Text
...
J
[
OPERATING DATA REPORT J
DOCKET NO.
50-285 i
UNIT Fort Calhoun Station DATE December 22, 1989
' COMPLETED BY D. L. Stice TELEPHONE (402)636-2474 OPERATING STATUS
- 1. -Unit Name: Fort Calhoun Station' Notes 2.
Reporting Period:
October 1989 3.
Licensed Thermal Power (MWt):
1500 4.
Nameplate Rating (Gross MWe):
502 5.
DesignElectricalRating(NetMWe): 478 6.
MaximumDependableCapacity(GrossMWe):
502-Maximum Dependable Capacity (Net MWe)(: '
478 7.
r If changes occur in capacity Ratings ItemNumDers3through7)SinceLastReport, 8.
Give Reasons:
N/A 9.
Power Level to Which Restricted, If Any (Net MWe): N/A'
- 10. Reasons for Restrictions, If Any: N/A
~This Month Yr-to-Date Cumulative 11.
Hours in Reporting Period 745.0 7,296.0-141,146.0
/
12.
Number of Hours Reactor was Critical 745.0-6,352.5 109,702.3
/
- 13. Reactor Reserve Shutdown Hours.
0.0 0.0 1,309.5
- 14. Hours Generator On-Line 745.0 6,126.1 108,541.4
/
15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 i
- 16. GrossThermalEnergyGenerated(MWH) 1,051,493.3-8,540,031.6 141,429,025.5./
17.
GrossElectricalEnergyGenerated(MWH)
-340,160.0 2,751,026.0~
46,495,154.2
/_
18.
Net Electrical Energy Generated (MWH) 323,325.3 2,614,260.2 44,385,765.0
/-
- 19. Unit Service Factor 100.0
-84.0 76.9
/
l 20.
Unit Availability Factor 100.0 84.0 76.9
/
i
- 21. UnitCapacityFactor(UsingMDCNet) 90.9 75.0 68.4
/
l 22.
Unit Capacity Factor (Using DER Net) 90.9-75.0 66.7
/
23.
Unit Forced Outage Rate 0.0 4.4 3.0
/-
o 24.
Shutdowns Scheduled Over Next 6 Months (T3pe, Date, and Duration.of Each):
Refuelino Outace estimated to begin on February 16, 1990,- with a planned duration of 86 days.
./
25.
If Shut Down at End of Report Period, Estimated Date of Startup: N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forcast Achieved INITIAL CRITICALITY i
INITIAL ELECTRICITY N/A 1
COMMERCIAL OPERATION
-l 9001020222 891222
{DR ADOCK 0500 5
Revision 1 Dmh 22,1989 h
L:n m
--