Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20006B239 + (ML20006B239)
- ML20006B244 + (ML20006B244)
- 05000498/LER-1989-022-01, :on 891205,discovered That ASME Section XI Pressure Test of Train C of Component Cooling Water Sys Not Performed Prior to Returning Sys to Svc.Sys Inoperable from 890909-1206.Test Control Procedures Revised + (ML20006B255)
- ML20006B256 + (ML20006B256)
- ML20006B258 + (ML20006B258)
- B13437, Responds to NRC Re Violations Noted in Insp Rept 50-213/89-22 Re Health Physics Training Requirement. Violation Contested Based on NRC Misinterpretation of Tech Spec 6.4.1 Re Training/Replacement Training Program + (ML20006B259)
- ML20006B260 + (ML20006B260)
- ML20006B263 + (ML20006B263)
- ML20006B266 + (ML20006B266)
- ML20006B267 + (ML20006B267)
- ML20006B272 + (ML20006B272)
- ML20006B277 + (ML20006B277)
- 05000416/LER-1989-017, :on 890718,determined That Isolation for Postulated RWCU Blowdown Line Breaks in Piping Cold Rooms Was 80 S,Causing Plant to Operate in Unanalyzed Condition. Tech Spec Change Request Will Be Submitted + (ML20006B278)
- ML20006B288 + (ML20006B288)
- ML20006B296 + (ML20006B296)
- ML20006B299 + (ML20006B299)
- ML20006B316 + (ML20006B316)
- ML20006B328 + (ML20006B328)
- ML20006B333 + (ML20006B333)
- ML20006B337 + (ML20006B337)
- ST-HL-AE-3346, Forwards Rev 4 to Pump & Valve Inservice Test Plan. Rev Includes Addition of Component Cooling Water Valves FV-0864,FV-0862 & FV-0863 & Containment Sys Valves FV-1025, FV-1026,FV-1027 & FV-1028 + (ML20006B355)
- ML20006B356 + (ML20006B356)
- ML20006B361 + (ML20006B361)
- ML20006B378 + (ML20006B378)
- ML20006B380 + (ML20006B380)
- ML20006B381 + (ML20006B381)
- ML20006B382 + (ML20006B382)
- ML20006B384 + (ML20006B384)
- ML20006B385 + (ML20006B385)
- ML20006B386 + (ML20006B386)
- ML20006B387 + (ML20006B387)
- ML20006B388 + (ML20006B388)
- ML20006B389 + (ML20006B389)
- ML20006B390 + (ML20006B390)
- ML20006B392 + (ML20006B392)
- ML20006B393 + (ML20006B393)
- ML20006B394 + (ML20006B394)
- 1CAN019016, Updates Actions Implemented & Results Achieved from Plan Submitted in Jan 1988 for Reducing Temp in Reactor Bldg.Addl Temp Instrumentation Utilized & Installed Temporarily to Collect Data for Comparison of Temps + (ML20006B395)
- ML20006B396 + (ML20006B396)
- ML20006B398 + (ML20006B398)
- ML20006B399 + (ML20006B399)
- ML20006B401 + (ML20006B401)
- ML20006B402 + (ML20006B402)
- 05000334/LER-1989-018-01, :on 891227,reactor Trip Occurred Following Initial Startup from Refueling Outage.Caused by Trip of 480 Volt Ac Feeder Breaker to Rod Drive Motor Generator Sets. Installed Spare Breaker Tested + (ML20006B403)
- ML20006B404 + (ML20006B404)
- ML20006B405 + (ML20006B405)
- ML20006B406 + (ML20006B406)
- ML20006B407 + (ML20006B407)
- ML20006B411 + (ML20006B411)
- W3P90-0605, Informs That Photographic Surveys Discontinued,Per Basemat Monitoring Program.Monitoring Program Implementing Procedure Will Be Revised to Reflect Change + (ML20006B412)
- ML20006B413 + (ML20006B413)