ML19350E674
| ML19350E674 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 06/05/1981 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Leddick R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19350E675 | List: |
| References | |
| NUDOCS 8106230427 | |
| Download: ML19350E674 (2) | |
See also: IR 05000508/1981009
Text
~
,.
,
.
,
'#
o,,
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
o
3
,E
PEGION V
1990 N. CALIFORNIA BOULEVARD
.**,,*/
SUITE 202, WALNUT CREEK PLAZA
WALNUT CREEK. CALIFORNIA 94696
June 5, 1981
Docket No. 50-508, 50-509
4
ks
12
Washingtor. Public Power Supply System
pi
'l
--
P. O. Box 1223
im
f
Elma, Washington 98541
7
Attention: Mr. R. S. Leddick
'
, ' "r
Program Director, WNP-3/5
"
Gentlemen:
Subject: NRC. Inspection at Washington Nuclear Projects Nos. 3 and 5 (WNP-3/5)
This refers to the inspection conducted by Messrs. D. P. Hatst and J. O.
Elin of this office on May 12-15, 1981 of activities authorized by NRC Construction
Permit Nos. CPPR 154 and CPPR 155, and to the discussion of our findings
with you and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copfj
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information that
you(oryourcontractors)believetobeexemptfromdisclosureunder10
CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone
within ten (10) days.from the date of this letter of your intention to
file a request for withholding; and (b) submit within 25 days from the date
of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven
(7) days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent with section 2.790
(b)(1), any such application must be accompanied by an affidavit executed
by the owner of the infonnation which identifies the document or part sought
to be withheld, and which contains a full statement of the basis on which
it is claimed that the information should be withheld from public disclosure.
T6ol
s
810628O Y
9
.
.
.
.
._ -
. _ _ _ - _ _ _ -
_
- .
-
,
--
Washington Public Power Supply System
-2
June 5, 1981
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall'be incorporated as far as possible into a separate
part of the affidavit. If we do not hear from you in this regard within
the specified periods noted above, the report will be placed in the Public
Document Room.
Should you have; any questions cc,ncerning this inspection, we will be glad
to discuss them with you.
Sincerely,
B. Faulkenberry, Chief
Reactor Construction Projects Branch
Enclosure:
IE Inspection Report
No. 50-508/509/81-09
cc w/o enclosure:
R. B Glasscock, Quality Assurance Director
D. E. Dobton, Project Manager
.
l
- .
.
.
. .
. .
- . .
..
.
. .
.
. .
- - . - . .
. . - .