Monthly Operating Repts for Nov 1989 for McGuire Nuclear Station
ML20011D849
Person / Time
Site: McGuire, Mcguire  
Issue date: 11/30/1989
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20011D196 List:
References
NUDOCS 9001020160
Download: ML20011D849 (10)


Text

gew--

F7 s

~

1.-

l' q,

DPERATING DATA REPDRT DOCKET NO-50-369 DATE Decenter 15. 1989 OPERATIN6 STATUS COMPLETED BY R.A. Williaes-I w

TELEPHONE 704-373-5987

't, Unit Name: McGuire 1 i

2.' Reporting Period: November 1, 1929-Novesber 30,1989

3. Licensed Thereal Power (MWt):

3411 4'. Naseplate Rating (Bross MWe):

13054 Notes. INaseplate Rating-5.DesignElectricalRating.(NetMWe):

!!80-(6 toss MWe) calculated as 6 Marisue Dependable Capacity (Bross MWe):

!!71 1450.000 MVA x 90 power.

-. 7. Maxleue Dependable Capacity (Net MWel

!!29 factor per Page lii,

8.11f Changes Occur in Capacity Ratings (Itees Nusber 3 Through 7) Since Last NURE6-0020.

Report. Give Reasons:-

t

9. Power Level To Which Restricted, if Any (Net MWe):

. 10. Reason For Restrictions, if any:-

This Month Yr.-to-Date Cuaulative

11. Hours in Reporting Perled 720.0 8016.0 69384.0.
12. Nueber Of Hours Reactor Was Critical 720.0 6466.8 49381.7-
13. Reactor Reserve Shutdown Hours

--0--

--0--

--0--

-14. Hours Generator On-Line-720.0 6445.0 48824.4

15. Unit Reserve Shutdown Hours

--0--

--0--

--0--

'16. Gross Thereal Energy Generated (MWH) 2456058 21246705 146398531-17.,6 toss Electrical Energy Generated (MWH) 847543-7247723-50480344

18. Net Electrical Energy Benerated (MWH) 815913 6952269 48171357
19. Unit Service Factor 100.0 80.4 70.4 20.UnitAvailabilityFactor 100.0 80.4 70.4

'21. Unit Capacity Factor (using MDC het)

'100.4 76.8 59.8 -

22. Unit Capacity Factor (Using DER Net) 96.0 73.5 58.B
23. Unit Forced Outage Rate 0.0 19.6 12.6

~ 24. Shutdown Scheduled Over Hext 6 Months (Type, Date, and Duration of Each):

Dahlinn March 2A, 1400 - 19 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Sta-tup:

s

26. Units In Test Status (Prior to Coseercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION 9001020160 891215 DR ADOCK 05000369 PDR

Ta -

q; Q

~-

~

1

.i, ;

fl; y, l, M;: :Q

, 4,

~

s,

,u-p ;q r

. :,./

_g

,i t

9 w

. = -

s

, :vo 3

8.

3, 7

p i

n l,.

i '

0PERATINGDATAREPORT.

i g -

a in f.

-DOCKET NO.

50-369

- +:

P c

UNIT.

McGuire 1 DATE December 15; 1999 L

b' v'

i COMPLETED BY ' R.A. Wilitans-f' LTELEPHONE :704-373-5987

j
p s

" MONTH I : November.1999

' i 6 ta h?i

?

e

,e l61 AVERABEDAILYPOWERLEVELL

PAL

. AVERAGE DAILY POWER LEVEL

-(MWe-Net).

(MWe-Net)-

1:

'I'l26 17 1134'

.f 2

1123-

-IB

'1135 v

h 3-1123

.- 19 1135 i

~

4=

1124 20 1136 T

5-

-1129 '

21.

1136 4

(61

~1130 22

-1135' 5.7 1130

'23:

1133'

.f 1B

!!31 24

!!35

?9I 1133

' 25 1130' s

[10:,

1131' 26' 1141 e 11 -

1129-

- 27

~1140 i

12 -

! 1133 28 1141

. '13 :

~ 1132 29 1130

.t

'14 1134 30 1140 p- :s e

{- 15 I135 16 1136 1

1 l

t e

e

~,.,,-

w..;,..,.,

w,

, - -, =k : -..:

.f}

'(p

?q,

4 ?;

f3,9 7;3, 'yy

'.. w nn -

z.,

,m,-w*

n;eg g7m

,,,y }v.:3:y., my;Lf': ;

,;Q }r'}l<"ciQyuy p

g.,.,

,...w-7

,~

~,

7

  • ~

^l-

.? 'jJ{ $.. y ' fl

.o n m

~, no, la ~

c,. l; :r

.,Y,O r e p. :. e ;-

n:4

(

~

P UNITLSHUTDOWNS' AND; POWER { REDUCTIONS 3 e:_ _.

{ DOCKET 6 NO V;.?-: 50-3697 jilQ&fN Y l (c.<

. *y2

~,.

