ML19345E160

From kanterella
Jump to navigation Jump to search
Forwards LER 79-017/03L-1
Date released: 12/25/2019 Download: ML19345E160


LER 79-017/03L-1:on 790515,during Performance of Overspeed Testing,Diesel Generator 12 Auxiliary Blower Failed.Returned to Svc 790523.Cause of Failure Due to Thermal Growth & Subsequent Contact Between Lobes & Power Housing
ML19345E162
Person / Time
Site: Calvert Cliffs 
Issue date: 06/21/1979
From: Lagiewski J, Umsted J
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19345E162 (1)
Forwards LER 79-017/03L-1
ML19345E159
Person / Time
Site: Calvert Cliffs 
Issue date: 12/19/1980
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19345E159 (1)