J

[

OPERATING DATA REPORT J

DOCKET NO.

50-285 i

UNIT Fort Calhoun Station DATE December 22, 1989

' COMPLETED BY D. L. Stice TELEPHONE (402)636-2474 OPERATING STATUS

1. -Unit Name: Fort Calhoun Station' Notes 2.

Reporting Period:

October 1989 3.

Licensed Thermal Power (MWt):

1500 4.

Nameplate Rating (Gross MWe):

502 5.

DesignElectricalRating(NetMWe): 478 6.

MaximumDependableCapacity(GrossMWe):

502-Maximum Dependable Capacity (Net MWe)(: '

478 7.

r If changes occur in capacity Ratings ItemNumDers3through7)SinceLastReport, 8.

Give Reasons:

N/A 9.

Power Level to Which Restricted, If Any (Net MWe): N/A'

10. Reasons for Restrictions, If Any: N/A

~This Month Yr-to-Date Cumulative 11.

Hours in Reporting Period 745.0 7,296.0-141,146.0

/

12.

Number of Hours Reactor was Critical 745.0-6,352.5 109,702.3

/

13. Reactor Reserve Shutdown Hours.

0.0 0.0 1,309.5

14. Hours Generator On-Line 745.0 6,126.1 108,541.4

/

15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 i

16. GrossThermalEnergyGenerated(MWH) 1,051,493.3-8,540,031.6 141,429,025.5./

17.

GrossElectricalEnergyGenerated(MWH)

-340,160.0 2,751,026.0~

46,495,154.2

/_

18.

Net Electrical Energy Generated (MWH) 323,325.3 2,614,260.2 44,385,765.0

/-

19. Unit Service Factor 100.0

-84.0 76.9

/

l 20.

Unit Availability Factor 100.0 84.0 76.9

/

i

21. UnitCapacityFactor(UsingMDCNet) 90.9 75.0 68.4

/

l 22.

Unit Capacity Factor (Using DER Net) 90.9-75.0 66.7

/

23.

Unit Forced Outage Rate 0.0 4.4 3.0

/-

o 24.

Shutdowns Scheduled Over Next 6 Months (T3pe, Date, and Duration.of Each):

Refuelino Outace estimated to begin on February 16, 1990,- with a planned duration of 86 days.

./

25.

If Shut Down at End of Report Period, Estimated Date of Startup: N/A 26.

Units In Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY i

INITIAL ELECTRICITY N/A 1

COMMERCIAL OPERATION

-l 9001020222 891222

{DR ADOCK 0500 5

Revision 1 Dmh 22,1989 h