Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19325F176 + (ML19325F176)
- ML19325F177 + (ML19325F177)
- 05000321/LER-1989-015-02, :on 891009,diesel Generator 1R43-S001B Failed to Start Manually During Monthly Generator Test.Caused by Personnel Error & Incorrect Model Number Assigned to Pump. Pump Replaced & Oil Drained from Cylinders + (ML19325F178)
- 05000277/LER-1989-025-01, :on 891007,determined That nonsafety-related Bellows Leak Detecting Pressure Switches Installed on Main Steam Relief Valves Could Prevent Opening During Design Basis Condition.Plant Alteration Installed + (ML19325F179)
- 05000277/LER-1989-024-01, :on 891006,reactor Protection Sys Initiated Full Reactor Scram Signal.Caused by Output Signal for LPRM 40-33A Spiking High.Lprm Detector Placed in Bypass Position & Scram Signal Reset + (ML19325F180)
- 05000277/LER-1989-022-01, :on 891003,unterminated Lead in Circuit to HPCI Trip Solenoid Rendered HPCI Stop Valve Trip Functions Inoperable.Caused by Leads Loosely Hanging Inside Door Panel.Hanging Leads Secured & Panel Inspected + (ML19325F181)
- 05000334/LER-1989-012-01, :on 891010,in-core Instrumentation Guide Thimble Tubes Identified W/Degradation in Excess of 60% Wall Thickness.Caused by Mechanical Wear of Thimbles Against Reactor Vessel Internals.Tubes Isolated + (ML19325F182)
- ML19325F183 + (ML19325F183)
- 05000353/LER-1989-009-02, :on 890820,28,0904,10,1021 & 25,preplanned RCIC Sys Actuation Cycles Occurred During Startup Test Program. Tests Completed Satisfactorily During Test Conditions 1 & 2 + (ML19325F184)
- ML19325F185 + (ML19325F185)
- ML19325F186 + (ML19325F186)
- ML19325F187 + (ML19325F187)
- ML19325F188 + (ML19325F188)
- ML19325F189 + (ML19325F189)
- ML19325F191 + (ML19325F191)
- ML19325F192 + (ML19325F192)
- ML19325F193 + (ML19325F193)
- ML19325F197 + (ML19325F197)
- ML19325F198 + (ML19325F198)
- PLA-3292, Responds to Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs. Util Has Developed & Issued Procedure Which Includes Safeguards Contingency Planning Using Approach Noted in Generic Ltr + (ML19325F199)
- ML19325F200 + (ML19325F200)
- ML19325F202 + (ML19325F202)
- ML19325F203 + (ML19325F203)
- ML19325F204 + (ML19325F204)
- ML19325F205 + (ML19325F205)
- ML19325F206 + (ML19325F206)
- ML19325F207 + (ML19325F207)
- U-601554, Submits Response to NRC Bulletin 88-010,Suppl 1, Nonconforming Molded-Case Circuit Breakers. Original Response Provided Did Not Satisfy Bulletin Provisions Changed by NRC Position 7 in Suppl 1 + (ML19325F209)
- ML19325F210 + (ML19325F210)
- ML19325F211 + (ML19325F211)
- RBG-31731, Corrected Supplemental Response to Violations Noted in Insp Rept 50-458/89-24.Corrective Action:Operations Personnel Secured Standby Water Svc Sys to Isolate Leak + (ML19325F212)
- ML19325F213 + (ML19325F213)
- ML19325F214 + (ML19325F214)
- ML19325F215 + (ML19325F215)
- ML19325F216 + (ML19325F216)
- 3F1189-06, Responds to Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs. Util Has Taken Necessary Actions & Modified Safeguards Contingency Plan + (ML19325F217)
- ML19325F218 + (ML19325F218)
- ML19325F220 + (ML19325F220)
- ML19325F221 + (ML19325F221)
- ML19325F222 + (ML19325F222)
- ML19325F225 + (ML19325F225)
- ML19325F226 + (ML19325F226)
- BSEP-89-1000, Monthly Operating Repts for Oct 1989 for Brunswick Steam Electric Plant Units 1 & 2 + (ML19325F228)
- ML19325F229 + (ML19325F229)
- ML19325F230 + (ML19325F230)
- ML19325F231 + (ML19325F231)
- ML19325F236 + (ML19325F236)
- ML19325F237 + (ML19325F237)
- ML19325F239 + (ML19325F239)
- ML19325F240 + (ML19325F240)
- IR 05000321/1989026 + (ML19325F241)