First Interim Deficiency Rept Re QA Documentation for Drywell Framed Embedments,Initially Reported on 810520.Util Is Redoing Nondestructive Exam Using Const site-approved Procedures & Personnel.Next Rept by 811030
ML19350E632
Person / Time
Site: Phipps Bend Tennessee Valley Authority icon.png
Issue date: 06/18/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8106230376
Download: ML19350E632 (2)


Text

.

TENNESSEE V ALLE'f AUTHCF!T'l c A m yccca.re. m cc2 m 400 Chestnut Street Tower II June 18, 1981 PBRD-50-553/81-118 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission

Region II - Suite 3100 101 Mariette Street Atlants, Georgia 30303 .

Dear Mr. O'Re111y:

PHIPPS BEND NUCLEAR ?LANT UNIT 1 - REPORTABLE DEFICIENCY - CA DOCUMENTATION FOR DRTWELL FRAMED EMBEDENTS - PBRD-50-553/81-14 The subject deficiency was initially reported to NRC-OIE, Region II, Inspector P. A. Taylor on May 20, 1981 as NCR's 3-PBN, 4-PBN, and 6-PBN.

In complia9ce with paragraph 50.55(e) of 10 CFn Part 50, we a:?e enclosing the first interim repcrt on the subject deficiency. TVA anticipates transmitting the next report on or before October 30, 1981. If you have any questions, please call Jim Domer at FTS 857-2014 Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety Enctor.ure cc: Mr. Victor Stello, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Tbs iI 8106280 % S

c.

-. +.s a

l~ ENCLOSURE PHIPPS BEND NUCLEAR PLANT DRYWELL FRAMED EMBEDMENTS - QA DOCUMEffrATION PBRD-50-553/81-14 10CFR50.55(e)

REPORT NO. 1 (IKTERIM)

On'May 20, 1981 TVA informed NRC-0IE, Region II Inspector Pete Taylor of a potentially reportable condition under 10 CFR 50.55(e) regarding QA documentation for the drywell framed embedments. This is the first interim report on this condition. A more detailed report will be provided by October 30, 1981.

Description of Deficiency The contract with the manufacturer, Atlas Machine and Iron Works, for the drywell framed embedments was cancelled for lack of performe.nce. Frames were removed from Atlas shops under various stages of fabrication.

Frames 10 and 11 were almost complete when .emoved from Atlas. TVA made the decision to finir5 them at Phipps B.nd site by TVA CONST.

Upon receipt of QA documentation under court injunction, many discrepancies were discovered. It is anticipated that other frames originated under the same contract will have similar problems.

Additional noncenformance reports will be written on these frames as required. ,

Corrective Action TVA is presently evaluating all available documentation for the frames.

Where it is possible, TV4 is redoing NDE using CONST site-approved proeidures and personnel in order to obtain some level of confidence in Atlas NDE documentation. TVA is still in the process of evaluating the i subject deficiencies.