ML20012A042
| ML20012A042 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 12/31/1989 |
| From: | Johnson B CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9003080179 | |
| Download: ML20012A042 (4) | |
Text
..
1 6.
WA- -
essorei Omees:' 1946 West PerneH Mead.Jeokoon, MI 4920* * (617) 796 0660 Tchruary 27, 1990 i
Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -
1989 ANNUAL OPERATING REPORT - OCCUPATIONAL EXPOSURE The annual report covering occupational exposure during 1989 as required by Big Rock Point Technical Specification 6.9.1.4 and 0.9.1.5 is attached.
Cb w
Brian D Johnson Staff Licensing Engineer
.CC Administrator, Region III, USNRC
-NRC Resident Inspector - Big Rock Point Attachment
/'
(\\
OCO290-0263-KLO4 l
9003090179 091231
. PDR ADOCK 0500015b h Rv PNV
ps 3
s tr
,+
t, ' t
.a.
p.
4
(
ATTACHMENT Consumers Power Company Big Rock Point Plant i.
Docket 50-155 g
i t
y.-..
i
.1989 ANNUAL OPERATING REPORT OCCUPAT70"Al EXDOSURE
-February.27, 1990 h'
- )
i 3
2 Pages OC0290-0263-h104 4
g t
P;ge 1 of 2-1000 AN:"AL EXPOSURE REPORT-(Reg Guide 1.16)
REPORTING i1 UMBER OF PERSONNEL AND MAN-REM BY WORK CROUP AND JOB FUNCTION Number of Personnc1 Total Person.Ren with Dose > 100 mrem Job Function BRP CPCo Non BRP CPCo Non and Staff Non.BRP CPCo Staff Non BRP CPCo Work Group (Station)
(Utility)
(Other)
(Station)
(Utility)
(Other)
Reactor Ops & Surv Maintenance 0
0 0
0.192 0
0.008 Operations 29 0
0 21.020 0
0.018 Health Physics 12 0
5 6.716 0
2.042 Supervisory Person.
5 0
1 1.349 0.361 0.477
(
Engineering 1
0 0
0.509 0
0
!&C Personnel 0
0 0
0.285 0
0 QA/QC Personnel 0
0 0
0 0.148 0
NDT Personnel 0
0 0
0 0
0 Total = 33,125 Routine Maintenance Maintenance 23 6
0 8.519 2.928 0.005 Operations 0
0 0
0.000 0
0
. Health Physics 3
0 1
0.962 0.004 0.327 Supervisory Person.
0 0
0 0.196 0.183 0
Engineering
-0 0
0 0.024 0
0 1&C Personnel 4
0 0
0.944 0
0 QA/QC Personnel-0 0
0 0
0.204 0.019 NOT Personne) 0 0
0 0
0.012 0
Total = 14.333 Inservice Inspection Meintenance 0
13 15 0.035 6.931 10.514 l.
Operations 0
0 0
0.005 0
0 l'
Health Physics 3
0 2
0.480 0.00 1.217 Supervisory Person.
0 1
0 0.021 0.605 0.091 Engineerii.g 2
0 0
0.049 0
0 I&C Personnel 0
0 0
0 0
0 QA/QC Personnel 0
0 0
0 0.069 0.003 l/
NOT Personnel.
0 6
5 0
2.049 2.139-l l
Total = 25.010 l~
MIO290-0030A-BD01
- n
k
]
.. -e P ge 2 cf 2
~~ Job function-BRP CPCo-Non 8RP CPCo Non and Staff Non.BRP CPCo Staff Non BRP CPCo Work Group (Station)
(Utility)
(Other)
(Station)
(Utility)
(Other)
Special Maintenance Maintenance 18' 43 20 19.327 26.388 5.167 Operations 2
0 0
0.832 0
0 Health Physics 13 0
8 7.880 0
3.903 Supervisory Person.
2 6
0 0.723 2.096 0.071 H
Engineering 3
0 0
0.556 0
0 LI&C Personnel.
5-0 0
3.020 0
0
-DA/QC Personnel 0
4 2
0 0.773 0.598
( R Pnsonnel 0
3 0
0 0.901 0.055 ~
Total = 72.289 Waste P.rocessing Naintenece 7
0 1
1.744 0.261 1.170 Operations 0
0 0
0.238 0
0
' Health Physics 5
0 0
1.568 0
0.023 Supervisory Person.
0 0
0 0.046 0.004 0
Engineering 0
0 0
0 0
0 1
1&C Personnel 0
0 0
0 0
0 QA/QC Personnel 0
0 0
0.004 0.116 0
NOT Personnel 0
0 0
0 0
0 Total = 5.174 Refueling Maintenace 5
0 0
1.196 0
0
- Operations 16 0
0 3.371 0
0 Health Physics 2
0 0
0.604 0
0 Supervisory Person.
1 0
0 0.204 0
0.029 Engineering
'1 0
0 0.322 0
0 I&C Personnel-0 0
0-0 0
0 QA/QC Personnel 0
1 0
0 0.177 0.009 NOT Personnel 0
0 0
0 0.045 0
Total = 5.957 Totals Maintenace 53 62 36 31.015 36.509 16.864 Operations 47' 0
0 25.475 0
0.018 Health Physics 38 0
16 18.210 0.004 7.511 Supervisory Person.
8 7
1 2.537 3.249 0.668 l
Engineering 7
0 0
2.260 0
0 I&C Personnel 9
0 0
4.249 0
0 QA/QCPersonnel 0
5 2
0.004 1.488 0.629 R
NDT Personnel 0
9 5
0 3.007 2.194 1
Grand Totals 162 83 60 83.748 44.256 27.884 l:
MI0290-0030A-BDO1
-.