUNOIS Gem
May 2, 1983
Docket No. 50-263
Northern States Power Company
ATTN: Mr. C. E. Larson
Director of Nuclear
Generation
414 Nicollet Mall
Minneapolis, MN 55401
Gentlemen:
This refers to the routine safety inspection conducted by Mr. C. H. Brown of
this office on March 2 through April 1, 1983, of activities at the Monticello
Nuclear Generating Station authorized by NRC Operating License No. DPR-22 and
to the discussion of our findings with Mr. W. A. Shamla at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thitty days of
the date of this letter.
Such application must be consistent with the re-
quirements of 2.790(b)(1).
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
.
e
4
/E 0/
8305200591 830502
PDR ADOCK 05000263
O
_.
.
2
Northern States Power Company
May 2, 1983
,
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
0rlsfaelefeud.byV.D.shfer
8
n
W. D. Shafer, Chief
Projects Branch 2
Enclosure:
Inspection Report
No. 50-263/83-06(DPRP)
cc w/ encl:
W. A. Shamla, Plant Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Monticello
Resident Inspector, RIII Prairie
Island
John W. Ferman, Ph.D.,
Nuclear Engineer, MPCA
's
f'
I
^) P
RIII
RIII
RIII
RIII
Broy/sv
Jorj
s
s
04/26/83
fl1rlgy
'f/28k3
Shafer[@l
kal
/O
y