Forwards Safety Evaluation Accepting Proposed Electrical Sys Changes for Fire Protection Per 10CFR50,App R.Conclusion Based on Approval of Exemption Request Re App R & Commitment to Provide Reg Guide 1.75 Compliance Review
ML20006B399
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/22/1990
From: Wang A
Office of Nuclear Reactor Regulation
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20006B400 List:
References
RTR-REGGD-01.075, RTR-REGGD-1.075 TAC-65034, NUDOCS 9002020057
Download: ML20006B399 (2)


Text

r#~f g

January 22, 1990

  • Docket No. 50-213 t

Mr. Edward J. Mroczka Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company t

Northeast Nuclear Energy Company P.O. Box 270 Hartford, Connecticut 061A1-0270 t

Dear Mr. Mroczka:

i

SUBJECT:

NEW SWITCHGEAR ROOM SAFETY EVALUATION - HADDAM NECKPLANT(TAC 65034)

As required by order, Connecticut Yankee Atomic Power Company (CYAPCO) is i

committed to comply with 10 CFR 50, Appendix R, before the restart from Cycle

16. CYAPC0 has committed to install a new switchgear room to comply with Appendix R.

CYAPC0 furnished several Plant Design Change Records (PDCRs) to describe the changes and additions being made.

In addition, CYAPCO provided additional information by letters dated July 10, July 31, and September 29, 1989.

The switchgear room review has been divided between several disciplines. This review of the PDCRs and responses to request for additional information, which will be one of several, focused on the electrical design of the new switchgear room. We have concluded that the proposed electrical design is acceptable as discussed in the enclosed safety evaluation.

This conclusion is based on the approval of your exemption request related to Appendix R and your commitment to provide a copy of y'o'ur Regulatory Guide 1.75 compliance review. Any instances where the Appendix R separation criteria are l

not met will require further NRC review. A separate evaluation will address the Appendix R shutdown considerations following postulated fires in various fire areas.

Sincerely,

/s/

l Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects - I/II

)

Office of Nuclear Reactor Regulation

Enclosure:

As stated DISTRIBUTION:

esDEE55fTffC OGC cc: w/ enclosure

~NRC'A Local PDRs EJordan See next page Plant File ggg20jj85 $$$N333 SVarga ACRS(10)

BBoger SNorris p

PDC AWang LA DI PM:PDI-4 PD:PDI Sid:

b AWang:rmg #

JStolz

(

1/l]/90 1/?2/90 1/27/90 t(

)

(DOCUMENTHAME: LTR/HADDAM NECK) 0FFICIAL RECORD COPY

Mr. Edward J. Mroczka Cnnnecticut Yankee Atomic Power Company Haddam Neck Plant i

cc:

I Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Compar.y City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations Director of Quality Services flertheast Utilities Service Company Northeast Nuclear Energy Company Post Office Ecx 270 Post Office Box 270 Hertford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin PcCarthy, Director Regional Administrator Radiation Centrol Unit Region !

Cepartrent of Environmental Protection U. S. Nuclear Regulatory Corer.ission State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Bradford S. Chase, under Secretary Board of Selectmen Energy Divisien Town Hall l

Office of Policy and Management Haddam, Connecticut 06103 80 Washington Street l

Hartford, Connecticut 06106 J. T. Shedlosky, Resident Inspector Haddam Neck Plant D. B. Miller, Station Superintendent c/o U. S. Nuclear Regulatory Comission Haddan tjeck Plant Post Office Box 116 Connecticut Yankee Atomic Power Company East Haddam Post Office RFD 1 Post Office Box 127E East Haddam, Connecticut 06423 East Hampton, Connecticut 06424 G. H. Bouchard, Unit Superintendent liaddam Neck Plant RFD #1 Fost Office Box 127E East Hampton, Connecticut 06424 s