Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20010F041 + (ML20010F041)
- ML20010F042 + (ML20010F042)
- BSEP-81-1614, RO 2-81-65:on 810827,2-hr Time Requirement for Repairing Failed HPCI Temp Switch Violated.Caused by Personnel Delay in Issuing Work Order to Repair Instrument.Repairs Made. Investigation Underway + (ML20010F046)
- ML20010F048 + (ML20010F048)
- ML20010F050 + (ML20010F050)
- ML20010F051 + (ML20010F051)
- L-81-376, Interim Deficiency Rept Re Linear Indications in Reactor Coolant Pump Volute,Initially Reported on 810610.Final Determination Contingent Upon Addl Info Relative to Size & Depth of Excavations.Final Rept to Be Submitted by 811027 + (ML20010F052)
- ML20010F053 + (ML20010F053)
- ML20010F054 + (ML20010F054)
- W3P81-2041, Forwards Info to Close Out SER Items Re Steam Voiding in Reactor Vessel Analysis,Loss of Offsite Power or Tripping of Reactor Coolant Pumps During Main Steam Line Break & Clarification of Transient Anaysis W/Potential Fuel Damage + (ML20010F055)
- ML20010F056 + (ML20010F056)
- ML20010F057 + (ML20010F057)
- PNO-V-81-048, on 810904,seismic Triggers Tripped.Caused by Earthquake.No Apparent Damage.Licensee Following Insp Procedures + (ML20010F059)
- ML20010F060 + (ML20010F060)
- ML20010F062 + (ML20010F062)
- ML20010F064 + (ML20010F064)
- ML20010F065 + (ML20010F065)
- ML20010F066 + (ML20010F066)
- ML20010F067 + (ML20010F067)
- ML20010F068 + (ML20010F068)
- ML20010F069 + (ML20010F069)
- ML20010F070 + (ML20010F070)
- ML20010F071 + (ML20010F071)
- ML20010F072 + (ML20010F072)
- ML20010F073 + (ML20010F073)
- ML20010F074 + (ML20010F074)
- ML20010F075 + (ML20010F075)
- 05000324/LER-1981-078, Forwards LER 81-078/03L-0 + (ML20010F076)
- ML20010F077 + (ML20010F077)
- ML20010F080 + (ML20010F080)
- 05000324/LER-1981-078-03, /03L-0:on 810804,RHR SW Subystem Pump a Would Not Start Due to Pump Suction Header Low Pressure Lockout Signal from Header Pressure Switch.Caused by Loose Plug in Switch Diaphragm Housing,Allowing Diaphragm Fluid to Leak + (ML20010F082)
- ML20010F083 + (ML20010F083)
- ML20010F086 + (ML20010F086)
- TXX-3369, Responds to Fire Protection Open Items Referenced in NRC 810626 Memo + (ML20010F088)
- ML20010F089 + (ML20010F089)
- ML20010F090 + (ML20010F090)
- ML20010F092 + (ML20010F092)
- ML20010F093 + (ML20010F093)
- ML20010F095 + (ML20010F095)
- AECM-81-301, Final Deficiency Rept Re Unauthorized Mod of Heating, Ventilation & Air Conditioning Fire Dampers,Initially Reported on 801216.Deficiency Not Reportable Because Condition Would Not Affect Safety of Plant Operations + (ML20010F096)
- ML20010F097 + (ML20010F097)
- ML20010F099 + (ML20010F099)
- 05000280/LER-1981-025, Forwards Updated LER 81-025/01X-1 & LERs 81-037/03L-0, 81-050/03L-0 & 81-051/03L-0 + (ML20010F101)
- ML20010F102 + (ML20010F102)
- AECM-81-302, Interim Deficiency Rept 1 Re Loss of Solid Metallic Grounding of Flexible Conduit,Initially Reported on 801210. Field Disposition Instructions Issued.Work Will Be Completed Prior to Fuel Load.Next Rept by 811020 + (ML20010F103)
- ML20010F105 + (ML20010F105)
- ML20010F106 + (ML20010F106)
- 05000280/LER-1981-037-03, /03L-0:on 810806,charging Pump Svc Water Pumps 1-SW-P-10A & B Found to Have Zero Discharge Pressure Due to Loss of Suction to Pumps.Caused by Increased Use of Svc Water by Chillers During Summer Months.Strainers Cleaned + (ML20010F108)
- 05000324/LER-1981-085, Forwards LER 81-085/03L-0 + (ML20010F109)
- ML20010F110 + (ML20010F110)
- 05000260/LER-1981-043, Forwards LER 81-043/01T-0 + (ML20010F111)