Revised Monthly Operating Rept for Sept 1989 for Fort Calhoun Station
ML20011D879
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/30/1989
From: Stice D
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20011D878 List:
References
NUDOCS 9001020219
Download: ML20011D879 (1)


Text

m OPERATING DATA REPORT f

DOCKET NO.

50-285 UNIT Fort Calhoun Station DATE December 22. 1989 COMPLETED BY D. L. Stice TELEPHONE (402)636-2474 OPERATING STATUS 1.

Unit Name Fort Calhoun Station Notes l

2.

Reporting Period:

Septemoer 1989 3.

LicensedThermalPowerTMvet):

1500 4

NameplateRating(GrossMWe):

502 5.

Design Electrical Rating (Net MWe): 478 6.

Maximum Dependable Capacity (Gross MWe):

502 7.

Maximum Jependable Capacity (Net MWe)(: Item Numbers 3 through 7)-Since 478 If changes occur in Capacity rtatings 8.

l Give Reasons:

N/A l

9.

PowarLeveltoWhichRestricted,IfAny(NetMWe): N/A

10. Reasons for Restrictions, If Any:_N/A This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 720.0 6,551.0 140,401.0

/

l

12. Number of Hours Reactor was Critical 618.7 5,607.5 108,957.3 l
13. Reactor Reserve Shutdown Hours 0.0 0.0"

.,309.5' /

~

)

14. Hours Generator On-Line 609.8 5,38L.,

106796.4

/

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 748,608.2 7,483,538.3 140,377,532.2 1 17.-

Gross Electrical Energy Generated (MWH) 236,692.0 2.410,866.0 46,154,994.2

/

18. Net Electrical Energy Generated (MWH) 222,992.0 2,290,934.9 44,062,439.7

/

19. Unit Service Factor 84.7 82.,

76.8

/

20. Unit Availability Fector 84.7
82..

76.8

/

21. UnitCapacityFactor(UsingMDCNet) 64.8 73.2 68.2

/

22. Unit Capacity Factor (Using DER Net) 64.8 73.2 66.6

/

23. Unit Forced Outage Rate 15.3 5.0 3.0

/

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, ano Duration of Each):

Refuelino Outace estimated to beoin on February 16, 1990, with a planned duration of 86 days.

/

25.

If Shut Down at End of Report Period. Estimated Date of Startup: N/A

26. UnitsInTestStatus(PriortoCommercialOperation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A C0lHERCIAL OPERATION 9001a20229 ep122.

Revision 1

[DR ADoCK 05000$85 December 22, 1989 PDC