Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19345E125 + (ML19345E125)
- ML19345E126 + (ML19345E126)
- ML19345E127 + (ML19345E127)
- ML19345E128 + (ML19345E128)
- ML19345E129 + (ML19345E129)
- ML19345E132 + (ML19345E132)
- ML19345E133 + (ML19345E133)
- ML19345E134 + (ML19345E134)
- ML19345E135 + (ML19345E135)
- ML19345E137 + (ML19345E137)
- ML19345E138 + (ML19345E138)
- ML19345E141 + (ML19345E141)
- ML19345E142 + (ML19345E142)
- ML19345E143 + (ML19345E143)
- ML19345E144 + (ML19345E144)
- ML19345E145 + (ML19345E145)
- ML19345E147 + (ML19345E147)
- ML19345E148 + (ML19345E148)
- ML19345E150 + (ML19345E150)
- ML19345E151 + (ML19345E151)
- ML19345E152 + (ML19345E152)
- ML19345E153 + (ML19345E153)
- ML19345E154 + (ML19345E154)
- 05000293/LER-1980-089, Forwards LER 80-089/03L-0 + (ML19345E155)
- ML19345E156 + (ML19345E156)
- ML19345E157 + (ML19345E157)
- 05000293/LER-1980-089-03, /03L-0:on 801117,torus Water Level Indicator Lr 5038 on Panel C903 in Control Room Began to Oscillate Irradically.Instrument Declared Inoperable.Caused by Failure of Forced Balanced Motor Boyancy Level Transmitter + (ML19345E158)
- ML19345E160 + (ML19345E160)
- ML19345E161 + (ML19345E161)
- 05000324/LER-1980-103, Forwards LER 80-103/03L-0 + (ML19345E163)
- ML19345E165 + (ML19345E165)
- 05000339/LER-1980-091, Forwards LER 80-091/03L-0 + (ML19345E166)
- ML19345E168 + (ML19345E168)
- ML19345E169 + (ML19345E169)
- 05000324/LER-1980-103-03, /03L-0:on 801118,during Reactor Startup While Investigating Cause of Speed Indication Problems W/Reactor Recirculation Pump 2A,pump Motor Generator Unit Tripped. Caused by Technician Inadvertently Shorting Electrical Lead + (ML19345E170)
- ML19345E171 + (ML19345E171)
- 05000339/LER-1980-091-03, /03L-0:on 801130,while Operating in Mode 3,rod Position Indication for Rods GO3 & JO3 in Bank a & GO7 & GO9 in Bank B Differed from Demand Position by Greater than 12 Steps.Caused by Instrument Drift.Channel Adjusted + (ML19345E172)
- ML19345E173 + (ML19345E173)
- ML19345E174 + (ML19345E174)
- ML19345E175 + (ML19345E175)
- 05000325/LER-1980-089, Forwards LER 80-089/03L-0 + (ML19345E176)
- ML19345E177 + (ML19345E177)
- 05000317/LER-1980-064, Forwards LER 80-064/03L-0 + (ML19345E178)
- ML19345E179 + (ML19345E179)
- 05000325/LER-1980-089-03, /03L-0:on 801120,during Visual Insp of Snubbers on safety-related Sys,Bergan Paterson HSSA3,located on Conventional Svc Water Header anti-siphon Piping Structure, Determined Inoperable.Caused by Excessive Wear on Piston + (ML19345E180)
- 05000317/LER-1980-064-03, /03L-0:on 801121,during Piping Sys Supports Walkdown,Seismic Restraint for Auxiliary Spray Control Valve Found Not Installed.Three Supports Required Redesign & Relocation.Caused by Error During Initial Const + (ML19345E181)
- 05000339/LER-1980-082, Forwards LER 80-082/03L-0 + (ML19345E182)
- ML19345E183 + (ML19345E183)
- 05000339/LER-1980-082-03, /03L-0:on 801125,during Degraded Voltage Test, Breaker 24J1-2 Failed to Open Upon Receiving Undervoltage Test Signal & 2-RS-P-1B Was Inoperable for 3-h.Caused by Stuck Linkage Arm.Linkage Pivot Points Oiled + (ML19345E184)
- 05000339/LER-1980-095, Forwards LER 80-095/03L-0 + (ML19345E186)
- ML19345E187 + (ML19345E187)