Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000324/LER-1989-009, :on 890617,manual Reactor Scram Initiated Per NRC Bulletin 88-007 Due to Loss of Recirculation Pumps, Causing Loss of Offsite Power & Containment Isolation. Caused by Personnel Error.Hpci Sys Secured + (ML20011D841)
- ML20011D842 + (ML20011D842)
- ML20011D846 + (ML20011D846)
- ML20011D847 + (ML20011D847)
- ML20011D848 + (ML20011D848)
- ML20011D849 + (ML20011D849)
- ML20011D850 + (ML20011D850)
- ML20011D854 + (ML20011D854)
- ML20011D856 + (ML20011D856)
- ML20011D857 + (ML20011D857)
- ML20011D860 + (ML20011D860)
- 3F1289-13, Provides Addl Info Re Scope of Diesel Generator post-maint Testing & Need for GDC Exemption to Remove Missile Shields to Complete pre-outage Work.Schedule for Completion of Mods to Emergency Diesel Generator B Extended to Refuel 8 + (ML20011D861)
- ML20011D862 + (ML20011D862)
- ELV-01156, Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing Check Valves or Valves of Similar Design. No Matls Subj to Bulletin Found + (ML20011D864)
- ML20011D865 + (ML20011D865)
- ML20011D866 + (ML20011D866)
- ELV-01184, Forwards 10CFR50.46 Annual ECCS Model Changes Rept.Rept Covers Effect of ECCS Evaluation Model Mods on Peak Cladding Temp Results Reported in Chapter 15,Section 6 of FSAR + (ML20011D867)
- ML20011D868 + (ML20011D868)
- ML20011D869 + (ML20011D869)
- ML20011D871 + (ML20011D871)
- ML20011D872 + (ML20011D872)
- IR 05000073/1989001 + (ML20011D873)
- ELV-01168, Responds to Violations Noted in Insp Rept 50-425/89-37. Corrective Actions:Administrative Procedure 00208-C Revised to Incorporate Time Limits (90 Days) Associated W/Evaluation of Measuring & Test Equipment Found Out of Calibr + (ML20011D874)
- LIC-89-1199, Forwards Corrected Monthly Operating Repts for Sept,Oct & Nov 1989 for Fort Calhoun Station.Duration of Scheduled Refueling Outage on Repts Revised to Reflect Current Plans + (ML20011D877)
- ML20011D878 + (ML20011D878)
- ML20011D879 + (ML20011D879)
- 05000424/LER-1989-020-01, :on 891211,power Removed from Radiation Monitor Before Lifting Leads to ESF Actuation Circuits.Caused by Cognitive Personnel Error & Failure to Follow Procedure. Technician Disciplined.Esf Provisions Planned + (ML20011D881)
- ML20011D882 + (ML20011D882)
- ML20011D883 + (ML20011D883)
- ML20011D890 + (ML20011D890)
- ML20011D894 + (ML20011D894)
- ML20011D895 + (ML20011D895)
- ML20011D897 + (ML20011D897)
- ML20011D898 + (ML20011D898)
- ML20011D900 + (ML20011D900)
- ML20011D902 + (ML20011D902)
- ML20011D903 + (ML20011D903)
- 0CAN128911, Advises That Response to Violation Noted in Insp Repts 50-313/89-32 & 50-368/89-32 Will Be Provided by 891218 W/Explanation Re Administrative Oversight of Submittal + (ML20011D905)
- ML20011D906 + (ML20011D906)
- ML20011D908 + (ML20011D908)
- LD-89-118, Responds to Violations Noted in Insp Rept 70-1100/89-80. Corrective Actions:Personnel Training List Now Reviewed to Assure That Retraining Requirement Satisfied for Individuals Requiring Unescorted Access to Pellet Shop + (ML20011D909)
- IR 05000445/1989084 + (ML20011D910)
- ML20011D911 + (ML20011D911)
- ML20011D912 + (ML20011D912)
- ML20011D913 + (ML20011D913)
- ML20011D914 + (ML20011D914)
- ML20011D915 + (ML20011D915)
- ML20011D916 + (ML20011D916)
- ML20011D917 + (ML20011D917)
- ML20011D918 + (ML20011D918)
- PY-CEI-NRR-1104, Application for Amend to License NPF-58,revising Tech Specs to Implement Generic Ltr 88-16, Removal of Cycle-Specific Parameter Limits from Tech Specs. Parameter Limits Will Be Moved to Core Operating Limits Rept + (ML20011D919)