..,, ' _ ^

k

_T ~

__n.

,.p (UNIT [NAMElMQGUI_I3E211_

mi 3 -

~

~

~ ~

y..

x w

w::' D. ATE 9-12/15/99 J - % "-

f

?..

REPORT.?. MONTH ),.

~- ' No vember,1989,.

_-.. C O M P. L E T. E D i B Y 1 S. 1 W.< M O S.E W '.

H:,-

.2

~

v----------

' TELEP.HONEJM 704)-373-5762 !?

w-

-~

f1')

('2).(3)_

(4)~

^(5).,

, J@ g

~

~

R' MET--

W

^ ~

r E

HOD

V-4 T-A' OF' IICENSE.-

~

~

O N'

'Y S

SHUT EVENT SYS-

CAUSEfAND! CORRECTIVE.f

[.

O'

P

~ DURATION 0:

DOWN JREPORT' T E M --

COMPONENT-4 ACTION TO-

'DATE.

'E HOURS N

R/X NO. _

CODE

.' CODE

PREVENT' RECURRENCE -
[.

N'O

. SHUTDOWNS OR RED'UCTIONS

~

9/,,

~

w 7

q

.; c; n.

. g s-$7

.i 1

. n

-] E t

J m

c T

6 -

e.=-

6

'h (1)

(2)

' (' 3 ).

i 4')1

'~

F Forced Reason:

Method:'

-Exhibi t G S--V Instruc t ions S Scheduled A-Equipment Failure (Exp1'ain)

. 'l--Ma nu a l ! -

fo r: Preparation'ofsData,-

B-Maintenance or-test' 2 - M a n u a l S c r a m ;.

' Entry SheetsiFo6Licenset

~

C-Refueling 3-Automatic Scram Event-Reporte(LERIf D-RegulatorycRestriction 4-Other-(Explain)

-Filed (NUREG-0161)J

,y E-OperatorDTraining A License Examination

(5)-
  • v+

F-Administrative LExhibitLI' SameJSource:

G-Operator _. Error ~(Explain):

H-OtherC(Explain)s m

'q' h

w de a

g_,_...ms_..i.

.'M

py t'

~'

g.

n-1 i:

j?

DOCKET NO:

50-369

~

li.

UNIT: McGuire~1 lw DATE:

12/15/89 NARRATIVE'

SUMMARY

Month: November 1989-McGuire Unit.1 began the month of November operating at 100% full power. The

-unit operated the entire month of November with no power reductions or

\\

outages.

N l-l

. Prepared by: S. W. Moser

-Telephone: 704-373-5762 l

l>

^

i-i I

s i,

y

. 7 f

. MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 1 2.

Scheduled next refueling shutdown: March 1990-h 3.

Scheduled-restart following refueling: June 1990 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, what will these be?

'If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or:new operating procedures).

7.1 Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel. pool:

369 8.

Present licensed fuel pool capacity:

1463 Size of-requested or planned increase:

L l

9.

Projected date of last refueling which can be accommodated by present L

licensed capacity: October, 2004 li l.

l-DUKE POWER COMPANY DATE:

December 15, 1989 Name of

Contact:

J. A. Reavis Phone:

704-373-7567 l

H

74.

y

~}-

g ] $, +

Pse 3;;

  • ~

' 'L i% y c

m c-4 4

i i

DPERATING DATA REPORT g,

F

(

1i,

i.,

DDCKET NO-50-370

+

-DATEDecesber 15.'1799=

$~

OPERATIN6 STATUS

-CDMPLETEDBi R.A. Nillines-TELEPHONE-704-373-5987 11.UnitNase:McGuire2=

(2. Reporting Periods:Novesber 1,1989-November 30,:1999L m

h.

3. Licensed Thereal Power (Mt)
1, 3411.

J 4. Naseplate Rating (Gross Me):

1305*

Notes # Nameplate Rating '

s'

5J Design Electrical. Rating (Net Me):.

l 1180. -

.(6 toss Me) calculated as

6..Maxleue Dependable Capacity (6 toss Me) :

1171 1450.000 M A xJ.90 power

< 7. Maxisue Dependable Capacity (Net Me):1

. !!29 -

factor per Page 111,-

g lBi-ifChangesOccurinCapacityRatings-(JteesNueber3Through7)SinceLast.

'NUREB-0020.

R:;orti6ive Reasons::

p J 9. Power Level T.o Nhichl Restricted, If Any (Net Me):

110.ReasonForRestrictionsiIfany

~

-This' Month Yr.-to-Date Cuaulative l11.HoursinReportingPeriod 720.0 18016.0 50424.0; L12.' Nueter Of Hours Reactor lias Critical :

-720.0 6199.4-37958.B R 13. Reactor Reserve Shutdown Hours

--0-- -'

--0---

,14. Hours 6eneratorOn-Line-720.0

.6125.2 37184.0

--15;UnitReserveShutdownHours

--0--

--0--

--0--

l16..GrossTherea.1 Energy,6enerated(WH):

2400111 19478592 120791696

'17. Gross Electrical Energy Generated (MH)'

862597--

z6844232-

.42298114 y

18.jNetElectricalEnergyBenerated(MH) 831656

,146 40550261'

-19sUnitServiceFatter..

