Text

[*'

i, t

g Portland General Electric Company Trojan Nuclear Plant 717(41 Columbia River liwy

'l Rainier. Oregon 97048 (Z3) 5543713 November 6, 1989 CPY.292 89 r

US Nuclear Regulatory Commission r

Document Control Desk l

L Washington, DC 20555 f

l Gentlemen:

l Monthly Operatinn Report In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the Monthly Operating Data Report is submitted for October, 1989.

Sincerely,

[

(

C. P. Yundt General Manager i

(

-CPY:sp

{

Attachment c:

Mr. John B. Martin l

Regional Administrator, Region V

.j US Nuclear Regulatory Commission Mr. David Stewart Smith Department of Energy State of Oregon i

Resident Inspector MOR Distribution

$"lME$$$k7 f

i R

i

, u.

b:

s TROJAN NUCLEAR PLANT I

L

'Irojan Operating Report 6

.O,..

October 1989

[

e e

OPERATIONS-I

(

The plant b'egan the~ month in Mode 5, finishing the work for a scheduled outago and rr.uing preparations for the Plant restart.

On October 1**, the Overtemperature Delta Temperature (OT6T) setpoints were changed to reflect a new understanding of required temperatures.

This l.

information resulted from the investigation into rccent problems with the OTAT H

prPion of the protection system.

j The hearup from the outege was commenced on October 1**.

Tho startup was 6-halted when a Pressurizer Safety Valve (PSV 8010B) began experiencing leakage.

Troubleshooting was conducteu, the pressure lift setpoint was increased and the valve successfully retestod. !!o additional leakage has occurred.

The Reactor was taken critical at 1920 on October 3d.

I The Plant reaQed 97% power on October 4"'.

The plant is presently being maintained at 97% power as a result of the change made to the Reactor Coolant System maximum average temperature during the setpoint changes referenced above for OT6T.

The plant will remain at this power level until an engineering analysis is completed and changes accomplished to allow us to increase: our output.

th On October 18 the steam driven Auxiliary Foodwater Pump was taken out of service due to an apparent failure of the controller or governor during testing. Troubleshooting and testing could not duplicato or isolate the preblem. After a careful and thorough review of the actions taken the pump was returned to service on October 20'h with a daily test program instituted to ensure operability.

Because no abnormal results occurred during the daily J

testing, it was terminated on October 27"'.

Tests will be performed on the normal frequency, with some supplementary instrumentation and ovaluation.

x The plant onded the month in Mode 1, at 97% power.

MAINTENANCE Significant maintenance completed during this period includes:

Installed nylon discs on the Emergency Nitrogen Regulators.

Repaired Icakago in the Startup Boiler.

Conducted repairs to the Diesel Fire Pump.

[

Ropnited the ' B' Wasto Ons oxygen Monitor APPROVED Plar(,.tfetieral Manager y

OPERATING DATA REPORT 50-344 DOCKET NO.

DATE _Nnvombo r,19 89 COMPLETED 3Y _ F.

,1 Ulmer TELEPHONE S01-5 % -3713 Ext.4495 OPERATING STATUS Trojan Nuclear Plant Nees

1. Unit Name:

October. 19A9

  • Change over to daylight

. 2. Reporting Period:

3411 savings time adds one

3. Licensed ThermalPower (MWt):

I 1216 (1) hour.

4. Nameplete Rating (Gross MWe):

1130

)

f,. Design Electrical Rating (Net MWe):

1153

6. Maximum Dependable Capecity (Gross MWe): 1095
7. Maximum Dependable Capacity (Not MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Gin Reasons:

No chanao.

s_

AdministretIve Restrleted to 075 of rated Power.

9. Power Lewl To Which Restricted lf Any (Not MWe):

RCO tomooreture inntrument in occureev essumpt1ons mov cause

10. Reasons For Restrictions.lf Any:

enornsch of DNB Dernmeters to limits when enerntina at full Innd-Adminintention f

restriction in effect until enelvsts is comolete.

