Telephone (4 th 393 6000 Nuclear Group' j
P.O (ton 4 Sheppmpsx>rt PA 15017 0004 i
Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412,. License No. NPF-73 Monthlv Ocaratim Reoort t
.f U. S. Nuclear Regulatory Comnission W M Control Desk Washington, D.C.-
20555 Gentlemen:
In accordance with Appendix A,
Technical Specifications, the Monthly Operating Report,is submitted for Unit 1 arri Unit 2 for the Inonth of Oc e*wr, r
I
[
1989.
l l
l' 1
1 1:
j.
Very tntly yours, 1
1
.h, J. D. Sieber Vice President Nuclear Group MW/ln3 Enclosures oc: NRC Regional Office King of Pntssia, PA NN I
6911170044 691031
{DR ADOCK 05000334
,f I
PDC i
b OPERATING DATA REPORT DOCKET NO.:
50 334 REPORT DATE:
11/06/89 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393-7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: OCTOBER 1989
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Not MWe):
835
- 6. MAX. DEFENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Not MWe):
810
- 8. IF CHANGES CCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
.10. REASONS FOR RESTRICTIONS, IF ANY:
N/A I
THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
745.0 7296.0 118368.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
0.0 5738.8 71989.7
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
0.0 5722.3 70366.3
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
0.0 12651193.0 165997551.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
0.0 4053450.0 53246789.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
-2530.0 3785000.0 49693390.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 78.4 61.7
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 78.4 61.7
- 22. UNIT CAPACITY FACTOR (DER): PCT 0.0 62.1 53.2
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 2.2 17.1 i
1
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
l
)
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOV. 2 5.1989
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FCRECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A l
COMMERCIAL OPERATION N/A N/A A
t NARRATIVE SLN4MW OF PolGHLY OPERATING EXPERIDEE
{
INIT I OCIOBER 1989 October 1
'Ihe Unit runnined in Mcde 6 for it's Seventh Refuelirg thrurA outage.
October 22 October 23 At 1620 hours0.0188 days <br />0.45 hours <br />0.00268 weeks <br />6.1641e-4 months <br /> the Unit entatigd Mode 5.
October 24
'Ihe Unit remained in Mode 5.
through October 31 r
i k
i o
(
1.'
1 1
1 s
c.
i' 1
AVI!3%GE DhIIX M POWER IEVEL
.l Docket No.
50-334
'i Unit BVPS Unit 1 I
Date NcNamhar 6. 1989 Otmpleted by M.A. Mimar
'14tlephone (412) 393-7621 MNIE Odnhar 1989 DAY AVERAGE DAILV IVWER IEVEL LWY AVERAGE EAILY POWER IEVEL (PWe-Net)
(IWe-Net) 1 0
17 0
'~
2 0
18 0
3 0-19 0
4 0
20 0
I 5
0 21 0
-6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
1 13 0
29 0
l 14 0
30 0
i 15 0
31 0
.16 0
INS'IRDCTIONS On this format, list the average daily unit power level in IWe-Net for each day in the reporting month. Campute to the nearest whole megawatt.
-,-n_
LMIIT SNUTDOWuS AND POWE2' REDUCTI0ms Docket No.
50-334 ~
Unit some svPS tenit #1 Date moveasser 6. 1989 Completed By M.A. Winner REPOR) MouTN _0CTOBER 1989 Telephone M12) 393-7621 Method of Licensee I
Cause & Corrective Duration shutting Event System Component Action to No.
Date Typel (Nours)
Reason 2 Down Reactor 3 Report 8 Code 4 Code 5 Prevent Recurrence 36 891001 S
745 C
4 m/A RC FUELMM The Unit reesir.ed etwedoun the sonth 1
of October for it's Seventh Refueting outege.
9 1
i 1
2 3
4 F-Ferced Reason:
Method-Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Emplain) 1-Menuet Preperation of Data Entry Sheets B-Maintenance or Test 2-Menuet Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Scram (WUREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Enem 5-Reouction 5
l F-Administrative 9-Other Exhibit 1-Same Source.
G-Operational Error (Emplain)
H-Other (Emptain) 1
_ - ~.
~,.
- -- -- - - = -
i NMIRATIVE SL309JW OF i
IctmUX OPERATING EXPERIDKE j
i UNIT II OC'!OBER 1989 october 1
'Ihe Unit operated at a rminal value of 100% output.
through October 31 t
L l
4 b
4 I
r
(
l l
1' l
l
~ ~ ^
i OPERATING DATA REPORT DOCKET NO :
50 412 REPORT DATE:
11/06/89 COMPLETED BY: M.A. WINCER TELEPHONE:
(412) 393 7621 s
OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: OCTOBER 1989
- 3. LICENSED THERMAL POWER (MWt)*
"660
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Not MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
885
- 7. MAX. LEPENDABLE CAPACITY (Net MWe):
833
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
~
i
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A i
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
745.0 7296.0 17151,0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
745.0 4843.5 14092.8
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
745.0 4783.6 13962.9
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1966839.0 11368208.0 35099148.4
- 17. GROSS ELECT, ENERGY GEN. (MWH):
635400.0 3625400.0 11255200.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
603484.0 3392511.0 10607676.0 l
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 65.6 81.4 i
- 20. UNIT AVAI1 ABILITY FACTOR:(PERCENT) 100.0 65.6 81.4
- 22. UNIT CAPACITY FACTOR (DER): PCT 96.9 55.6 74.0
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 14.0 7.3
- 24. SHUTD0WNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
l
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
l
-~ '
1 y-r d
UNIT SNUTDOWNS AND POWER REDUCTIONS Do.ket so.
50-412^
~
Unit meme avPs Unit 82 Date :__ "
- 6. 1999 Compteted By M. A. M' neer REPORT MORTH OCTOSER 1989 Telephone E )
93-7621 Nethod of Licensee Cause & Corrective Duretion Shutting Event System Component Action to-me.
Date Typel (sours)
Eeeson2 poun Reector3 Report 8 Code 4 Code 5 Prevent Recurrence NC3E 1
2 3
4 F-Forced Reason:
Method:
Exhibit G-Instructions for S-Scheduled A-Equipment Feiture (Emplain) 1-Me9uel Properation of Data Entry Sheets B-Maintenance or Test 2-Manuel Scree for Licensee Event Report (LER) File C-Refueting 3-Automatic Scres (EUREG0161).
0-Regulatory Restriction 4-Cont'd. from Previous month E-operator Training & License Exam 5-Reduction 5
F-Administrat ive 9-Other Exhibit I-Same source.
G-operational Error (Emptein)
M-Other (Emptein) v w
-- d-
-.9' 2-
- - - - - - - - + - * " - '
l
'i
- 3.,-
1 4
7 AVERAGE DAILY (MIT PWER IEVEL Docket No.
50-412 Unit BVPS Unit 2 Date Nov==h=" 6. 1989 Otmpleted by M. A. Winaar Telephone (412)393-7621 PENIH Octnhar 1989 l
DhY '
AVERAGE DAILY POWER IEVEL DAY AVERAGE DAILY POWER 1EVEL
( M t)
(PWe-Net) 1 803 17 807 2
803 18 821 3
807 19 817 4
815 20 817 5
811 21 817
(
6 807 22 813 r
7 811 23 817 8
819 24 815 9
807 25 807 10 815 26 808 11 815 27 813 12 807 28 808 l
13 803 29 809 i
i 1
14 798_
30 807 15 803 31 811 16 802 l
l-1-
INS'IBUCTIONS On this format, list the average daily unit power level in PWe-Net for each day in the reporting month. Canpute to the nearest whole megawatt.