Proposed App a Tech Specs Tables 3.3-12 & 3.7-5,re Fire Detection Instrumentation & Sprinkler Sys,Respectively
ML19345E138
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/04/1980
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19345E137 List:
References
NUDOCS 8012230312
Download: ML19345E138 (9)


Text

0 6

O e

ENCLOSURE 1 TABLE 3.3-12 FIRE DETECTION INSTRUMENTATION

~-

(~ _

l l

80122so3\k

TABLE 3.3-12 '

FIRE DETECTIOBi INSTRUMENTATI0fl Auxiliary Building Total Minimum #

Smoke of Operable Room Description Elevation Detectors Smoke Detectors 2128 RHR Heat Exchanger Room 83'-0" 10 5 2129 RHR Low Head Pump Room 77'-0" 1 1 2131 RHR Low Head Pump Room 77'-0" l 1 ,

2160 Hatch Area 100'-0" 2 1 2161 South Corridor 100'-0" 2 1 2172 Hallway 100'-0" 3 2 2173 Charging / Safety Injection Pump Room 100'-0" 2 1 2174 Charging / Safety Injection Pump Room 100'-0" 2 1 2175 Hallway 100'-0" 2 1 2181 Charging / Safety Injection Pump Room 100'-0" 2 1 2184 Mcchanical Penetration Room 100'-0" 8 4 2185 CCW Heat Exchanger and Pump Room 100'-0" 13 7-2186 Boric Acid Trans. PPS 100'-0" 3 2 2188 Boric Acid Tanks 121'-0" 2 1 2190 MCC Panel Room 100'-0" 4 2 2191 Auxiliary Feeswater Pump Room 100'-0" 1 1 2192 Auxiliary Feedwater Pump Room 100'-0" 2 1 2193 Auxiliary Feedwater Pump Room 100'-0" l 1 2202 Hot Shdtdown Panel Room 121'-0" 4 2 2208 Corridor 121'-0" 2 1 2209 Hallway 121'-0" 3 2 TABLE 3.3-12 FIRE DETECTION INSTRUMENTATION (cont'd)

Auxiliary Building (cont'd)

~

Total Minimum #

Smoke of Operable Room Description Elevation Detectors Smoke Detectors l

2210 South Corridor 1 21'-0" 2 1 2212 Battery Room 1A 121'-0" 1 1 2213 Battery Service Room 1 21'-0" 1 1 2214 Battery Room 1B 121'-0" 1 1 2223 Mechanical Penetration Room 121'-0" 9 5 2224 DC Switchgear Room 121'-0" l 1 2226 DC Switchgear Room , 121'-0" l 1

"~ 128'-0" 7 4 2227 West Cable Chase t

2229 AC Switchgear Room Train B 1 21'-0" 4 2 l

2233 AC Switchgear Room Train B 1 21 '-0" 3 2 i

j 2241 Main Steam and Feedwater Valve Room 127'-0" 8 4 l

2244 Mezzanine 131 ' -O',' 2 1

~

2245 Mezzanine 1 31'-0" 2 1 l 2254 Hot Shutdown Panel Room 121'-0" l 1 1

2300 West Cable Chase 139'-0" 7 4 l 2309 Hatch Area 139'-0" l 1 2312 Corridor 139'-0" 4 2 2316 Corridor 139'-0" 2 1 2318 Cable Spreading Room 139'-0" 8 4 2319 West Corridor 139'-0" 2 1 l

TABLE 3.3-12 FIRE DETECTION INSTRUMENTATION (cont'd)

Auxiliary Building (cont'd)

Total Minimum #

Smoke of Operable Room Description Elevation Detectors Smoke Detectors 2333 Electrical Penetration Room 139'-0" l 1 2334 Electrical Penett tion Room 139'-0" 3 2 2335 AC Switchgear Room Train A 139'-0" 3 2 2343 AC Switchgear Room Train A 139'-0" 3 2 2347 . Electrical Penetration Room 139'-0" 2 1 2401 Control Room 155'-0" 4 2 2452 Storage Area 155'-0" 7 4 2462 Non-Radioactive Vent Equipment Room 155'-0" 5 3 2466 West Cable Chase 155'-0" 7 4 l

2471 Control Room (Instrument Racks) 155'-0" 12 6 2500 West Cable Chase 168'-2" 7 4 Total Minimum #

Smoke of Operable Fire Zone - Description Elevation Detectors ~ Smoke Detectors *

~

Containment l

55 Containment Coolers 155'-0" 12/ Fan 6/ Fan 55 Containment 155'-0" 14 7

  • The Fire Detection instruments located within the Containment are not required to be OPERABLE during the performance of Type A Containment Leakage Rate Tests.

