ML20010F050

From kanterella
Jump to navigation Jump to search
Forwards Semiannual Monitoring Rept for Jan-June 1981, Containing Info Re Plant Releases,New Fuel Receipts,Environ Radiological Monitoring & Leak Testing of Sources
ML20010F050
Person / Time
Site: Point Beach  
Issue date: 08/31/1981
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20010F051 List:
References
NUDOCS 8109090307
Download: ML20010F050 (1)


Text

__ _

1 Wisconsin Electnc mecwm 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, W153201 August 31, 1981 N

h Office of Nuclear Reactor Regulation b

b [..- ih s r

Mr. Harold R. Denton, Director s

U U.

S. NUCLEAR REGULATORY COMMISSION SEP 0 81981*

Washing ton,

D.

C.

20555

~

g-u.s. Nucun ammas co stu nt 3

Dear Mr. Denton:

P DOCKET NOS. 50-266 AND 50-301 m

SEMIANNUAL MONITORING REPORT POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed herewith is the Semiannual Monitoring Report for the Point Beach Nuclear Plant for the period from January 1 to June 30, 1981.

This report is submitted in accordance with Technical Specification 15.6.9.3.C and contains information regar' ding plant releases, new fuel receipts, environmental radio-logical monitoring and leak testing of sources during the reporting period.

Forty copies of this report are being provided to you under separate cover.

Very truly yours,

^.n_

s N

Sol Burstein Exe utive Vice President Enclosure Copy to NRC Resident Inspector 8109090307 810831 I

gDRADOCK05000 14 g(

\\

~