m OPERATING DATA REPORT f
DOCKET NO.
50-285 UNIT Fort Calhoun Station DATE December 22. 1989 COMPLETED BY D. L. Stice TELEPHONE (402)636-2474 OPERATING STATUS 1.
Unit Name Fort Calhoun Station Notes l
2.
Reporting Period:
Septemoer 1989 3.
LicensedThermalPowerTMvet):
1500 4
NameplateRating(GrossMWe):
502 5.
Design Electrical Rating (Net MWe): 478 6.
Maximum Dependable Capacity (Gross MWe):
502 7.
Maximum Jependable Capacity (Net MWe)(: Item Numbers 3 through 7)-Since 478 If changes occur in Capacity rtatings 8.
l Give Reasons:
N/A l
9.
PowarLeveltoWhichRestricted,IfAny(NetMWe): N/A
- 10. Reasons for Restrictions, If Any:_N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720.0 6,551.0 140,401.0
/
l
- 12. Number of Hours Reactor was Critical 618.7 5,607.5 108,957.3 l
- 13. Reactor Reserve Shutdown Hours 0.0 0.0"
.,309.5' /
~
)
- 14. Hours Generator On-Line 609.8 5,38L.,
106796.4
/
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 748,608.2 7,483,538.3 140,377,532.2 1 17.-
Gross Electrical Energy Generated (MWH) 236,692.0 2.410,866.0 46,154,994.2
/
- 18. Net Electrical Energy Generated (MWH) 222,992.0 2,290,934.9 44,062,439.7
/
- 19. Unit Service Factor 84.7 82.,
76.8
/
- 20. Unit Availability Fector 84.7
- 82..
76.8
/
- 21. UnitCapacityFactor(UsingMDCNet) 64.8 73.2 68.2
/
- 22. Unit Capacity Factor (Using DER Net) 64.8 73.2 66.6
/
- 23. Unit Forced Outage Rate 15.3 5.0 3.0
/
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, ano Duration of Each):
Refuelino Outace estimated to beoin on February 16, 1990, with a planned duration of 86 days.
/
25.
If Shut Down at End of Report Period. Estimated Date of Startup: N/A
- 26. UnitsInTestStatus(PriortoCommercialOperation):
Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A C0lHERCIAL OPERATION 9001a20229 ep122.
Revision 1
[DR ADoCK 05000$85 December 22, 1989 PDC
_