100.0 76.4 73.7-L20.LUnitAvailabilityFactorl 100.0 76.4 73.7

~

21. Unit Capacity Factor--(Using MDC Neth 102.3 72.5 69.8 122.UnitCapacityFactorl(UsingDERhet) 97.9 69.5 68.2 23.Lunit Forced Dutige Rate', ~

0.0 1.0 10.4 4 724.' Shut 60sn Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

i None 1.

g-j

-25. If Shut-Down Pt End Of Report Period. Estiaated Date of Startup:

l

{

7 6.' Units In Test Status (Prior to Cossercial Operation):

Forecast Achieved 2

INITIAL CRITICALITY INITIAL ELECTRIC!TY COMERCIAL OPERATION 4

(

)

N t

-.w iX ;psd"*'A:. >s

~...

v in

. -em r

~_

gl@M s

N --

67 m

y,1 p-s g;;:w > )g g

.. e,

s

, u,. m e.

+

w 65 J n; (9

7 i

4 8 #

N

'0PERATIN6 DATA REPORT-

,y m

Ib..m.

$q, ;7 i,l. +

t l ' * *; y.l

DOCKET NO-50-370;

[]'

UNIT McGuire 2

[

' DATE December 15. 1989 FM..

..a COMPLETED BY R.A. Williaes

~

TELEPHONE-704-373-59871 i

f a

4 l'

,E MONTH--

Novesber,19893 2

, i-1;

. B1

. AVERAGE DAILY POWER LEVEL' x --

M1

' AVERA6E DA!LY POWEE LEVEL.

- (MWe-Net) -

(MWe-Net)-

1..

,1159' 17-

'1158-4 3

n 2;"

1159' 18 E1128 3:.

. 1156-

- 19 1157

~!

\\

13 M

u 4

't154 20 1158' L5:

1158 21 -

1159 a

22 ~

1151-

-6' 1159-

' =

4

.-4

. 1159' 23 1155

f. 7 g,.:u :: '

B~

'1159 24 1150 s

[,g

.9I "

'1159 25 1150 C

.;s 1150 26 1159

= 10.

1124 27

'1158

[

4

+

p 5

4

< !2 ::

1146 28 1158

.;.y T

13 ':

'1157 29 1158

',o 1

c,

1157' 30 1159

% J 14..-:

r 4ft

-15,

'!!58

16'

' !!58 -

i

.g;;

4I j

4

~

, 1 9 1

UNIT SHUTDOWNS AND POWER REDUCTIONS ~

DOCKET nog. 50-370

UN I T " N AME _MCGu lRE _2_ ___,___...

'DATE. 12/15/89 REPORT MONTH ____Novgmbgr_1989_

COMPLETED BY~ iS._W._MOSER__.___

TELEPHONE' _12041:323:5262___

(1)

(2)

(3)

(4).

(5)

R MET-E HOD T-A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE-O P

DURATION O

DOWN REPORT-TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTIONS (3)

(4)

(1)

(2)

Exhibit G - Instructions' Method:

F Forced Reason:

S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation ~of Data 2-Manual Scram Entry Sheets For License B-Maintenance or-test 3-Automatic Scran Event Report (LER)

C-Refueling 4-Other (Explain)

File.(NUREG-0161)

D-Regulatory Restriction' E-Operator Training & License Examination (5)

F-Administrative Exhibit Same Source G-Operator Error (Explain)

H-Other (Explain)

77 a ;,

>s V

DOCKET NO:

50-370 UNIT.: McGuire 2 1

(.-'

DATE:

12/15/89 t

NARRATIVE

SUMMARY

a c

Month: November 1989

'r McGuire Unit 2 began.the month of November operating at 100% full power. The unit operated the entire month of November with no power reductions or outages.

l t

1' l

t i

i l'

. Prepared by: S. W. Moser Telephone: 704-373-5762 1

1 l

l-1 l

t

9' 475 s,'

c g;,.e,,

.=

r).

1 I

MONTHLY REFUELING INFORMATION REQUEST 4h

1.. Facility name: McGuire, Unit 2

-2.

Scheduled next refueling shutdown:

September 1990

3. - Scheduled resttrt following refueling:

November 1990

~

4.,

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No s

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A l

x q

A 5.

Scheduled date(s) for submitting proposed licensing action and supporting 9j}

information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a). in the core: 193 (b)- in the spent fuel pool:

590 4

8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

-9.

Projected date of last refueling which can be accommodated by present licensed capacity:

July, 2002 l

DUKE POWER COMPANY DATE:

December 15, 1989 Name of

Contact:

J. A. Reavis Phone:

704-373-7567

- - - - -