ML20010F106
| ML20010F106 | |
| Person / Time | |
|---|---|
| Site: | 03010525, Fermi |
| Issue date: | 08/21/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wells D DETROIT EDISON CO. |
| Shared Package | |
| ML20010F107 | List: |
| References | |
| NUDOCS 8109090377 | |
| Download: ML20010F106 (2) | |
See also: IR 05000016/1981001
Text
o
.
.
.
<
,
./@ , r\\l b
u
-
-
s
/
'
0
AUG 2 i G
b
SEP 0 3198I"'
k us.wy'sW" 8
%
d
T e
Docket No. 50-16
License No. 21-02335-10
Docket. No. 50-341
The Detroit Edi o n company
ATTN: Mrs Donald A. Wells
Ms tager, Quality Assurance
2000 Sect d Avenue
Detroit, MI 48226
Gentlemen:
This refers to the routine safety inspection conducted by Mr. L. J. Hueter
of this office on July 13-17, 1981, of activities at Enrico Fermi Atomic
Power Plant, Units 1 and 2, authorized by NRC Facility Operations License
No. 9, by NRC Construction Permit No. CPPR-87, and by Byproduct Material
License No. 21-02335-10, and to the discussion of our findings with
Mr. E. Griffing and others of your staff at the conclusion of the inspection.
The inspection was an examination of activities conducted under your license
as they relate to radiation safety and to compliance with the Commission's
rules and regulations and with the conditions of your license. The inspec-
tion consisted of a selective examination of procedures and representative
records, observations, independent measuremente, and interviews with
personnel.
No items of noncompliance with NHC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and t he enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intenticn to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
G6
ItO9090377 810821
<
PDR ADOCK 05000016
O
.
..
..
-
-.
-
-
-
.
.
. .
.
-
.
4
in
2-
Ab9 3 I UT
.
'
~
Detroit-Edison Company
-
x
j
this letter a written application to this office to withhold such infor-
nation. 'Section 2.790(b)(1) requires.that any such application must be
accompanied by an affidavit executed by the owner of the infor: nation which
identifies the document or part sought to be withheld, and which contains
la full statement of the reasons which are the bases for the claim that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
twe.do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspection report will be
i
placed-in'the Public Document Poom.
l
.
We will' gladly discuss any questions you have concerning this inspection.
l
Sincerely,
!
l
C. E. Norelius, Director
!
Division of Engineering and
l
Technical Inspection
.
Enclosure:
IE Inspection
l
Reports No. 50-16/81-01;
50-341/81-13 and No.
.
30-10525/81-01
1
cc w/ enc 1:
DMB/ Document Control Desk (RIDS)
. Resident Inspector, RIII
l
' Ronald Callen, Michigan
Public Service Connaission
Eugene B. Thomas, Jr.,
Attorney
t
l
l'
i
l
.
b
R]
RIII
RIII
RIII
RIII
r/jp .
er Esni
Kon
ii
y20
q #{sg/
.8/17/81
. .
fy-
y'
4=.,y,y.
m
-,g.e
-*-+--w
m+
gps-y
e
-y-99
+
-7,#
>pg
m-,
a.r-mr-'
y.en
- - -5gq
a*-=
yi
w-
d
4