Revised Monthly Operating Rept for Sept 1989 for Fort Calhoun Station
ML20011D879
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/30/1989
From: Stice D
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20011D878 List:
References
NUDOCS 9001020219
Download: ML20011D879 (1)


Text

m

, OPERATING DATA REPORT f

DOCKET NO. 50-285 UNIT Fort Calhoun Station DATE December 22. 1989 COMPLETED BY D. L. Stice TELEPHONE (402)636-2474 OPERATING STATUS ,

1. Unit Name Fort Calhoun Station Notes l
2. Reporting Period: Septemoer 1989
3. LicensedThermalPowerTMvet): 1500 4 NameplateRating(GrossMWe): 502
5. Design Electrical Rating (Net MWe): 478
6. Maximum Dependable Capacity (Gross MWe): 502
7. 478
8. Maximum Jependable If changes occur Capacity in Capacity rtatings (Net MWe)(: Item Numbers 3 through 7)-Since l

Give Reasons:

N/A l

9. PowarLeveltoWhichRestricted,IfAny(NetMWe): N/A
10. Reasons for Restrictions, If Any:_N/A This Month Yr-to-Date Cumulative

, 11. Hours in Reporting Period . 720.0 6,551.0 140,401.0 /

l 12. Number of Hours Reactor was Critical 618.7 5,607.5 108,957.3 l 13. Reactor Reserve Shutdown Hours 0.0 0.0" .,309.5' /

~

) 14. Hours Generator On-Line 609.8 5,38L., 106796.4 /

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 748,608.2 7,483,538.3 140,377,532.2 1 17.- Gross Electrical Energy Generated (MWH) 236,692.0 2.410,866.0 46,154,994.2 /
18. Net Electrical Energy Generated (MWH) 222,992.0 2,290,934.9 44,062,439.7 /
19. Unit Service Factor 84.7 82., 76.8 /
20. Unit Availability Fector 84.7 82. . 76.8 /
21. UnitCapacityFactor(UsingMDCNet) 64.8 73.2 68.2 /
22. Unit Capacity Factor (Using DER Net) 64.8 73.2 66.6 /
23. Unit Forced Outage Rate 15.3 5.0 3.0 /
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, ano Duration of Each):

Refuelino Outace estimated to beoin on February 16, 1990, with a planned duration of 86 days. /

25. If Shut Down at End of Report Period. Estimated Date of Startup: N/A
26. UnitsInTestStatus(PriortoCommercialOperation): Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A C0lHERCIAL OPERATION ,_