Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19338C873 + (ML19338C873)
- ML19338C875 + (ML19338C875)
- ML19338C879 + (ML19338C879)
- ML19338C880 + (ML19338C880)
- ML19338C882 + (ML19338C882)
- ML19338C884 + (ML19338C884)
- ML19338C885 + (ML19338C885)
- ML19338C886 + (ML19338C886)
- ML19338C888 + (ML19338C888)
- ML19338C889 + (ML19338C889)
- ML19338C890 + (ML19338C890)
- ML19338C891 + (ML19338C891)
- ML19338C892 + (ML19338C892)
- ML19338C894 + (ML19338C894)
- ML19338C895 + (ML19338C895)
- IR 05000332/1980002 + (ML19338C897)
- AECM-80-199, Second Interim Deficiency Rept Re Incorrect Pipe Supplied by Tx Pipe Bending.Heavier Wall of Spool Will Not Cause Overstressed Condition on Pipe Support Sys in Application. Final Rept Expected by 801010 + (ML19338C900)
- ML19338C901 + (ML19338C901)
- ML19338C903 + (ML19338C903)
- ML19338C904 + (ML19338C904)
- ML19338C906 + (ML19338C906)
- ML19338C907 + (ML19338C907)
- ML19338C908 + (ML19338C908)
- ML19338C909 + (ML19338C909)
- ML19338C910 + (ML19338C910)
- ML19338C911 + (ML19338C911)
- ML19338C912 + (ML19338C912)
- 05000327/LER-1980-138, Forwards LER 80-138/03L-0 + (ML19338C913)
- ML19338C914 + (ML19338C914)
- 05000327/LER-1980-138-03, /03L-0:on 800801,during Heavy Thunderstorm,Cooling Tower Blowdown Line Effluent Monitor Declared Inoperable. Caused by Nearby Lightning Strike or Power Line Surge. Damaged Parts Being Repaired & Backup Channel Installed + (ML19338C915)
- 05000327/LER-1980-142, Forwards LER 80-142/03L-0 + (ML19338C916)
- ML19338C917 + (ML19338C917)
- 05000327/LER-1980-142-03, /03L-0:on 800718,during Testing W/Unit in Mode 3, Ice Bed Temp Exceeded Tech Spec Limit of 27 F.Caused by Insufficient Recovery Time Between Personnel Entries & Exits.Work Halted & Temp Reduced to 27 F,19.5-h Later + (ML19338C918)
- ML19338C919 + (ML19338C919)
- 05000327/LER-1980-140, Forwards LER 80-140/03L-0 + (ML19338C920)
- ML19338C921 + (ML19338C921)
- AECM-80-198, Interim Deficiency Rept Re Fractured Actuator to Damper Shaft Couplings in Diesel Generator Bldg Bay A.Final Evaluation to Be Completed by 801219 + (ML19338C922)
- 05000327/LER-1980-140-03, /03L-0:on 800809,during Preoperational Test,Diesel Generator 86LOR Relay Coils Burned Out Following Blackout Initiation.Caused by 86LOR Relay Being Reset Before Blackout Relays.Coils Replaced & Relays Reset + (ML19338C923)
- 05000327/LER-1980-129, Forwards LER 80-129/03L-0 + (ML19338C925)
- ML19338C926 + (ML19338C926)
- ML19338C927 + (ML19338C927)
- 05000327/LER-1980-129-03, /03L-0:on 800808,while Operating in Mode 2 at 3.5% Power,Diesel Generator 1A-A Failed to Start During Simulated Loss of Power to 2A-A 6.9-kV Shutdown Board.Caused by 43T (L) Switch Being Left in Test Position from Previous T + (ML19338C929)
- 05000306/LER-1980-022, Forwards LER 80-022/03L-0 + (ML19338C931)
- ML19338C932 + (ML19338C932)
- 05000265/LER-1980-016, Forwards LER 80-016/03L-0 + (ML19338C933)
- ML19338C934 + (ML19338C934)
- 05000306/LER-1980-022-03, /03L-0:on 800805,during Surveillance test,fan-coil Unit Dome Damper 23 Could Not Be Positioned Properly.Caused by Leaking Air Supply Line to Damper Actuator.Air Supply Line Replaced + (ML19338C935)
- ML19338C939 + (ML19338C939)
- ML19338C941 + (ML19338C941)
- 05000265/LER-1980-016-03, /03L-0:on 800723,discovered That Pressure Switch PS-2-261-30C Would Trip at 841 Psig,Under Limit of 850 Psig. Caused by Instrument Drift.Pressure Switch Recalibr & Tested Satisfactorily + (ML19338C942)