ML19338C906

From kanterella
Jump to navigation Jump to search
November 15th Public Meeting Summary Smarter Inspection Licensing
ML19338C906
Person / Time
Issue date: 01/06/2020
From: Jonathan Marcano
NRC/NMSS/DFM/MSB
To: Margie Kotzalas
NRC/NMSS/DFM/IOB
Marcano J
Shared Package
ML19338C823 List:
References
Download: ML19338C906 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 6, 2020 MEMORANDUM TO: Margaret A. Kotzalas, Chief Inspection and Oversight Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards FROM:

Jonathan Marcano, Engineer

/RA/

Materials and Structural Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards

SUBJECT:

SUMMARY

OF NOVEMBER 15, 2019, MEETING TO CONTINUE DISCUSSIONS ON PROPOSALS FOR BUILDING SMARTER FUEL CYCLE INSPECTION AND LICENSING PROGRAMS On November 15, 2019, a Category 3 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), representatives of the Nuclear Energy Institute (NEI) and members of the public at the NRC Headquarters office. The purpose of the meeting was to continue dialogue and idea sharing between NRC staff, members of NEI, and the public in support of the NRCs charters for the Working Group on Building a Smarter Fuel Cycle Inspection Program (Agencywide Documents Access and Management System [ADAMS]

Accession Number ML19074A139) and the Working Group on Building a Smarter Fuel Cycle Licensing Program (ADAMS Accession No. ML19115A011). The meeting notice and agenda are available in ADAMS at Accession No. ML19318G284. Presentation materials from the meeting are available in ADAMS at Accession Nos. ML19318F612, ML19318F609, ML19318F610 and ML19312A886.

The NRC staff discussed the concepts under consideration to enhance the fuel cycle inspection program and engaged with members of NEI and the public to solicit feedback.

CONTACT: Jonathan Marcano, NMSS/DFM 301-415-6731

M. Kotzalas 2

Representatives from NEI further discussed suggested changes to Inspection Manual Chapter 2600, Fuel Cycle Facility Operational Safety and Safeguards Inspection Program, Appendix B, NRC Core Inspection Requirements.

provides NRC staff notes of the discussion.

A list of attendees is provided as Enclosure 2.

Enclosures:

1. NRC Staff Notes of November 15, 2019 Public Meeting
2. List of Attendees cc:

Hillary Lane Senior Project Manager Radiation and Material Safety Nuclear Energy Institute Janet Schlueter Senior Director Radiation and Material Safety Nuclear Energy Institute

M. Kotzalas 3

SUBJECT:

SUMMARY

OF NOVEMBER 14, 2019, MEETING TO CONTINUE DISCUSSIONS ON PROPOSALS FOR BUILDING SMARTER FUEL CYCLE INSPECTION AND LICENSING PROGRAMS DATED: January 6, 2020 DISTRIBUTION:

FCSE r/f ADAMS Accession Numbers.: ML19338C823 (P), ML19338C906 (M)

OFFICE DFM/MSB/PM DFM/FFLB/LA DFM/IOB/BC DFM/MSB/PM NAME JMarcano ELee MKotzalas JMarcano DATE 11/20/2019 12/30/2019 12/9/2019 01/06/2020 OFFICIAL RECORD COPY