__ . - ._ . : . ~ _ .. - -

TABLE 3.3-12 FIRE DETECTION INSTRUMENTATION (cont'd)

Total Minimum #

Smoke of Operable Fire Zone Description Elevation Detectors Smoke Detectors Service Water Intake Structure 72 A Pump Room Area 188'-9" 12 6 72 A Strainer Bay 167'-0" 12 6 72 B Switchgear Room - Train B 188'-9" 2 1 72 C Foyer - Train B 188'-9" 1 1 72 D Foyer - Train A 188'-9" 1 1 72 E Switchgear Rocm - Train A 188'-9" 2 1 73 Battery Room - Train B 188'-9" 1 1 74 Battery Room - Train A 188'-9" l 1 i

l Diesel Generator Building f 56 A Switchgear Room - Train A 155'-0" 12 6 i

56 B Foyer 155'-0" 4 2  ;

56 C Switchgear Room - Train B 155'-0" 12 6 3 71 Hallway 155'-0" 9 5 i 0

Total Minimum #

Heat of Operable Fire Zone Description Elevation Detectors Heat Detectors l Diesel Generator Building (Heat Detectors) 57 Diesel Driven Generator 2C 155'-0" 5 3  !

58 Diesel Driven Generator 1B 155'-0" 5 3 o

o

TABLE 3.3-12 FIRE DETECTION INSTRUMENTATION (cont'd)

. Total Minimum #

Heat of Operable Fire Zone Description Elevation Detectors Heat Detectors DieselGeneratorBuilding(HeatDetectors)(cont'd.)

~~

59 Diesel Driven Generator 2B 155'-0" 5 3 60 Diesel Driven Generator 1C 155'-0" 5 3 61 Diesel Driven Generator 1-2A 155'-0" 5 3 .

62 Day Tank Room 155'-0" 1 1 63 Day Tank Room 156'-0" 1 1 64 Day Tank Room 155'-0" 1 1 65 Day Tank Room 155'-0" 1 1 66 Day Tank Room ,

155'-0" 1 1 Y

l-i l -

l I

  • S S

O ENCLOSURE 2 TABLE 3.7-5 LIST OF SPRINKLER SYSTEMS m

e-

TABLE 3.7-5 LIST OF SPRINKLER SYSTEMS Location Sprinkler (Room No.) Description Elevation System 2160 Hatch Area 100'-0" 2A-25 2161 South Corridor 100'-0" 2A-25 2172 Hallway 100'-0" 2A-101 2175 Hallway 100'-0" 2A-118

^

2185 CCW Heat Exchanger and Pump Roca 100'-0" 2A-27 2190 MCC Panel Room 100'-0" 2A-62 2209 Hallway 121'-0" 2A-35 2210 South Corridor 121'-0" 2A-36 l 2223 Mechanical Penetration Room 1 21'-0" 2A-45 2227 West Cable Chase 128'-0" 2A-23 2244 Mezzanine 1 31'-0" 2A-36 2245 Mezzanine 1 31'-0" 2A-36 2300 West Cable Chase 139'-0" 2A-23 2312 Corridor 139'-0" 2A-48 2316 Corridor 139'-0" 2A-48 2318 Cable Spreading Room 139'-0" 2A-43 2319 West Corridor 139'-0" 2A-59 2452 Clean Storage Area 155'-0" 2A-108 2462 Non-Radioactive Vent Equipment 155'-0" 2A-51 Room 2466 West Cable Chase 155'-0" 2A-23 2500 West Cable Ch:5e 168'-2" 2A-23 FARLEY-UNIT 2 3/4 7-57 v-., - - - - - , - ,

n- y , , , , , - , + m-, < , . x , -, w--- g -~r-- ene-