Forwards IE Insp Rept 50-341/81-04 on 810421-24 & Notice of Violation
ML19350E633
Person / Time
Site: Fermi 
Issue date: 05/29/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wells D
DETROIT EDISON CO.
Shared Package
ML19350E634 List:
References
NUDOCS 8106230378
Download: ML19350E633 (2)


See also: IR 05000341/1981004

Text

.

- . -

-

.

"%.,.

Dpp

n

a

  • o,,

UNITED STATES

,

,

8

NUCLEAR REGULATORY COMMISSION

o

  • *

e

REGION lil

U

790 ROOSEVELT ROAD

% ....j/

,

atEu Ettvu ittiuOis sais7

+

VAY 2 9 1981

.

q

/

g

Docket No. 50-341

{

q

The Detroit Edison Company

-

M'~

ATTN:

Mr. Donald A. Wells

  • DoduY"

Manager, Quality Assurance

2000 Second Aven..e

9

-

s

Detroit, MI 48226

i G)i

Gentlemen:

This refers to the routine safety inspection conducted by Mr. I. T. Yin of

this office at the Enrico Fermi 2 site on April 21-24, 1981, of activities

authorized by NRC Construction Permit No. CPPR-87 and to the discussion of

our findings with Mr. W. J. Fahrner at the conclasion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in enclosed Appendix A.

A

written response, submitted under oath or affirmation,'is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document uoom.

If the enclosures contain any

information that you or your contractors believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this

office by telephone within seven (7) days from the date of this letter of

your intention to file a request for withholding; and (b) submit within

twenty-five (25) days from the date of this letter a written application

to this office to withhold such information. Section 2.790(b)(1) requires

that any such application must be accompanied by an affidavit executed by

the owner of the information which identifies the document or part sought

to be withheld, and which contains a full statement of the reasons on the

o ais which it is claimed that the information should be withheld from

public disclosure. This section further requires the s.tatement to addrecs

hs

/I

8106230'bY

Q

-

. . _.- . , . . ~

-

a

.

.

-

yg 2 9 W

- The Detroit Edison Company

-2-

.

- with specificity the consideraticas listed in 10 CFR 2.790(b)(4). The

information sought to be withheld shall be incorporated as far as possible

into a separate part of che affidavit.

If we do not hear from you in this

regard within the specified periods noted above, a copy of this letter,

the enclosures, and your response to this letter will be placed in the

Public Document Room.

During an Enforcement Conference held on August 10, 1979, to discuss

recurring suspension system problems, you agreed to provide this office a

.

hanger installation and status report on a weekly basis. Based oa the

results of this inspection and an inspection conducted in September 1980,

(Report No. 50-341/80-16) we concluded you have demonstrated effective

control over these recurring problems. We consider this matter closed and

submittal of a weekly installation and status report is no longer necessary.

We will gladly discuss any questions _you have concerning this inspection.

Sincerely,

C. E. Norelius, Acting Director

Division of Engineering and Technical

Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-341/81-04

cc w/encls:

. DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Eugene B. Thomas, Jr.,

Attorney