Text
. -
Si, a.c 4 ' [ir o
~ U.JITED STATES q
g
- l, a j 3m g
NUCLEAR REGULATORY COMMISSION
- t WASHINGTON D. C. 20555
\\*i++*f ic November 9, 1989 i
g. '
D
, Docket Nos. 50-348 and 50-364 L
T Nr. W. G.-Hairston, III-L Senior Vice President Alabama Power Company 40 Inverness Center Parkway Post Office Box 1295 F
Birmingham, Alabama 35201 s
Dear Mr. Hairston:
SUBJECT:
' 0FFSITE DOSE CALCULATION MANUAL, REVISION 7, FOR JOSEPH H. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS 68019 AND 6820) la the early 1980s, you. submitted several revisions to the Joseph H. Farley Nuciear Power Plant (Farley) Offsite Dose Calculation Manual (0DCH).
These revisions were reviewed by'the NRC staff and coments were transmitted informally back to your staff. Subsequent revisions were submitted to the NRC with the Farley monthly report in accordance with Technical Specifications.
It appears, however, that a formal letter of acceptance of the ODCM was never issued.
By your letter of April 13, 1989, you provided Revision 7 to the Farley ODCH.
This Revision 7' has been reviewed by our contractor, EG&G Idaho, Inc.
Their discussion and comments are contained in Technical Evaluation Report (TER)
(EGG-PHY-8674) which is enclosed for your use.
We note that Revision 7 of the ODCM has an improved format and organization so that required subjects can be easily located.
Revision 7 appears to be consistent with NRC guidelines. However Section 4 of the TER identifies a number of discrepancies and suggested improvements, some typographical in nature and others' of a technical nature. We feel these concerns should be addressea by your staff.
l t
Immediate action is not required since the concerns involve refinements to a basically sound document. However, since the ODCM is a supplementary document I
for implement 1 rig ~ the Radiological Effluent Technical Specification requirements of 10 CFR Part 50, Appendix I, we request that these items be addressed in a future revision to the ODCM within six months from the receipt of this letter.
We note that the recent Revision 8 does not affect the concerns of the TER.
If this date poses a problem, please advise me of your proposed schedule.
OFo(
$1188880 She*
P
_1 G;r; l
Y
{
(
i
, :1 4
7'q 1
Mr.' W. G. Hairston,.III -
s t
V 3 c
f 5
e l:
.The. reporting and/or recordkeeping requirements of this letter affect fewer K
than ten respondents;;therefore, OMB clearance is not require?under.P.L..96-511'--
Sincerely, I(
' ' L
,(a
+
s
'! V( -
_g
,A
^
[3
(!/
3 t Edward A. Reevei, Senior Project Manager n' c 1
Project Directorate:11-19
..n.'
'4' Division *of Reactor Projects - I/II7 Office of Nuclear Reactor. Regulation' x 4
t Y
1 s
Enclosures:
As stated.
p
'l P
I L
P L
. t 9
7 9
l'
'l n.
L OFC.tLA:
R PM:PD R :PD RPR :
NAME :PA ERe EA sam L....:--. --..--.:---- - --.0b..--.......:.....-------:-- -....--- :.--.---.----:...------
DATE>:11/[/89 11/
/89 j11/f/89 l
OFFICIAL RECORD COPY t
t Document:Name:: HR. W. G. HAIRSTON, III r.
p, I
- l. 2
"~
Mr..W. G. Hairston, 111 Alabama Power Company Joseph M. Farley Nuclear Plant CC:
i Mr. R. P. Mcdonald Resicent Inspector i.
Executive Vice President U.S. Nuclear R(gulatory Comission i
Nuclear Operations P. O. Box 24 - Route 2 j
Alabama Power Company Columbia, Alabama 36319 P. O. Box 1295 r
Birmingham, Alabama 35201 Regional Administrator, Region !!
[
U.S. Nuclear Regulatory Comission fir. B. L. Moore 101 Marietta Street, Suite 2900 l
Manager, Licensing Atlanta, Georgia 30323
' Alabama Power Company P. O. Box 1295 Chairman Birmingham, Alabama 35201 Houston County Comission Dothan, Alabama 36301 Mr. Louis B. Long, General fianager Southern Company Services, Inc.
Clauce Earl Fox, M.D.
Houston County Commission State Health Officer P. O. Box 2625 State Department of Puolic 8talth Birmingham, Alabama 35202 State Office Builoing ilontgomergy, Alabama 36130 Mr. D. N. florey General Manager - Farley Nuclear Plant P..O. Box 470 Ashford, Alabama 36312 Mr. J. D. Woodward Vice-President - Nuclear farley Project Alabama Power Company P. O. Box 1295 Birminghem, Alabama 3b201
\\
NN
m,y p j-O S [.
"',l j d.
- l,
((
.u-y,
...' g %,,
J a
f'.'
)ISTRIBUTION:
(withoutenclosures)-
b Wl 4
' Local PDR.
1 S. Varga-14-E-4' G. Lainas. H-3'
+
c E. Adensam 14-B-20
.P. Anderson 14-B E. Reeves.
, 14-B-20.w/ 2 enclosures.
, OGC (For inform. Only) 15-B-18 E. Jordan-HNBB-3302
'B. Grimes.
'9-A-2
~ACRS (10)gham L.'Cunnin 11-D '
P-315 i
r Plant File L>
k
+
A 1
I g'
'l l
lh,,
.1
.s 3,
- i.'
,f' l
1 9-L o
%L J 4
v 5
A^i
.s I tv y'
0
,, V ff f^j '
i' I
N e' '
' t
\\'
- 3 g'
+
- v.,.
I
?
4 d
,f,
- ,. j r.t 1, f.
- =
s-r 1
)
c
')
[-
r l_
s l
i 1
a 1
I l3
- 4 :
l
. \\
l l
)
i r
h I.
i l
i t.
.2