Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19350E622 + (ML19350E622)
- ML19350E623 + (ML19350E623)
- ML19350E624 + (ML19350E624)
- ML19350E625 + (ML19350E625)
- ML19350E626 + (ML19350E626)
- ML19350E628 + (ML19350E628)
- ML19350E629 + (ML19350E629)
- TXX-3310, Advises That Evaluation of Consequences of Circulating Water Expansion Joint Failure Is in Progress.Specific Aim Is to Ascertain Time When Resultant Flooding of Turbine & Electrical & Control Bldgs Will Reach PMF Water Levels + (ML19350E630)
- AECM-81-197, Interim Deficiency Rept 2 Re Bettis Spring Return Actuators, Initially Submitted on 801222.Five Bettis Actuators Installed on Henry Pratt Valves at Facility.Final Rept Will Be Submitted by 810915 + (ML19350E631)
- ML19350E632 + (ML19350E632)
- ML19350E633 + (ML19350E633)
- RBG-10565, Responds to Generic Ltr 81-04.Generic Emergency Procedure Guidelines Will Include Actions to Mitigate Station Blackout Event & Assure Adequate Core Cooling + (ML19350E635)
- ML19350E636 + (ML19350E636)
- TXX-3339, Advises That Requirements for Confirmation of Availability of Auxiliary Feedwater Sys Flow Trains That Have Been Out of Svc Has Been Implemented.Preliminary Tech Spec Requires Monthly Sys Train Testing + (ML19350E637)
- RBG-10564, Confirms Oct 1983 as Fuel Load Date for Unit 1 + (ML19350E638)
- ML19350E639 + (ML19350E639)
- ML19350E640 + (ML19350E640)
- IR 05000416/1981008 + (ML19350E642)
- ML19350E643 + (ML19350E643)
- ML19350E644 + (ML19350E644)
- ML19350E645 + (ML19350E645)
- ML19350E646 + (ML19350E646)
- ML19350E647 + (ML19350E647)
- ML19350E648 + (ML19350E648)
- ML19350E649 + (ML19350E649)
- ML19350E651 + (ML19350E651)
- ML19350E653 + (ML19350E653)
- ML19350E654 + (ML19350E654)
- ML19350E655 + (ML19350E655)
- ML19350E658 + (ML19350E658)
- ML19350E662 + (ML19350E662)
- PNO-I-81-066, on 810617,boron Recovery Degasifier Relief Valve Lifted Causing Higher than Normal Radioactive Gas Concentrations in Primary Auxiliary Bldg.Temporary Flowpath for RCS Drains Established + (ML19350E664)
- ML19350E672 + (ML19350E672)
- ML19350E674 + (ML19350E674)
- IR 05000416/1981015 + (ML19350E676)
- IR 05000508/1981009 + (ML19350E677)
- 05000327/LER-1980-209, Forwards LER 80-209/03L-0 + (ML19350E678)
- ML19350E679 + (ML19350E679)
- 05000247/LER-1981-014, Forwards LER 81-014/03L-0 + (ML19350E680)
- ML19350E681 + (ML19350E681)
- 05000327/LER-1980-209-03, /03L-0:on 800922,no post-maint Testing Performed After Maint on RHR Heat Exchanger Discharge Isolation Valve. Caused by Personnel Error.List Issued Listing All Valves Which Require pre- or post-maint Testing + (ML19350E682)
- 05000247/LER-1981-014-03, /03L-0:on 810517,one Sensing Device Found Not Operating on Level Transmitters LT-940 & LT-941.Caused by Foreign Matl Buildup on Instrument Stalks of Gem Level Transmitters.Matl Removed & Transmitter Tested + (ML19350E683)
- ML19350E684 + (ML19350E684)
- PM-81-507, Forwards Monthly Operating Rept for May 1981 + (ML19350E685)
- ML19350E686 + (ML19350E686)
- ML19350E687 + (ML19350E687)
- ML19350E688 + (ML19350E688)
- ML19350E689 + (ML19350E689)
- 1CAN061810, Forwards Monthly Operating Rept for May 1981.Revised Pages for Mar & Apr 1981 Also Encl + (ML19350E690)
- ML19350E691 + (ML19350E691)
- ML19350E692 + (ML19350E692)