Revised Monthly Operating Rept for Oct 1989 for Fort Calhoun Station
ML20011D882
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/31/1989
From: Stice D
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20011D878 List:
References
NUDOCS 9001020222
Download: ML20011D882 (1)


Text

. . . _ _ _ . . . _ _ . _ _ . _ . . _.

.- J

[ OPERATING DATA REPORT J

DOCKET NO. 50-285 i UNIT Fort Calhoun Station  !

DATE December 22, 1989

' COMPLETED BY D. L. Stice l TELEPHONE (402)636-2474  :

OPERATING STATUS

1. -Unit Name: Fort Calhoun Station' Notes
2. Reporting Period: October 1989
3. Licensed Thermal Power (MWt): 1500 4.

Nameplate Rating (Gross MWe): 502

5. DesignElectricalRating(NetMWe): 478
6. MaximumDependableCapacity(GrossMWe): 502-  :
7. 478
8. Maximum Dependable If changes occur in capacityCapacity Ratings(Net MWe)(: '

ItemNumDers3through7)SinceLastReport, r

Give Reasons:

N/A

9. Power Level to Which Restricted, If Any (Net MWe): N/A'
10. Reasons for Restrictions, If Any: N/A '

~This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 745.0 7,296.0- 141,146.0 /
12. Number of Hours Reactor was Critical 745.0- 6,352.5 109,702.3 /
13. Reactor Reserve Shutdown Hours. 0.0 0.0 1,309.5
14. Hours Generator On-Line 745.0 6,126.1 108,541.4 /
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 i
16. GrossThermalEnergyGenerated(MWH) 1,051,493.3- 8,540,031.6 141,429,025.5 ./
17. GrossElectricalEnergyGenerated(MWH) -340,160.0 2,751,026.0~ 46,495,154.2
18. Net Electrical Energy Generated (MWH) /_

323,325.3 2,614,260.2 44,385,765.0 /-

19. Unit Service Factor 100.0 -84.0 76.9 /

l 20. Unit Availability Factor 100.0 84.0 76.9 /

i 21. UnitCapacityFactor(UsingMDCNet) 90.9 75.0 68.4 /

l 22. Unit Capacity Factor (Using DER Net) 90.9- 75.0 66.7

23. Unit Forced Outage Rate

/ .

o

' 0.0 4.4 3.0 /-

24. Shutdowns Scheduled Over Next 6 Months (T3pe, Date, and Duration.of Each):

Refuelino Outace estimated to begin on February 16, 1990,- with a planned duration of 86 days.

25. ./

If Shut Down at End of Report Period, Estimated Date of Startup: N/A

26. Units In Test Status (Prior to Commercial Operation): Forcast Achieved 1

INITIAL CRITICALITY i INITIAL ELECTRICITY N/A 1 COMMERCIAL OPERATION -l 9001020222 891222 ADOCK 0500 5 Revision 1

{DR Dmh 22,1989 h