Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19351F810 + (ML19351F810)
- ML19351F811 + (ML19351F811)
- ML19351F812 + (ML19351F812)
- ML19351F813 + (ML19351F813)
- ML19351F814 + (ML19351F814)
- ML19351F815 + (ML19351F815)
- ML19351F816 + (ML19351F816)
- ML19351F817 + (ML19351F817)
- PNO-III-80-186, on 801014,coal Dust Explosion & Fire Occurred.Seven Persons Injured.Cause Not Stated. Investigation Underway to Determine If Radioactive Matl Involved in Fire + (ML19351F818)
- PNO-III-80-185, during Outage Begun 800407,excessive Leakage Through Decay Heat Removal Sys Check Valve CF-30 Was Identified.Cause Unknown.Attempt Will Be Made to Exercise Check Valve.Sys Will Be Drained for Repairs as Alternative + (ML19351F819)
- ML19351F821 + (ML19351F821)
- PNO-III-80-188, on 801014,five Workers Found Contaminated. Probably Obtained While Assembling Control Rod Drives. Investigation Underway.Detectable Contamination Removed from Workers + (ML19351F823)
- ML19351F824 + (ML19351F824)
- ML19351F825 + (ML19351F825)
- PNO-III-80-189, on 801015,contractor Informed That Piping in Five Reactor Auxiliary Sys Failed to Meet Piping Support Seismic Qualification.Facilities W/Similar Design Under Evaluation + (ML19351F826)
- ML19351F827 + (ML19351F827)
- PNO-III-80-190, on 801017,unit Will Be Shutdown for Three Days for Station Battery Discharge Testing,Control Rod Driveline Maint,Electromatic Relief Valve Testing,Scram Timing & Cleaning Contaminated Condensate Storage Tank + (ML19351F828)
- PNO-III-80-190A, during Power Decrease for 801017 Outage, Main Steam Relief Valve 3C Failed.Cause Unknown.Spare Valve Substituted.During Startup,Turbine Steam Seal Relief Valve Found Leaking.Cause Not Stated.Valve Repaired + (ML19351F830)
- ML19351F831 + (ML19351F831)
- PNO-III-80-191, on 801017,airplane Possibly Contaminated from Flying Through Chinese Hydrogen Bomb Test Cloud.Survey to Be Performed + (ML19351F832)
- PNO-III-80-202, on 801031,excessive Radiation Level Under Vehicle Transporting Radwaste Shipment Found Upon Arrival at Burial Site.Investigation Underway + (ML19351F834)
- ML19351F836 + (ML19351F836)
- ML19351F837 + (ML19351F837)
- ML19351F839 + (ML19351F839)
- ML19351F840 + (ML19351F840)
- ML19351F841 + (ML19351F841)
- ML19351F843 + (ML19351F843)
- ML19351F844 + (ML19351F844)
- ML19351F845 + (ML19351F845)
- ML19351F846 + (ML19351F846)
- ML19351F847 + (ML19351F847)
- ML19351F849 + (ML19351F849)
- ML19351F850 + (ML19351F850)
- ML19351F852 + (ML19351F852)
- ML19351F854 + (ML19351F854)
- ML19351F855 + (ML19351F855)
- ML19351F856 + (ML19351F856)
- ML19351F857 + (ML19351F857)
- ML19351F859 + (ML19351F859)
- ML19351F860 + (ML19351F860)
- ML19351F862 + (ML19351F862)
- ML19351F863 + (ML19351F863)
- ML19351F864 + (ML19351F864)
- ML19351F865 + (ML19351F865)
- ML19351F866 + (ML19351F866)
- ML19351F867 + (ML19351F867)
- ML19351F868 + (ML19351F868)
- ML19351F869 + (ML19351F869)
- ML19351F870 + (ML19351F870)
- ML19351F871 + (ML19351F871)
- ML19351F872 + (ML19351F872)