g -
's OPERATIONS NARRATIVE Cooper Nuclear Station October 1989 No scheduled or unscheduled shutdowns, or other significant power reductions were experienced during the month of October. A capacity factor of 96.7% was achieved for the month.
r f
1 O pg PDC
C~
OPERATING DATA REPORT e
l DOCKET NO.
050 0298 L *'
DATE November 9, 1989 I
'+
COMPLETED BY K. J. Wiethern I
[
TELEPHONE (402) 825-3811 l
i OPERATING STATUS 1.
Unit Names Cooper Nuclear Statton Notes 2.
Reporting Periods Oct ober 1989 3.
Licensed Thermal Power (MWt):
23R1 4
Nameplate Reting (Cross HWe):
836 5.
Design E!*ctrical Rating (Net HWe): 778 6.
Maximum Dependable Capacity (Cross MWe):
787 r
7 MaxisrJe Dependable Capacity (Net MWe):
764 8.
If Changes Occur in Capacity ratings (Items Numt>ef 3 Through 7) Since Last Report, Cive Reasons l
9.
Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restriction, If Any l
i k
This Month Yr.*to Date Cumulative
- 11. Ilours In Reporting Period 745.0 7,296.0 134,449.0
- 12. Number of Ilours Reactor Was Critical 745.0 5,334.1 101,309.4
- 13. Reactor Reserve Shutdown lleurs 0.0 0.0 0.0 14 Hours Generator On Line 745.0 5,272.0 99,706.6
- 15. Unit Reserve Shutdown llours 0.0 0.0 0.0
- 16. Cross Thermal Energy Generated (HWH) 1.69'4.912.0 11,B83.76B.0 199.614.492.0
- 17. Cross Electrical Energy Generated (MWH) 566.495.0 3,928,265.0 64,321,086.0
- 18. Net Electrical Energy Cenerated (MWHi 550.123.0 3.805.'l50.0 62,034,384.0
- 19. Unit Service Factor 100.0 72.3 74.2 r
- 20. Unit Availability Factor 100.0 72.3 74.2
- 21. Unit Capacity Factor (Usir.g MDC Net) 96.7 68.3 60.4
- 22. Unit Capacity Factor (Uning DER Net) 94.9 67.0 59d
- 23. Unit Forced Outage Rate O.0 5.8 4.7 24 Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling and Maintenance Outage 13, scheduled March 4, 19901 8 week duration.
- 25. If Shut Down At End of Report Feriod, Estimated Date of Startup
- 26. Units In Test Status (Frior to Commercial Operation):
Forecast' Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OFERATION
AVERAGE DAILY UNIT POWER LEVEL DOEXET NO.
050 0298 UNIT CNS DATE November 9, 1989 COMPLETED BY K 1, Wietharn TELEPHONE (402) 825-3811 MONTH October 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 372 17 773 2
64s 18 771 3
644 19 770 4
oss 20 772 5
627 21 773 6
762 22 766 7
771 23 774 8
763 24 773 9
772 25 773 10 771 26 773 11 771 27 771 12 756 28 vso 13 738 29 769 14 770 30 770 t
15 761 31 767 16 771
+
i INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt,
p.
~
~
n
~
' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO..-
-0$0-0296 UNIT MAME Cooper itecieer 5tation DATE
. Evember 9, 1989-COMPLETED BY K. J. Niethern REPORT MONTH October 1989 TELEPNONE
~(402) 525-3811 i
Method of Licensee Cseee & Cor W ive.
4 3
Duration Shutting Event System Component Action to ?--
3 1
2 Mo.
Date Type (Hours)
Reason Down Reactor Report
- Code Code havt De NGiiE THIS NONTH 4
1 T: Terced 2 Reason:
3 Method:
& Exhibit G - Instructions for S: Scheduled A - Equipment Tallure (Explain) 1 - Manual Prepetstion of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets for 1.icensee Event C - Refueling 3 - Automatic Scram Report (GR) Tile (NmtEG-01f,1)
D - Regulatory Restriction 4 - Continued E - Operator Training & License Exmeinstion 5 - Reduced Lead 5 Exhibit 1 - Same Secree F - Administrative 6 - Other G - Operational Error (Explain)
H - Other (Explain) a-_, _ _
m
.a2-mm-
,,,.e_.-m.-em
..mmm
.m--
-v. n m
. ---m
__mm.,, -, -, _ _ _ =
e
-~.
m e