Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000352/LER-1990-002-01, :on 900125,identified That Main Control Room Ventilation Sys Outside Design Basis.Caused by Misapplication of Design Basis Assumptions.No Immediate Actions Taken as Existing Procedures Adequate + (ML20011F791)
- ML20011F794 + (ML20011F794)
- ML20011F796 + (ML20011F796)
- ML20011F802 + (ML20011F802)
- ML20011F811 + (ML20011F811)
- ML20011F818 + (ML20011F818)
- ML20011F819 + (ML20011F819)
- ML20011F821 + (ML20011F821)
- ML20011F824 + (ML20011F824)
- 05000373/LER-1990-003-01, :on 900201,RCIC Received Div 2 Isolation on RCIC High Steam Line Flow.Caused by Spurious High Steam Flow Signal Generated When Steam/Water Mixture Admitted to RCIC Steam Line.Isolation Logic Reset + (ML20011F825)
- ML20011F828 + (ML20011F828)
- ML20012A001 + (ML20012A001)
- 05000277/LER-1990-001-02, :on 900124,discovered That Daily Instrument Check of Main Stack Flow Rate Monitor Not Performed.Caused by Incomplete Procedure.Operating Shift Surveillance Log Revised to Include Daily Instrument Check + (ML20012A002)
- ML20012A010 + (ML20012A010)
- ML20012A011 + (ML20012A011)
- 05000278/LER-1990-002-02, :on 900128,reactor Manually Scrammed Due to Leak of Electrohydraulic Control Sys Fluid.Caused by Lock Nut on Interlock Dump Valve Setting Adjustment Bolt Becoming Unsecured Due to Sys Vibration.Leak Stopped + (ML20012A017)
- ML20012A018 + (ML20012A018)
- ML20012A020 + (ML20012A020)
- ML20012A021 + (ML20012A021)
- ML20012A023 + (ML20012A023)
- ML20012A024 + (ML20012A024)
- AECM-90-0042, Summary of Operating Experience 1989 + (ML20012A030)
- ML20012A031 + (ML20012A031)
- ML20012A032 + (ML20012A032)
- ML20012A036 + (ML20012A036)
- ML20012A037 + (ML20012A037)
- ML20012A038 + (ML20012A038)
- ML20012A041 + (ML20012A041)
- ML20012A042 + (ML20012A042)
- BVY-90-018, Annual Operating Rept for 1989 + (ML20012A046)
- ML20012A047 + (ML20012A047)
- ML20012A058 + (ML20012A058)
- ML20012A061 + (ML20012A061)
- ML20012A065 + (ML20012A065)
- ML20012A067 + (ML20012A067)
- ML20012A069 + (ML20012A069)
- ML20012A070 + (ML20012A070)
- ML20012A071 + (ML20012A071)
- ML20012A072 + (ML20012A072)
- ML20012A073 + (ML20012A073)
- ML20012A074 + (ML20012A074)
- ML20012A075 + (ML20012A075)
- ML20012A076 + (ML20012A076)
- ML20012A077 + (ML20012A077)
- BECO-90-030, Radioactive Effluent & Waste Disposal Rept Including Meteorological Data,Jul-Dec 1989 + (ML20012A079)
- ML20012A080 + (ML20012A080)
- LIC-90-0177, Forwards Response to Generic Ltr 90-01,consisting of Completed NRC Regulatory Impact Survey Questionnaire Sheet Re NRC Team Insps,Insps/Audits,Impo Evaluations/Visits, Insurers (Nelia),Osha & DOT + (ML20012A081)
- ML20012A082 + (ML20012A082)
- ML20012A083 + (ML20012A083)
- 05000278/LER-1990-001-03, :on 900108,HPCI Sys Declared Inoperable During Surveillance Testing When Start Time Exceeded 25 S.Caused by Inadequate Calibr Procedure Which Allowed Setting of 18 S. Ramp Generator & Signal Converter Replaced + (ML20012A084)
- ML20012A085 + (ML20012A085)