~ tidsMeath Yr to Date Commistin

  • 745 7296

__115416

11. Hows la Reporting Periog 677.7 3959.2 71238.2
12. Nasaber Of liours Reactor Was Critieel 0

0 3387

13. Roseter Reserw shutdown Hours 673.2 1899 A 70 tria 7
14. Heers Genereter On Line 0

0 3249

15. Unit Reserve Shutdown Heees 2206,786 12641729 224242729
16. Gsees Thermal Energy Generated (MWH) 743900 4257042 73786494 17.' Grom Electrieel Energy Generated (MWH) 707601 4014398 69882468
18. Not Electrieel Energy Generated (WWM) 90.4 52.5 61.o
19. Unit Service Factor 90.4 52.5 63.8
20. Unit Availability facto, 86.7 50.2 56.6
21. Unit Capacky Feeter (Usies MDC Net) 84.1 48.7 53.6

' 22. Unit Capacity Festor (Using DER Net)

O.

3.4 13.3 l

23. Unit Forced Outege Rae,

)

24. Shutdowns Sc~neduled Over Next 6 Months (Type. Dete.and Duration of Eacht:

l Annuel Refuelino Outene, Merch 21 1000 78 devs.

N/A

25. If Shut Down At End Of Report Pend.Catimated Date of Startsp:
26. Units in Test Status iPrior to Comnwrcial Operation):

Foreeset Achiewd l

1 N/A N/A INITIAL CRITICALITY N/A N/A INITIA L ELECTRICITY N/A N/A COMMERCIAL OPER ATION (Q/77)

.s.-

s 1

1 AVERAGE DAILY UNIT POWER LEVEL j

DOCKET NO: 50-344 UNIT: Trojan j

DATE: November, 1989 i

COMPLETED BY:J. J. Ulmer TELEPHONE: 503 sse-1711 ext 4 4 95 i

MONTH

' October, 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

-27 17 1061 2

-33 18 1062 i

3

-33 19 1066 4

742 20 1066 5

1065 21 1064 6

1060 22 1067 7

1064 23 1068 8

1062 24 1071 9

1061 25 1067 10 1066 26 1068 11 1070 27 1071 12 1066 28 1071 13 1065

  • 29 1072 14 1067 30 1071 15 1066 31 1068 16 1066 Timo Chango INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearett whole megawatt.

L911.D.

k C

4

.~-

1 DOCRET NO. 50-344:

I UNITSNUIDOWNS ANDFOWER REDUC 13ONS INST MAgeE Trnian a"

DATE Novenber. 1989 i

N.TED M E-1_ nwr l

REFORT800Nygt October.1989 TELEFOIONE 503-556-3713 ext 4195 l

1 tacensee g.,

gt.

o 4

Ij t

.i E

}

} g se can,ea c.,,,,,3,

g1

Aces, Ewm gy D3'e t

'!j s

.=

6=

el Ege Repart a en u gO r w ger,,,,,c, 2

2 v

6 04-89 890916 S

71.8 B

1 N/A CA' VALVEX

_ Continued Maintenance Outage?

i for pressurizer safety (PSV-8010C).

l i

t i

1 1

2 3

4 E lete G.Isnesiseslums Method:

F: Forced Reason:

e4 Data 5: Scheduted A-Eqalpenent Falhste(Explain)

I-Manuel Ear 7.,5heets for IJcensee B-Maintenmace eiTest 240sensf Screen.

Essery 3-Ameossessie Sc;sen.

- Evesit Report ILER)FErINUREG-C-Refueling 08618 D RegeIntoey Resselction 44)elser(EspIsin)

E-Opeastor Tesining A IJcense Esassinselon 5

F-Adannistsatise Eshhis f.5snee Sowesc f

G-Or,erational Ersag (Emplain)

.. nn n o,,c,it.is,,

., _ _ _ _ _ _. ~... _. _ _ _ _ _ _ _ _., _

m