Revised Monthly Operating Rept for Nov 1989 for Fort Calhoun Station
ML20011D883
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/30/1989
From: Stice D
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20011D878 List:
References
NUDOCS 9001020223
Download: ML20011D883 (1)


Text

.

lr OPERATING DATA REPORT c

00CXET NO.

50.285 UNIT Fort Calhoun Station DATE December 22, 1989 COMPLETED BY 0.-L. St1ce TELEPHONE (4021636-2474 OPERATING STATUS 1

1.

Unit Name:

Fort Calhoun Station Notes 2.

Reporting Perloa:

NovemDer 1989 3.

Licensed Thermal Power (MWt):

.500 4.

Nameplate Rating-(Gross MWe):

502 5.

Design Electrical Rating (Net MWe): 478 6.

Maximum Dependable Capacity-(Gross MWe):

502 i

7.

Maximum Dependable Capacity (Net MWe):

478 j

8.

If changes. occur in Capacity Ratings (Item Numcers 3 through 7) Since Last Report, Give Reasons:

N/A 9.

Power Level to Which Restricted, If Any (Net MWe): N/A-

10. Reasons for Restrictions,'If Any: N/A j

1j This Month

'Yr-to-Date Cumulative 1

11. Hours in Reporting Period 720.0 8.016.0 141.866.0 l
12. Number of Hours Reactor was Critical 720.0 7.072.5 110,422.I-
13. Reactor Reserve Shutdown Hours 0.0 0.0

. 309.5

~

14. Hours Generator On-Line 720.0 6.846.1 109,26:.4

-15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

16. GrossThermalEnergyGenerated(MWH) 1,075.166.8 9,615.198.4 142.504,:,92.3
17. Gross Electrical Energy Generated (MWH) 351.410.0 3,;.02.436.0 46,846.664.2
18. Net Electrical Energy Generated (MWH) 335.147.4 2.949.407.6 44,720.912.4
19. Unit Service Factor 100.0 85.4 77.0'
20. Unit Availability Factor
.00.0 85.4 77.0
21. Unit Capacity Factor (Using MDC Net) 97.4-77.0 68.5
22. Unit Capacity Factor (Using DER Net) 97.4 77.0 66.8
23. Unit. Forced Outage Rate 0.0 4.0-3.0,

-24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Eacn):

Refuelino Outace estimated to becin on Februarv-I6,1990, with-a planned j

duration of 86 days.

I 25.

If Shut Down at Eno or Report Perloo, Estimateo Date of Startup: N/A

26. Units In Test Status (Prior to Commercial Operation):

Forcast AchieYeQ I

INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION bbbkb>b$$85 Revision 1 PD R

PDC December 22,-1989 1

.